Cavity Tray and Abutment Questions Checklist
Helps you recognise that ordinary additions create a junction against an existing wall, and prepare the questions about what that wall was doing, what the new junction has to do, and which party is responsible for drawing and building it.
7 sections · 39 planning prompts · educational owner-side preparation
https://www.builddesignhub.com/checklists/building-envelope-and-openings/cavity-tray-and-abutment-questions · Build Design Hub — educational planning resource. Requirements vary by project and location.
Scope
What this checklist covers
The preparation ground these prompts walk through.
- Recognising every place where new work would land against an existing wall
- What is known about how the existing wall is built, and what is only assumed
- What the existing weathering at that position was doing before the change
- Who draws the junction, whose package includes it and who builds each part
- Where water collected at the junction is meant to leave the wall
- Recording the junction before it is closed up, and protecting it afterwards
Audience
Who this checklist is for
- Owners adding a lean-to, canopy, porch or single-storey extension against a house wall
- Households having a flue, a roof or an outbuilding brought up against an existing wall
- Owners raising paving, decking or a planting bed against an outside wall
- Owners preparing questions for a designer about junctions with existing construction
Timing
When to use it
- Listing every junction a proposed project would create against existing walls
- Preparing questions for a designer about a junction nobody has mentioned
- Gathering what is known about how the existing wall is built
- Recording junctions photographically before they are covered up
- Understanding why the drainage of a wall matters at a junction
Limits
When it is not sufficient
This is general planning preparation. These situations need a qualified professional, and often the relevant authority.
- Deciding whether a tray is required anywhere, which is a professional design determination
- Judging whether an existing junction, flashing or opening is adequate or performing
- Specifying any part of a junction, its materials, its geometry or its construction
- Standing in for envelope design, a survey of an existing wall, or professional review
The checklist
Work through the sections
Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.
1.Recognising that you are creating a junction at all
Most owners commissioning this kind of work do not think of it as creating a junction. Listing them is the step that makes the rest of the conversation possible.
Walk the proposal through and list every place where something new would meet an existing outside wall, however small the new item is.
A canopy, a flue and a full extension all create the same kind of junction, and the small ones are the ones nobody raises.
Include anything that would be built up against the base of a wall, such as paving, decking, a planting bed or a step.
Work at the bottom of a wall is a junction with the existing construction just as much as a roof arriving part way up it.
Include anything that would be fixed to the wall rather than built against it, such as a canopy, an awning or a bracketed structure.
A fixed item is a different kind of junction from a built one, but both are things arriving on a wall that was not expecting them.
Mark each junction on a photograph of the elevation, so that the list and the building can be looked at together.
A marked photograph is the artefact that gets the junctions discussed, because it makes them impossible to overlook in a meeting.
Note for each junction which wall it lands on, including whether that wall is part of the original building or a later addition.
Walls of different ages may be built differently, so which one a new junction meets is a genuine distinction rather than a detail.
Include anything the project removes from a wall, such as an existing lean-to, canopy or pipe, since taking something off leaves a junction behind as surely as adding one.
Removals are thought of as clearing rather than as work on the wall, so what is left behind at that position is rarely anybody's item.
2.What the existing wall is, as far as anyone knows
How the existing wall is built determines what a junction has to do. An owner can gather evidence about it, but not conclusions.
Write down what you have been told about how the wall is built, who told you, when, and whether they had looked at it.
Descriptions of an existing wall circulate as fact long after the person who first offered one has been forgotten.
Search the property papers for any description of the wall, including survey wording and anything from previous work, and copy it out exactly.
Original wording from a dated document is something a professional can weigh, whereas a summary of it is not.
Photograph the reveals of existing windows and doors in that wall, since what is visible there is an observation you can make without disturbing anything.
Reveals are where a wall is most readable from outside, and photographs of them answer a surprising number of first questions.
What is visible at one opening is not evidence about the rest of the wall; how a wall is built can only be established by survey.
Look along the wall for small openings in the joints above windows, doors and at the base, and photograph any you find with their positions.
These openings are the only visible sign of an arrangement inside a wall, and knowing whether the wall has any is worth recording.
Note anything that suggests the wall has been altered — filled openings, changes in the face, added insulation, a rendered section — and photograph each.
Alterations change what is inside a wall, and they are the reason two walls that look alike can behave very differently.
Where nobody can say how the wall is built, write that down explicitly rather than allowing an assumption to stand in for it.
A stated unknown is what prompts somebody to establish the answer; an unstated one is simply designed around.
3.What the existing weathering at that position was doing
Something is usually already happening at the place where new work would land. Recording it before it changes is straightforward and rarely done.
Photograph the exact position where the new work would land, from several distances, before anything is removed or changed.
The before photograph is the only description of what was there, and once work starts it cannot be taken again.
Note any existing flashing, metalwork or weathering visible at or near the position, and photograph each one in place.
Existing weathering is frequently removed as part of the new work, and what it was doing is worth a question before it goes.
Look for a line, a chase, a row of filled holes or a change in the wall face suggesting something was once attached there, and photograph it.
Traces of a previous structure indicate that this junction has existed before, which is genuinely useful information.
Photograph and date the inside face of that wall, noting any existing stain, patch or decoration difference before the work begins.
A dated internal record is the only way to distinguish something existing from something that appeared after the work.
Watch what happens at that part of the wall during heavy rain if you can, and note where water runs and where it collects.
An observation made in the rain is worth several made in dry weather, and it is something only an occupier is in a position to do.
4.Who draws the junction and whose package includes it
Junctions between new and existing work fall between parties more often than any other part of a project. The question is who owns it, not what it looks like.
Ask whether there is a drawn detail for each junction you listed, and ask to see it rather than being told that it is covered.
Asking to see the detail is the difference between an assurance and a document, and it is an entirely ordinary request.
Ask which package or trade includes each part of the junction, and whether that has been confirmed with the people who will actually build it.
A junction crosses at least two trades, and the item at the boundary between them is the one that ends up in nobody's scope.
Ask in what order the parts of the junction are built and by whom, since one trade is often finished before another arrives.
Provision inside a wall has to be made while the wall is being built, by a trade who will have left before the roof arrives.
Ask what happens if the junction cannot be built as drawn once the existing wall is exposed, and who decides at that point.
Existing buildings reveal themselves during work, and knowing in advance who makes the decision is worth more than the drawing itself.
Ask what happens on the inside of the wall at that junction, including any finish, and who is responsible for it.
The inside face is frequently treated as a decorating matter, and it is the face where a problem at the junction would first show.
Keep the answers, the details you were shown and the names of who is responsible for each junction in one place with the project papers.
These answers are worth very little individually and a great deal as a set, particularly if anything is queried later.
Ask whether the project puts anything into or onto the existing wall, such as insulation or a new finish, and whether that changes what the junction has to do.
Work to the wall itself can change what a junction is dealing with, and it is usually designed by somebody other than whoever drew the junction.
5.Where water collected at the junction is meant to leave
A wall that drains internally needs somewhere for that water to go when something interrupts it. This is the question an owner can usefully ask and later protect.
Ask where water collected at the junction is meant to leave the wall, and whether those points will be visible from outside afterwards.
Discharge points that can be seen are the only evidence available afterwards that anything inside the wall is working.
Ask to be shown where those points are once the work is finished, and photograph them with their positions marked on an elevation.
Knowing where they are is what makes it possible to protect them, and nobody will point them out unless asked.
Look at what else the project involves near that position — paving, render, a planting bed, a step — and ask whether any of it would cover those points.
Work by a different trade arriving later is the most common way a discharge point is closed within the same project.
Where the project raises the ground or a surface against the wall, ask what that means for anything at the base of it.
Raising a surface against a wall is an ordinary landscaping decision that changes the position of the wall relative to the ground.
Whether a change in level against a wall is acceptable is a professional determination on the specific building, not something to judge by appearance.
Write down that these openings are meant to be open, and keep that note where anybody later repointing, rendering or painting the wall will see it.
These openings are read as defects and filled by people acting in good faith, and a written note is the only realistic protection.
6.The junctions people forget
Some positions are reliably overlooked. Raising them by name is more effective than asking generally whether the junctions have been considered.
Ask specifically about what happens where the junction turns a corner or returns along another face of the building.
Corners are where a continuous arrangement has to be re-formed, and they are frequently drawn only as a straight run.
Ask what happens where one part of the junction meets another, particularly where work by different trades comes together.
A join between two correctly built runs can still be a gap if it was formed the wrong way round, which is a design question.
Ask about anything that passes through the junction, such as a flue, a pipe or a cable, and who is responsible at that point.
Something passing through a junction is a second problem inside the first, and it usually belongs to a different trade again.
Flues carry combustion products, and any work affecting one belongs with a suitably qualified and registered professional in that field.
Note whether any junction is at or near a boundary, or involves a wall belonging to somebody else, and raise it before work is planned.
Work on or against a wall belonging to another owner has its own procedures, and it is not a matter to settle between households.
Working on a wall belonging to an adjoining owner may involve obligations that vary by location; confirm what applies with your own adviser.
Ask specifically about any junction landing on an earlier addition rather than on the original building, and what is known about that construction.
Earlier additions are the walls least likely to be documented and most likely to be assumed to match the original house.
7.Recording the junction before it is closed up
Once the junction is built it is invisible, and photographs taken during construction become the only account of what is in there.
Ask when each junction will be built and covered, and put those dates somewhere you will see them so photographs can be taken beforehand.
The window is short and nobody will tell you about it unless you have asked, which is why so few owners have these photographs.
Ask the designer and the builder whether they photograph junctions as they are built, and whether you can have copies.
People working on the junction can photograph it far better than you can from outside, and they are usually willing to share.
Take your own photographs only from where you are permitted to stand, and ask for any view you cannot reach safely.
Asking for a photograph is straightforward and avoids an owner climbing onto scaffolding to get one.
Do not go onto scaffolding, ladders or a roof to photograph a junction; ask somebody working there to take the view for you.
Mark every junction and every discharge point on one photograph of the finished elevation, and keep it with the property papers.
This single annotated photograph is the most useful thing to hand to anybody working on the outside of the building later.
Keep that annotated photograph where you will find it before any future work on the outside of the building, and show it to whoever is doing that work.
Decorators, roofers and landscapers arrive years later with no knowledge of what is in the wall, and this is how they find out.
Preparation
Documents and information to gather
Having these to hand usually makes the first conversation shorter and more useful.
- A photograph of each affected elevation with every proposed junction marked on it
- Whatever the property papers say about how the existing walls are built, copied out in their original wording
- Dated photographs of each junction position as it is now, from several distances, before anything changes
- Dated photographs of the inside face of the affected wall, recording any existing stain or patch
- The drawn details for each junction, or a note of which junctions have no drawn detail
- A written note of which package and which trade is responsible for each part of each junction
Records
Decisions to record before work begins
Write these down in your own words, with the date, so everyone is working from the same version.
- The full list of junctions the project creates, including small items and work at ground level
- What is known about how each affected wall is built, and where that is honestly unknown
- Who is responsible for drawing each junction and who builds each part of it
- Who decides if a junction cannot be built as drawn once the existing wall is exposed
- Where any discharge points are, marked on a photograph of the finished elevation
- That the annotated elevation is shown to anybody carrying out later work on the outside of the building
Professional review
Questions to discuss with qualified professionals
Bring these to the relevant qualified professional, supplier or authority. Requirements vary by project and location.
- Which junctions does this project create against the existing wall, and has each been reviewed?
- Is there a drawn detail for each of them, and may I see it?
- Which package includes each part of the junction, and has that been confirmed with the trade building the wall?
- In what order are the parts of the junction built, and by whom?
- What evidence is there about how this existing wall is built?
- Where does water collected at the junction leave the wall, and will I be able to see those points?
- What happens if the junction cannot be built as drawn once the wall is opened up?
- Does anything in this project, including landscaping, cover or raise ground against those points?
- What should I tell anybody who works on the outside of this building in future?
Blind spots
Commonly overlooked items
- Small items such as a canopy or a flue, which create the same kind of junction as an extension
- Work at the base of the wall — paving, decking, a planting bed — being a junction as well
- Corners and returns, where a continuous arrangement has to be re-formed
- Provision inside a wall having to be made by a trade who will have left before the roof arrives
- Landscaping arriving later in the same project and covering something at the base of the wall
- Small openings in the wall face being read as defects and filled during later repointing or decorating
- A junction landing on an earlier addition rather than on the original building
What this checklist does not do
- Whether any junction requires a tray, and what form it should take, is a professional design determination for the specific wall, exposure and construction.
- What is visible at one opening or one part of a wall is not evidence about the rest of it. How an existing wall is built can only be established by survey.
- Do not go onto scaffolding, ladders or a roof to observe or photograph a junction; ask somebody working there to take the view for you.
- Work on a wall belonging to an adjoining owner, and work affecting a flue, both carry obligations outside the scope of this checklist; take each to the appropriate professional.
More preparation
Related checklists
Inspiration
Related Ideas Library pages
Design directions to explore once the preparation is done.
Go deeper
Related Build Design Hub guides
Explanatory planning guidance behind the decisions on this page.
Building Envelope & Openings Checklists
Preparation checklists for walls, roofs, insulation, windows and doors — describing the building you have and the questions to raise about performance.
Browse all Envelope & Openings checklists →