Checklists · Renovation planning
Renovation Temporary Arrangements Planning Checklist
Help an owner design and agree the temporary arrangements a renovation requires, deciding what each one has to do, who provides it, where it stands and at which stage it is taken away.
7 sections · 40 planning prompts · educational owner-side preparation
https://www.builddesignhub.com/checklists/renovation-project-planning/renovation-temporary-arrangements-planning · Build Design Hub — educational planning resource. Requirements vary by project and location.
Scope
What this checklist covers
The preparation ground these prompts walk through.
- Deciding whether to stay in the property, and what would change that decision
- Setting up somewhere to prepare food while the kitchen is out of use
- Arranging washing, laundry and sanitary facilities during the work
- Where people sleep once rooms change use, and what each move displaces
- Temporary power, lighting and heat, and the questions those raise
- Who provides each arrangement, and the stage at which it comes out again
Audience
Who this checklist is for
- Owners intending to stay in a property while significant parts of it are out of use
- Households who need to keep cooking, washing and sleeping through a renovation
- People weighing staying put against moving out for part of the work
- Owners renovating the only bathroom or the only kitchen a property has
Timing
When to use it
- Working out which temporary arrangements the work actually makes necessary
- Deciding where each temporary set-up stands and what it needs in order to function
- Agreeing with whoever is doing the work which arrangements they provide and which are yours
- Setting the stage at which each temporary arrangement is expected to end
- Preparing questions about temporary supplies for suitably qualified trades
Limits
When it is not sufficient
This is general planning preparation. These situations need a qualified professional, and often the relevant authority.
- Deciding whether any temporary supply, connection or appliance is safe to use
- Determining what temporary arrangements any local requirement or lease permits
- Establishing how long any part of the property will remain out of use
- Judging whether a property is suitable to be occupied at any stage of the work
The checklist
Work through the sections
Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.
1.Deciding whether to stay put, and what would change that
This decision drives every other arrangement on the list. Make it deliberately, and decide in advance what would make you revisit it.
Write down what the household actually loses at the hardest point of the work, and read that list again before deciding to stay.
The decision is usually made against an average picture of the project rather than against its worst stretch.
Note who in the household would find it hardest, and give their view proper weight rather than deciding on their behalf.
Whoever is home most carries the arrangement, and their tolerance is what decides whether it holds.
Decide in advance what would make you move out temporarily and write it down while you are calm, rather than settling it mid-project.
A trigger agreed early turns a fraught decision into a simple one when the moment arrives.
Consider whether leaving for only the hardest part of the work is possible, and ask which stage that would be.
Partial arrangements are often overlooked because the choice gets framed as all or nothing.
Ask what would be different about the work itself if the property were empty, and record the answer as part of your decision.
An empty property sometimes changes the approach available, and that is worth knowing before you commit.
Tell whoever is carrying out the work what you have decided, because arrangements are made differently for an occupied property.
Occupation affects access, working patterns and how areas are separated from the rest of the property.
How work is organised around an occupied property is for the professionals carrying it out to determine, and it should be agreed with them in writing.
2.Somewhere to prepare food while the kitchen is out
A temporary kitchen fails on small things rather than large ones. Decide what it has to do before deciding where it goes.
List what the temporary arrangement actually has to do, such as boiling water, heating food, washing up and holding chilled food.
Listing the functions first stops you setting up a table with nothing useful on it.
Choose where it will stand, checking that the spot sits outside the work area and off the route materials and waste travel along.
A temporary kitchen in the way gets moved repeatedly, and it stops being used as soon as it moves.
Decide where washing up will happen, since this is the part most temporary kitchens turn out to be missing.
Carrying washing up to a bathroom is the arrangement households abandon first, and then everything else unravels.
Note what has to plug in and ask a qualified electrician what is appropriate before running anything from a temporary supply.
Temporary cooking arrangements draw more than people expect from whatever socket happens to be free.
Whether an appliance may be used on a particular supply or extension is a question for a qualified electrician, not something to judge by whether it appears to work.
Decide where the fridge and freezer will stand and confirm they can stay connected throughout, since their contents depend on it.
Moving cold storage is one of the most commonly forgotten parts of clearing a kitchen.
Plan where food waste goes from the temporary set-up, because the usual bin arrangement often sits inside the work area.
Food waste with no route out becomes noticeable very quickly in a property that cannot be aired normally.
3.Washing, laundry and sanitary arrangements
If the property has only one of something, losing it is the constraint the whole project ends up sequencing around.
Write down which facilities the property has only one of, since those are the ones that force an arrangement rather than an inconvenience.
A single bathroom changes the shape of a renovation more than almost any other factor.
Ask a qualified professional whether an existing fitting can stay usable while work goes on around it, and at which stage it cannot.
There is often a shorter gap without a facility than an owner assumes, but only the trades involved can say so.
Whether a fitting can remain connected and usable during the work is for the trades involved to determine and to confirm in writing.
Note where else the household could wash, and whether that arrangement depends on somebody else agreeing to it.
Arrangements resting on goodwill need asking about early rather than being quietly assumed.
Decide where laundry will be done and where it will dry, particularly if the usual place sits inside the work area.
Drying indoors in a property that cannot be ventilated normally creates problems of its own.
Ask what would be involved in keeping a temporary facility connected, and treat the answer as a specialist matter rather than a simple one.
Temporary connections involve the same trades and the same care as permanent ones.
Any temporary water, waste or sanitary connection must be arranged by suitably qualified trades and never improvised on site.
Set aside the things a washing routine depends on and keep them together, since they otherwise scatter across the property.
Small routines break down when the objects they rely on no longer have a fixed home.
4.Where people sleep once rooms change use
Sleeping arrangements move quietly during a renovation, and each move displaces something else that nobody planned for.
Map who sleeps where at each stage of the work, and note what each move displaces from the room being moved into.
The second displacement, rather than the first, is the one nobody plans for.
Note anyone who sleeps at unusual hours or is easily woken, and raise it before working patterns are settled.
Sleeping patterns can sometimes shape when noisier work happens, but only if they are known early enough.
Decide what happens if somebody needs to stay, rather than discovering there is nowhere once the question is already live.
Households usually keep a spare arrangement without noticing that it sits inside the work area.
Consider what a change of room means for a child who depends on where their things are, and plan what moves with them.
For younger children the familiar objects matter considerably more than the room does.
Note what each temporary sleeping space lacks, such as somewhere to hang clothes or a working light, and arrange those before the move.
A bed in a room is not a bedroom, and the missing parts are what drive people back into the work area.
Record where clothes and bedding for the displaced rooms will be kept, so nobody is walking into the work area for a jumper.
Routine trips into a work area are how dust spreads through a property and how accidents happen.
5.Temporary power, lighting and warmth
This is the area where improvisation is most tempting and least appropriate. Ask about it rather than arranging it.
List what must keep working throughout and hand that list to whoever is carrying out the work, rather than assuming it is obvious.
Assumptions about what counts as essential differ enormously between households and trades.
Ask what lighting will be available in rooms whose fittings are out, and how you are expected to move around the property when it is dark.
Circulation through a part-finished property is the thing most often overlooked in planning.
Any temporary lighting or power arrangement must be provided and connected by a qualified electrician, not assembled from whatever is to hand.
Ask at which stages heating will be unavailable and what is proposed instead, and record what you are told.
Losing heat matters very differently depending on the time of year and on who is in the property.
Ask what arrangement is proposed for temporary power rather than accepting extension leads run through doorways and across the routes people walk.
Leads crossing the routes people walk are a recurring concern in an occupied property, and the alternatives are worth asking about early.
How power is distributed temporarily around a property with work in progress is for a qualified electrician to arrange and to confirm.
Decide where phones, laptops and anything the household depends on will be charged once the usual sockets are out of use.
This looks trivial until the only working socket turns out to be inside the work area.
6.Keeping the property secure and covered in between
Temporary states in the fabric of a property deserve the same attention as temporary states in the kitchen.
Ask what happens at the end of each stage where an opening has been made, and who is responsible for closing it.
Responsibility for a temporary closure is usually assumed rather than actually assigned to anyone.
How an opening is made safe and weathertight is for the professionals carrying out the work to determine and to state in writing.
Note which doors and windows can still be locked at each stage, and agree how the property is secured when nobody is there.
Renovations frequently remove the very things a property is normally locked with.
Speak to your insurer about the property being occupied while work is under way, and record what you are told.
Cover positions can change during works and are much better clarified before anything starts.
What your insurer requires while work is in progress is for them to state, and it should be confirmed with them directly rather than assumed.
Note what you would want covered if the weather turned while an opening was in place, and raise it as a question rather than an instruction.
Owners usually see the weather change before anyone else does, so knowing who to contact matters.
Decide where anything valuable or irreplaceable is kept while people are coming and going, and settle that before work begins.
This is a simple arrangement in advance and an awkward one to raise once a routine has formed.
7.Who provides each arrangement and when it ends
Temporary arrangements outlive their usefulness unless somebody decides when they stop. Write down both ends of each one.
Go through each temporary arrangement and write down who provides it, who sets it up and who takes it away again.
Arrangements with nobody named against them are the ones that never actually appear.
Tie each arrangement to the stage it must last until rather than to a date, since sequences move and dates get repeated as promises.
Stage-based planning survives a change in sequence, and date-based planning does not.
Check each arrangement against what it physically needs, such as a work surface, a socket within reach and a door that closes, before relying on it.
Temporary arrangements fail on a missing detail rather than on the idea behind them.
Decide what you would do if an arrangement had to continue beyond the stage you planned for, and write that fallback down.
A fallback written down calmly is worth a great deal at the point a sequence changes.
Agree who removes each temporary arrangement and what is done to make good where it stood.
Reinstating the spot where a temporary set-up stood is easy to leave unassigned, and it is rarely written down as anyone's responsibility.
Set a point at which you review the arrangements together rather than waiting for one of them to fail.
Most temporary arrangements degrade gradually and are only ever discussed once they have stopped working.
Preparation
Documents and information to gather
Having these to hand usually makes the first conversation shorter and more useful.
- A stage-by-stage note of which facilities are unavailable, as described by the professionals involved
- A written list of the temporary arrangements you intend to make and what each one needs
- Your insurance paperwork, so occupation during the works can be raised with the insurer
- Manuals or requirements for any appliance you intend to keep running temporarily
- A marked plan showing where each temporary set-up will stand and how it is reached
- Contact details for anyone outside the household that an arrangement depends on
Records
Decisions to record before work begins
Write these down in your own words, with the date, so everyone is working from the same version.
- Whether the household stays throughout, and what would trigger a decision to move out
- Where food will be prepared, washed up and kept chilled while the kitchen is unavailable
- Where washing and laundry will happen, and what those arrangements depend on
- Who sleeps where at each stage, and what each of those moves displaces
- Which equipment must keep running throughout, and who has been told about it
- Who provides, sets up and removes each temporary arrangement
- The stage at which each temporary arrangement is expected to end
Professional review
Questions to discuss with qualified professionals
Bring these to the relevant qualified professional, supplier or authority. Requirements vary by project and location.
- At which stage does each facility become unusable, and when does it come back into use?
- Can any existing fitting stay connected and usable while work goes on around it?
- What temporary lighting and power will be available, and who arranges and connects it?
- What do you propose for heating during the stages when the existing arrangement is off?
- Where would you prefer our temporary kitchen to stand so that it is out of your way?
- Who closes and secures an opening at the end of a stage, and what does that involve?
- Does the property being occupied change how you would organise any part of the work?
- What would you need from us if we decided to move out for part of the work?
Blind spots
Commonly overlooked items
- Where washing up happens, which is the part most temporary kitchens turn out to lack
- Keeping the fridge and freezer connected once the kitchen they stand in is cleared
- Where laundry dries in a property that cannot be ventilated in the usual way
- What a temporary bedroom lacks, such as a working light or somewhere to hang clothes
- Moving around a part-finished property in the dark once fittings have been taken out
- Deciding who removes each temporary arrangement and makes good where it stood
- Telling your insurer that the property remains occupied while work is under way
What this checklist does not do
- Temporary supplies, connections and appliances are for suitably qualified trades to arrange; nothing here indicates that an improvised arrangement is safe to use.
- This checklist does not indicate how long any facility will be unavailable, so tie arrangements to stages rather than to expected dates.
- Whether a property is suitable to remain occupied at any stage is a matter for the professionals carrying out the work, in discussion with you.
- Your insurer sets what applies while a property is occupied during works, so raise the arrangement with them before relying on it.
More preparation
Related checklists
Inspiration
Related Ideas Library pages
Design directions to explore once the preparation is done.
Go deeper
Related Build Design Hub guides
Explanatory planning guidance behind the decisions on this page.
Renovation Project Planning Checklists
Preparation checklists for renovation projects — scope, sequencing conversations, existing conditions to document and decisions to agree before work starts.
Browse all Renovation Planning checklists →