Construction · Handover · Documentation

What Record Should Exist of a Concealed Envelope

Published

Almost every published envelope record ends on the same note, and it is not a technical one. The wall cannot be inspected later without damage. The void is no longer available for anything. Panel layout and taping sequence are fixed before manufacture and largely unrecoverable afterwards. Whether a roof was built as it was intended is often unrecoverable from the finished building. Each entry then asks for a record, and each says what the record is for.

That purpose is worth stating plainly, because it is not proof of quality. The records describe the record as what allows a later air test result, damp investigation or alteration to begin from evidence rather than from guesswork, and as what lets a future owner know what they actually have. It is an input to a future question, not a certificate about a past one.

This guide collects what the records ask for into one list, and says who each item is for and why it is asked. It sets no format and no standard, because what is appropriate depends on the building, and because the records are consistent that where a document is held decides whether it is ever consulted.

Who this guide is for

  • Clients approaching handover on a new build or a major envelope upgrade
  • Owners who have just bought a building and want to know what exists
  • Renovators about to conceal work they will not see again
  • Anyone who may need to alter, extend or investigate the envelope later
  • Self-builders deciding what to photograph before closing up

What the record is for

The framed wall record is the clearest about the purpose. A photographic record taken before closing, keyed to each elevation, is what a later air test result or damp investigation can be interpreted against. That is a statement about interpretation rather than about compliance: the record does not say the work was good, it says what the work was.

The cavity wall record makes the same point for the void, describing a record of the insulation arrangement, tie type, interception positions and outlet locations as what allows a later damp investigation to begin from evidence rather than from guesswork. The retrofit record goes further and says that where the record is thin, later damp diagnosis has nothing to work from.

  • It is evidence to interpret against, not proof of quality
  • It answers what was built, not whether it was built well
  • Its readers are future investigators, alterers and owners
  • Where it is held decides whether it is used

Where the control layer runs, and where fixings may be made

The internal lining record asks for this in the most useful possible form for an owner. A finished insulated lining is indistinguishable from an ordinary wall, so a drawing of what was installed, where the control layer runs and where fixings may safely be made is what gives ordinary later work any chance of missing it.

The mass timber record asks for the equivalent where the structure is the barrier: recording what was built and where the barrier lines run is what makes later alteration possible without cutting into a structural air barrier. In both cases the useful drawing is one that can be read by somebody hanging a shelf, not only by a designer.

Where the concealed interception sits

The cavity tray record identifies the weep openings as the only visible part of the arrangement, and notes that they are routinely filled during repointing, rendering or painting by someone who reads them as defects. Its conclusion is that recording their purpose is the only realistic protection an owner has.

The abutment record asks for something related but different: not the material of the flashing but who provided the concealed tray. The masonry wall record asks for interception positions and outlet locations. Together those three give an owner enough to answer the two questions that arise later, which are whether something is there and where what it collects is supposed to leave.

  • Interception positions and where each one discharges
  • The purpose of every visible opening, so it is not filled
  • Who provided the concealed items, not only what they are
  • Whether a survey found interception at existing interruptions

Which panel is which, and which unit is which

On a facade of near-identical units this is a practical necessity rather than an archive. The precast record states that a facade of near-identical units is easy to misread on site, and that the drawings are what distinguish one panel from its neighbour, asking for panel marks, fixing types and joint details. Without them no later intervention is straightforward.

The curtain walling record asks for the same in its own vocabulary: unit marks, glass types, gasket references and drainage details, because a facade of near-identical bays is difficult to describe after the fact and a later repair otherwise begins by identifying what is already there. The composite panel roof record adds the availability of matching panels as something worth establishing early.

What was found in the void

This item is specific to work on existing buildings, and the retrofit record treats it as the whole evidence base. The survey findings, the fill placed, the treatment of openings and the reinstatement are described as the entire evidence base for a concealed alteration, and the record says plainly that what was found in the void is the only evidence anyone will have when a damp patch appears on an internal face long afterwards.

The internal lining record asks for the same before a wall is covered, describing a baseline record of the wall's condition as what makes later diagnosis possible, and noting that once complete the wall behind the lining cannot be inspected and any damp appearing outside is harder to interpret.

  • What the survey found, and at how many points on which elevations
  • What was placed, and where it could not be placed
  • How existing vents, flues, ducts and interception were treated
  • The condition of the wall before it was covered

What the building is supposed to do

Two records ask for something that is neither a position nor a condition, but an intention. The attenuation roof record notes that a roof designed to hold water looks exactly like a defective roof, and asks for the fact that the behaviour is intended, and how the restriction works, to be recorded so that anyone arriving later has a reason not to clear it.

The trafficked deck record asks for the equivalent about access: which areas are intended to be lifted, where the outlets are, and how debris is removed from the void, because a later owner sees paving and nothing else. Both are records of intent, and both exist because the alternative is somebody helpfully undoing the design.

When it has to be made

Every item on this list has a moment, and most of them are earlier than handover. The record of a void is made before the outer leaf closes. The record of a liner is made the day it is finished. The record of an inverted roof's waterproofing is made before the surfacing goes on, which is why its published question asks how the concealed layer will be checked before it is covered and what record will exist afterwards.

That is why asking for the record at handover is usually too late to create it and only just in time to receive it. The request belongs in the same conversation as the programme, alongside the question of when each layer becomes permanently concealed.

What a record cannot do

It cannot make an uninspected layer inspected, and it cannot substitute for a design assessment. The records are careful here: they ask for what was built, what was found and what was assumed, and they leave the interpretation to whoever is qualified to make it. The bridging record's phrasing is representative, asking for which junctions were considered and what was assumed, so that a later alteration does not require repeating the whole exercise.

It also cannot help anyone who does not know it exists. The internal lining record's observation that where the drawing is held decides whether it is ever consulted is the most practical sentence in the whole subject, and it applies to every item above.

What to ask for at handover

  1. 1A drawing showing where each control layer runs through the building
  2. 2A drawing showing where fixings may safely be made in lined or panelled walls
  3. 3Photographs of each elevation before the linings and cladding closed it, keyed to position
  4. 4Positions of all concealed interception and where each one discharges
  5. 5The purpose of every visible opening in the external face, so none is filled
  6. 6Panel, unit and bay marks for any facade of near-identical elements
  7. 7Glass types, gasket references and joint or drainage details for a glazed facade
  8. 8Survey findings for any existing wall or void that was altered
  9. 9A record of what was placed, and where it could not be placed
  10. 10How existing vents, flues, ducts and interception were treated
  11. 11A statement of any behaviour that is intended but looks like a fault
  12. 12Which parts of a terrace or roof surface are designed to be lifted, and how
  13. 13Where outlets, restrictions and access points sit beneath a finished surface
  14. 14Confirmation of where all of the above will be held after handover

Common mistakes to avoid

  • Asking for the record at handover rather than when each layer is being covered
  • Accepting a specification in place of a record of what was actually built
  • Leaving the record with the contractor rather than with the building
  • Recording the material of a concealed item but not who provided it
  • Omitting what a survey found, which is the only evidence about an existing void
  • Failing to record that standing water or an open joint is intended behaviour
  • Treating the record as proof of quality rather than as evidence to interpret against

When to involve a professional

  • Ask the design team which junctions were assessed and what was assumed about each
  • Ask the contractor what will be photographed, at what stage and keyed to what
  • Ask for the positions of concealed interception and their discharge points
  • Ask for panel, unit and component references for any repeating facade
  • Ask what will be recorded about the condition of any existing construction before covering
  • Agree in writing where the completed record will be held and who maintains it

Frequently asked questions

Questions readers ask about this topic

Is this record the same as an as-built drawing set?

It overlaps but it is narrower and more specific. The published records ask for where the control layer runs, where fixings may be made, where concealed interception sits, what a survey found in a void and which behaviour is intended, which is often not what a general as-built set contains.

Does the record prove the work was done properly?

No, and the records do not claim it does. They describe it as what a later air test result, damp investigation or alteration can be interpreted against, and as what lets a future owner know what they have. It answers what was built rather than whether it was built well.

Why does it matter who provided a concealed item?

Because it is the question a later investigation asks first. The abutment record states that recording who provides the concealed tray is more useful than specifying the flashing metal, since the material survives a change of programme and an assumption about scope does not.

What if the building already exists and no record was kept?

Then the records treat it as a survey question for a qualified professional rather than something to infer. They also caution that a survey based on a few openings in one elevation is not evidence about the whole building, because exposure, repair history and what was left behind all vary around it.

Where should the record be kept?

With the building rather than with the people who built it. The internal lining record notes that where the drawing is held decides whether it is ever consulted, which is why the practical request is to agree in writing who holds it, in what form, and how a future owner would find it.