Addition Scope and Phasing Decision Checklist
Helps an owner separate what an addition must achieve from what has drifted into the idea, decide honestly what could be left for later, and record the scope in words that a qualified professional and the household read the same way.
7 sections · 42 planning prompts · educational owner-side preparation
https://www.builddesignhub.com/checklists/additions-and-conversions-planning/addition-scope-and-phasing-decisions · Build Design Hub — educational planning resource. Requirements vary by project and location.
Scope
What this checklist covers
The preparation ground these prompts walk through.
- Separating the requirements of an addition from the wishes attached to it later
- Identifying work that becomes far harder once the new structure is closed up
- Deciding what to leave provided for rather than finished, and recording where it is
- Working out whether the project can honestly be split and where a stage would stop
- Writing down what is deliberately outside the project so it does not drift back in
Audience
Who this checklist is for
- Owners weighing whether to build the whole addition at once or in stages
- Households whose addition brief has grown steadily since it was first described
- People who want to leave part of a new space unfinished without regretting it later
- Owners who need to describe an addition in writing before anyone can respond to it
Timing
When to use it
- Sorting requirements from preferences before an addition is designed around both
- Deciding what would be left provided for and recording exactly where that provision sits
- Preparing questions about splitting a project into stages for a qualified professional
- Writing an honest list of what the project does not include
- Agreeing within a household what would make you stop and reconsider the whole scheme
Limits
When it is not sufficient
This is general planning preparation. These situations need a qualified professional, and often the relevant authority.
- Anything to do with when work happens or in what order it can be carried out on site
- Deciding whether a project may be built in stages, which depends on matters to confirm locally
- Settling responsibility between parties, which needs proper agreements and appropriate advice
- Judging whether leaving part of a scheme unfinished is acceptable in any regulatory sense
The checklist
Work through the sections
Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.
1.Separating what the addition must do from what you would like
Almost every addition brief contains two different lists pretending to be one. Pull them apart before anything is drawn.
Write a plain list of what the addition has to make possible, in the words you would use talking to a friend, before a single drawing exists.
Requirements written in ordinary language survive translation into a design; requirements written as products do not.
Mark each entry on that list as something you would not proceed without or something you could let go if it came to it, and be honest about the difference.
The list you are unwilling to grade is the list that quietly grows, because nothing on it is ever the thing that gets dropped.
Note beside each entry where it came from, whether it was your own frustration with the house, an image you saw or a suggestion from somebody else.
Ideas that arrived from elsewhere tend to be defended as if they were needs, and tracing them back makes the conversation easier.
Record which problems in the existing house the addition is actually meant to solve, since that is usually the real reason the project started.
Schemes drift away from the original complaint, and a household can end up with more space and the same daily annoyance.
Decide and record your position on a smaller structure finished properly against a larger one left partly unfinished, before anyone asks you to choose under pressure.
This decision gets made in every project, and it is far better made calmly with the household than late and reluctantly.
Ask a designer which of your stated requirements pull against each other, and record the conflicts rather than expecting all of them to survive.
Naming conflicts early turns them into decisions you make, rather than compromises that appear in a drawing without explanation.
2.Work that only makes sense while the structure is open
Some work is straightforward while things are open and genuinely awkward afterwards. Identify it before anything is closed up.
List the work in the existing house that becomes far less disruptive while walls and floors are already open, such as pipe runs, cabling or work on an adjoining wall.
The chance to do this work under the same disruption comes once, and it is usually missed by nobody having listed it.
Note what sits behind or above the point where new meets existing, and ask what would be permanently concealed once the two are joined.
The junction hides more than anywhere else in the project, and it is the least examined part of most schemes.
Only a qualified professional can say what remains reachable at that junction and what would be sealed away for good once the two parts are joined.
Record whether the heating and hot water arrangement would have to be altered regardless, since that changes what else is worth doing at the same time.
Once the heating is being touched, several other decisions become sensible to make together rather than separately.
Note which existing floors, decorations and joinery would be disturbed by the work regardless of what you choose, and treat those as already in the conversation.
Work that will be disturbed anyway is the natural place to extend a scope, and people usually realise it after the decorator has gone.
Note work on the existing building that depends on access being available outside, such as attention to gutters, render or a roof edge, and raise it before access is removed.
Access to an elevation is temporary, and the list of things that needed it tends to be written afterwards.
What can be reached safely and by whom is a matter for the professionals involved; do not plan owner work around access provided for others.
Ask which decisions must be made before the structure is closed up, and write that list somewhere it will be looked at rather than filed.
The moment these decisions have to be made is set by the work itself, and it arrives sooner than most households expect.
3.Deciding what to leave provided for rather than finished
Leaving provision is a real option, but only if it is described precisely and recorded where somebody will find it.
Decide which parts of the scheme would be provided for but not fitted, and write each one down as a specific item rather than as a general intention.
A vague intention to allow for something later is not provision, and it is discovered to be nothing at all when the time comes.
Ask what leaving provision for a particular item would actually involve here, and who would record precisely what was left and where.
Provision means different things to different people, and the difference only shows up when somebody comes to use it.
What can be left in place safely, and how it must be terminated or protected, is entirely a matter for the qualified professionals involved.
Note the difference between leaving a route for something and leaving a connection for it, and be clear which you are asking for in each case.
Owners usually mean one and are given the other, and the misunderstanding is invisible until the wall is closed.
Photograph the surfaces of each stage as they are closed up, and file the images against the version of the scope that was current when that work was done.
Tying images to a scope version is what lets a later stage establish what was agreed and built, instead of guessing from a finished wall.
Record whether leaving provision for a future item constrains the layout now, and decide whether the constraint is worth accepting.
Provision is not free of consequences, and a layout bent around a possibility can be worse than one that ignores it.
Decide which items you would rather do fully now than half do, and record why, so the reasoning survives the next conversation about trimming the scheme.
Half finished items accumulate, and each one was a sensible compromise at the time nobody wrote down.
4.Where one stage would have to stop and stand
A project can only be split where it can sensibly pause. Ask where that point is rather than assuming it exists anywhere you like.
Ask a qualified professional whether this scheme can honestly be split at all, and where a natural stopping point would be if it can.
Owners tend to assume a project pauses wherever suits them; the structure and the sequence often say otherwise.
Whether a project may be built in stages depends on matters to confirm with the local authority and with the professionals involved.
Ask what a paused stage would need in order to be weathertight and secure, and note that as part of the stage rather than as an extra.
The work required to leave something standing safely is frequently left out of the description of the stage it belongs to.
Write down which parts of the house would be unusable between stages and confirm with everyone living here that this is acceptable.
The household member who was not part of that conversation is the one for whom the pause becomes intolerable.
Ask what would have to be undone, opened up again or repeated if the next stage happened well after the first, and record the answer plainly.
Splitting a project has consequences at the join, and they are far easier to accept when they were described in advance.
Ask what happens to responsibility for the work across a gap between stages, and whether the same people would be expected to return.
Responsibility across a pause is one of the least discussed parts of phasing and one of the most awkward afterwards.
Responsibility, insurance and agreements between parties need proper documents and appropriate advice; nothing here settles any of it.
Ask what would have to be confirmed locally if the project were carried out in stages rather than as one piece of work.
This is a question for the authority and your professionals, and asking it early avoids assuming that a split is neutral.
5.Living in the house while each stage happens
The scope you choose decides how the household lives. That belongs in the decision rather than being discovered afterwards.
List which rooms and facilities would be out of use during the work, and write down what the household would use instead in each case.
Naming the substitute makes the arrangement real, and it exposes the gaps that nobody had thought about.
Record where cooking, washing up and food storage would happen if the work meets the kitchen, and whether that arrangement is realistic for everyone here.
The temporary kitchen is the single arrangement most likely to decide how a household experiences the whole project.
Note where the laundry, the bins, the boiler and the meter cupboard sit in relation to the work, and how each would be reached while it goes on.
These are the small daily routes that get blocked, and they are never on the drawing that everybody is looking at.
Write down the household constraints that matter, such as someone working from home, unusual working patterns, a young child, a pet or someone with limited mobility.
Stating constraints early lets them be planned around; raising them late turns them into complaints.
How work is organised around people in the property is a matter for the professionals responsible for the site, not an owner arrangement.
Note where materials and spoil would be stored, where vehicles would stand and whether that uses the space you rely on for parking or access.
Space on site is a real constraint that owners can assess honestly before anybody has to raise it with them.
Decide and record the point at which you would rather move out than continue living here, and say it plainly before the work begins.
A household that has already discussed this makes a calmer decision than one confronting it in the middle of the work.
6.What is deliberately outside this project
Writing down what is not included is as useful as writing down what is, and it is almost always skipped.
Write an explicit list of what this project does not include, so that items which have been discussed but not adopted do not quietly return.
An exclusions list is the simplest defence against scope drift, and it takes only a few lines to make.
Note which known defects in the existing property are deliberately being left for now, and record that you know about each of them.
Leaving something alone knowingly is a decision; leaving it alone by omission is how it gets discovered as a surprise later.
Record whether making good the garden, paths, fences and planting is inside or outside the project, and say so before anyone starts.
Reinstatement outside is the most commonly assumed inclusion and one of the most commonly excluded items.
Note who deals with decoration where new work meets existing surfaces, since that boundary is where responsibility usually blurs.
The join is nobody's first priority and everybody's lasting impression of the finished work.
Record what should happen to items removed during the work, such as a door, a radiator, a garage door or fitted shelving, and which you want kept.
Anything not claimed in advance leaves the site, and some of it is worth keeping for a future stage.
Note anything you intend to carry out yourself, and raise where that boundary sits before the scope is described to anyone else.
Owner work inside a professional scope has to be agreed openly, and it affects far more than the item itself.
Where owner work meets professional work, the boundary needs to be agreed in writing with the parties involved and appropriate advice taken.
7.Writing the scope so everyone describes the same project
The scope only exists once it is written in a form other people can respond to. Make it one document, not a series of remarks.
Put the scope into a single dated document and reissue it when it changes, rather than annotating an old version or relying on later messages.
Scattered changes across conversations are the most common reason two people describe the same project differently.
Describe what each part of the scheme has to achieve rather than naming a particular product or arrangement, so professionals can respond properly.
A scope written as a shopping list closes off answers that might have suited you better.
Write what each stage would include in terms that an owner and a professional would read the same way, then ask whether that is how they read it.
Checking that your description means what you think is a short conversation that prevents a long one later.
Ask what is missing from your scope description before anyone could respond to it properly, and note exactly what was asked for.
The list of what is missing is a useful document in itself and shows how well the project is understood.
What information is needed before work can be described or carried out is for the qualified professionals involved to specify.
Go through your scope and rewrite anywhere you have described a solution as though it were a requirement, restating the need behind it.
Half of most briefs are solutions in disguise, and each one closes a door before anybody has looked through it.
Keep a short record of what changed between versions of the scope and why, so decisions can be traced rather than argued about.
The reasoning behind a change is the first thing lost and the thing most needed when a change is questioned.
Preparation
Documents and information to gather
Having these to hand usually makes the first conversation shorter and more useful.
- Your own plain list of what the addition has to make possible, marked firm or loose
- Any drawings or sketches produced so far, each with a date so versions can be told apart
- Notes of what has already been discussed and either adopted or set aside
- A written list of known defects in the existing property you are choosing not to address now
- Dated photographs of the existing rooms and surfaces that the work would disturb
- Household notes on constraints, routines and what would have to keep working during the work
Records
Decisions to record before work begins
Write these down in your own words, with the date, so everyone is working from the same version.
- Which requirements you would not proceed without and which you would let go
- Whether you would prefer a smaller structure finished properly to a larger one left partly done
- Which items would be provided for rather than fitted, and where that provision sits
- What is deliberately excluded from this project, including reinstatement outside
- The point at which the household would move out rather than carry on living here
- Which items removed during the work you want kept rather than taken away
Professional review
Questions to discuss with qualified professionals
Bring these to the relevant qualified professional, supplier or authority. Requirements vary by project and location.
- Can this scheme honestly be split into stages, and where would a natural stopping point be?
- What would a paused stage need in order to be weathertight and secure while it stands?
- Which of my stated requirements pull against each other in a scheme of this kind?
- What work in the existing house becomes far less disruptive while everything here is open?
- What would leaving provision for that item actually involve, and who records where it is?
- What has to be confirmed locally if the work is carried out in stages rather than in one go?
- What would have to be undone or repeated at the join if the second stage happened much later?
- What is missing from my description of the scope before you could respond to it properly?
Blind spots
Commonly overlooked items
- Work on the existing building that quietly depends on access being available outside
- The point at which the structure closes up, quietly settling when decisions must be made
- Making good the garden, path and fence, assumed by the owner and excluded by everyone else
- Half finished items from an earlier stage that everyone has stopped noticing
- The daily route to the bins, the boiler or the meter cupboard passing through the work
- Removed doors, radiators and fittings that leave the site before anyone claims them
What this checklist does not do
- This checklist is about deciding and recording scope; it says nothing about when work happens or in what order it can be carried out.
- Staging a project is not a neutral administrative choice; what it changes has to be established with your professionals and confirmed locally.
- Leaving provision for future work only means something when a qualified professional has specified and recorded what was left and where.
- Boundaries of responsibility between an owner, a designer and whoever carries out work need proper agreements and appropriate advice.
More preparation
Related checklists
Inspiration
Related Ideas Library pages
Design directions to explore once the preparation is done.
Go deeper
Related Build Design Hub guides
Explanatory planning guidance behind the decisions on this page.