Checklists · Additions
Home Extension Planning Preparation Checklist
Helps an owner turn a vague wish for more space into a written description of the existing house, a usable brief for the new space, and a list of consent, structural, drainage and services topics to raise with qualified professionals.
8 sections · 48 planning prompts · educational owner-side preparation
https://www.builddesignhub.com/checklists/additions-and-conversions-planning/home-extension-planning-preparation · Build Design Hub — educational planning resource. Requirements vary by project and location.
Scope
What this checklist covers
The preparation ground these prompts walk through.
- Describing the existing house, its alterations and its defects accurately
- Turning a wish for more space into an activity-based brief
- The junction between new space and the rooms that already exist
- Ground, drainage and buried features visible from the surface
- Consent, boundary and shared-structure topics to confirm locally
- Assembling the drawings, photographs and lists a professional will ask for
Audience
Who this checklist is for
- Owners thinking about extending a home for the first time
- Households outgrowing a plan they otherwise like
- Owners who have been given conflicting informal opinions
- People who want to know what a designer will ask before the meeting happens
Timing
When to use it
- Owners at the stage of gathering information rather than drawing
- Households comparing extending against moving or reorganising
- Owners who want to arrive at a professional meeting prepared
- People who need to separate fixed requirements from flexible ones
- Owners recording what neighbours and authorities have told them
Limits
When it is not sufficient
This is general planning preparation. These situations need a qualified professional, and often the relevant authority.
- Deciding whether any consent or permission applies to your property
- Establishing whether a wall, floor or foundation can carry a change
- Replacing a measured survey or a professional condition report
- Working out drainage, heating or electrical capacity for the enlarged house
The checklist
Work through the sections
Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.
1.Describing the existing house as it stands
Most early extension conversations stall on missing information about the building that is already there. These prompts cover what you can observe yourself or find in your own paperwork.
Write down what you know about how the house was built and what has already been altered or added, including anything a previous owner did before you moved in.
Earlier alterations usually explain odd floor levels, blocked openings and patched brickwork, and a designer will ask about them before proposing anything.
Note where your title documents show the boundary running, and where fences, hedges or walls actually sit on the ground compared with that recorded line.
A boundary that has drifted from the recorded line changes what can sensibly be drawn, and it is far easier to establish now than after a layout is agreed.
Boundary interpretation is a legal matter; raise it with your conveyancer or a qualified professional rather than relying on where the fence happens to stand.
Sketch roughly how the existing roof drains at the rear and sides, noting where gutters run, where downpipes land and whether any of them discharge towards a neighbouring plot.
An extension almost always interrupts an existing rainwater route, and having that visible on paper early prevents a late redesign of the roof edge.
Record every step or change of floor level between the rooms nearest the proposed extension, including the step out to the garden if there is one.
Level changes drive the whole ground build-up, and owners often assume a flat run through the enlarged plan when the existing house does not offer one.
Note where the incoming water, electricity and gas supplies and their meter boxes sit, and whether any of them are on a wall a new structure might enclose.
Supply positions and meter boxes on an affected wall raise supplier questions that follow their own process, entirely separate from the design conversation.
Only the relevant utility supplier can say what moving or enclosing a meter involves; ask them directly and keep a written note of the answer.
List any existing signs of damp, cracking or movement on the walls near where you are thinking of building, and photograph each one before anything changes.
Existing defects shape what a professional advises and how they judge the risk of the unknown, and photographs taken beforehand are far more useful than a recollection.
2.Working out what the new space actually has to do
An extension brief is much stronger when it describes activities rather than room names. These prompts turn a general wish for more space into something a designer can respond to.
List the activities the new space has to hold on an ordinary evening and on the busiest occasion you can imagine, then note which of the two you would rather it suited.
Spaces designed only for the rare gathering often feel wrong the rest of the time, and saying which case wins gives a designer something to work against.
Decide and record whether the new space replaces something you already have or adds to it, because that determines what then happens to the room it replaces.
Owners frequently gain a large new room and quietly lose a dining room or a study without ever having decided to, which shows up only once the plan is drawn.
Write down whether the new space has to work with a door closed on it, for noise, cooking smells or heat, or whether it is always open to the rest of the plan.
Open plan and closed plan lead to different structural and heating conversations, and this is one of the few briefing decisions an owner can settle alone.
Note the largest pieces of furniture that must fit, measuring them roughly yourself, and mark which are fixed choices and which you would replace.
A table or sofa that cannot be given up is a real constraint, and stating it early is more honest than discovering it once the walls are set.
Consider where the storage that currently lives in the area being built on would go once the extension takes its place, and write down what it holds.
Garden stores, under-stair cupboards and side passages absorb a great deal, and their contents rarely vanish just because the space does.
Write down who uses the new space when nobody else is in the house, and whether that changes how it should connect to the front door and the stairs.
A room used by one person late at night makes different demands on circulation and security than one only used when the household is together.
3.Where the extension meets the existing plan
The join between old and new is where most extension regret lives. These prompts are deliberately about the existing rooms rather than the new ones.
Identify which existing external wall would become an internal junction, and write down every window and door in it that would be lost, blocked or changed.
Owners tend to picture the new room and forget that the old wall carries openings, radiators, sockets and a rainwater pipe that all have to go somewhere.
Note which existing rooms would end up with no outside wall at all, and ask how daylight and ventilation would then reach them.
The middle of an extended house is where light disappears, and identifying the affected rooms early gives a designer a problem to solve rather than an afterthought.
How an enclosed room is lit and ventilated is a matter for a qualified professional and the relevant local requirements; raise it as a question rather than assuming an answer.
Walk the route from the front door to where the new space would be and write down how many doors and turns it involves, and whether it passes through a room someone might want to close off.
Circulation that only works when every internal door is open is a common outcome of extending, and it is easiest to notice by walking it.
Record which way each door near the junction swings, and whether that swing would block a radiator, a light switch or the only sensible place for a tall unit.
Door swings are easy to change on paper and awkward to change once joinery and heating positions have been fixed around them.
Note the ceiling height of the existing rooms at the junction and decide whether you would accept a visible change in height where old meets new.
Matching an existing ceiling line is not always possible, and knowing in advance whether you mind saves an argument at the drawing stage.
Ask what happens to the heating in the retained rooms once an external wall becomes an internal one, and where the radiators currently on that wall would move to.
Radiators on the wall that disappears have to be relocated, and their new positions interact with furniture layouts you may already have in mind.
Heat output and pipe routing are for a qualified heating professional to work out; treat this as a topic to raise, not a conclusion to reach from a checklist.
4.Ground conditions, drainage and what is buried outside
What sits under and around the proposed footprint drives more design changes than almost anything else, and a surprising amount of it is visible from the surface.
Photograph every manhole and access cover in the garden, side passage and driveway, and note roughly where each sits relative to the house wall.
Covers mark drainage runs that a designer needs to know about, and photographing them now avoids a search once the ground is disturbed.
Note where rainwater from the existing roof goes once it reaches the ground, and whether you can see a gully, a channel or nothing obvious at all.
Extending changes both the roof area and the amount of hard surface, so the existing arrangement is the starting point for that conversation.
Write down the position and rough spread of any tree, large shrub or thick hedge within the area you are considering, including specimens in neighbouring gardens.
Nearby trees influence both what can be designed and what a professional will want investigated, and neighbouring trees are frequently forgotten.
Trees can carry protection and their effect on ground conditions is for qualified professionals and the local authority to assess; confirm status locally before assuming anything.
Record which way the ground falls across the proposed footprint, using a rough eye-level check from the house wall out to the far end of the area.
A slope the household stopped noticing long ago can change the whole approach to floor level, steps and retaining, and owners rarely mention it unprompted.
Note anything you know about earlier ground work on the plot, such as a filled pond, a demolished outbuilding, a removed tree or a previously dug patio base.
Made ground and old foundations are among the most common causes of a changed approach once digging starts, and local knowledge is genuinely useful.
Ask whether any drain crossing your plot also serves another property, because a shared run brings other parties into the conversation.
Shared runs are common in terraced and semi-detached streets and change who has to be consulted before anything is designed over them.
Ownership and status of a drain run is determined by the relevant authority or drainage undertaker; ask them directly and record what you are told.
5.Consent topics to raise with the local authority
Nothing on this page can tell you what may be built where you live. These prompts help you ask the right questions of the right body and keep the answers you are given.
Confirm locally what consent arrangements apply to your property and your type of proposal before commissioning any drawings, and note who you spoke to.
Requirements vary between areas and between properties, and an informal opinion from a neighbour or a builder is not a substitute for asking the authority.
Only the local authority can tell you what applies to your property; treat every other source, including this checklist, as a prompt to ask them.
Ask whether your property or its area carries any designation that changes what has to be applied for, and record exactly how that was described to you.
Designations change the whole route a proposal takes, and finding out after a design already exists is one of the more painful ways to learn it.
Check whether any earlier consent granted on the property came with conditions that still bind what can be done now, including on previous extensions.
Conditions attached to a past approval survive changes of ownership and can restrict exactly the thing you are planning.
Ask what drawings, forms and supporting information the authority expects to receive, and in what format, before anyone starts producing them.
Knowing the expected package prevents work being produced twice and helps you understand what you are asking a professional to provide.
Agree in writing who is responsible for making any application and for answering questions raised during the process, and how you will be kept informed.
Applications stall most often because nobody was clearly responsible for responding, and this is settled easily at the outset.
Record every answer you receive about consent in one place, noting the name of the person who gave it and the reference of any conversation or case.
Verbal guidance is easily misremembered, and a single written record is what makes the next professional conversation efficient.
7.Services, heating and hot water across an enlarged house
An extension makes the house bigger than the systems inside it were arranged for. These prompts identify what has to be asked rather than assumed.
Note where the boiler or heat source, the hot water cylinder and the consumer unit sit, and whether any of them stand in the area being changed.
Relocating plant is a separate piece of work with its own constraints, and its position often quietly dictates the layout of the new space.
Ask whether the existing heating, hot water and electrical arrangement can serve the enlarged house, and treat the answer as a professional judgement rather than an assumption.
Adding rooms adds demand, and the answer determines whether a separate strand of work has to run alongside the building work.
Capacity of a heating or electrical installation must be assessed by a suitably qualified professional; this checklist can only tell you to ask the question.
Write down whether the new space is intended to contain water, such as a kitchen, a utility area or a cloakroom, because that decides whether drainage has to reach it.
Getting waste away from a new wet area is often the single biggest constraint on where it can go, and it is settled by the brief rather than by taste.
Note the external cables, boxes and brackets fixed to the wall that would be built against, including aerial, broadband, alarm and satellite cabling.
Each of these belongs to a different provider or trade, and unpicking them is a small task that is only irritating when it is discovered late.
Start a rough room-by-room list of where you would want sockets, switches and lighting in the new space, based on how you actually use similar rooms now.
These positions are usually decided under time pressure on site, and an owner who has thought about them beforehand gets a better result.
Ask what happens to any outside tap, external light, extract vent or flue terminal that currently sits on the wall the extension would cover.
Vents and flue terminals in particular cannot simply be built over, and they often need a decision before the footprint is finalised.
Never plan around a flue terminal or combustion vent yourself; that belongs with a suitably qualified heating professional and should be asked about early.
8.Assembling the information a professional will ask for
The first professional conversation goes much further when you arrive with the material below rather than promising to find it afterwards.
Gather any existing drawings of the house, including anything handed over when you bought it and anything produced for earlier alterations.
Even inaccurate old drawings save time, because they show what was intended and where earlier work was recorded.
Collect the survey or condition report you received when purchasing, together with any specialist report obtained since then.
These often record construction type, defects and alterations that you would otherwise be guessing at from memory.
Take a set of photographs of every elevation and of the rooms at the proposed junction, ideally on both a dull and a bright occasion.
Light behaves differently across a house than owners expect, and a paired set makes the daylight conversation concrete rather than theoretical.
Separate your wish list into what is fixed, what is flexible and what you would drop if something had to go, and write the three lists out separately.
Designers work far better against a stated hierarchy than against an undifferentiated list of everything the household has ever wanted.
Write down who in the household makes the final call when two of you disagree, and how that decision gets recorded so it is not revisited weekly.
Unresolved internal disagreement is one of the most common causes of drift and rework once a design is under way.
Note the questions you already know you cannot answer yourself, and keep them as the agenda for the first professional conversation.
Arriving with a written list of unknowns turns an introductory meeting into a working one and makes the advice you receive more targeted.
Preparation
Documents and information to gather
Having these to hand usually makes the first conversation shorter and more useful.
- Title documents and plan showing the recorded boundary of the property
- Any existing drawings of the house, including those produced for earlier alterations
- The survey or condition report obtained when the property was purchased
- Paperwork relating to any previous consent granted on the property and its conditions
- Photographs of every elevation, of the proposed junction and of existing defects
- Notes of any conversation with the local authority, a neighbour or a utility supplier
Records
Decisions to record before work begins
Write these down in your own words, with the date, so everyone is working from the same version.
- Whether the new space replaces an existing room or adds to the accommodation
- Whether the new space must be closable or is permanently open to the rest of the plan
- Whether a visible change of ceiling height between old and new is acceptable
- Whether the new space is intended to contain water, and therefore needs drainage
- Which items on the wish list are fixed, which are flexible and which would be dropped
- Who in the household makes the final decision and how that decision is recorded
Professional review
Questions to discuss with qualified professionals
Bring these to the relevant qualified professional, supplier or authority. Requirements vary by project and location.
- What consent arrangements apply to a proposal of this kind on this particular property?
- What would you need to establish about the ground and the existing foundations before advising?
- How would daylight and ventilation reach the rooms that would lose their outside wall?
- What does the existing rainwater and drainage arrangement mean for a structure in this position?
- Does the work touch or come near a shared structure, and what process would that trigger?
- Can the existing heating, hot water and electrical arrangement serve a larger house?
- What survey or investigation would you want before any design work is committed to?
- Which parts of this proposal carry the most uncertainty at this stage, and why?
Blind spots
Commonly overlooked items
- The contents of the garden store or side passage that the extension quietly removes
- Radiators, sockets and a rainwater pipe on the wall that becomes an internal junction
- An outside tap, extract vent or flue terminal on the elevation being built against
- Neighbouring trees whose spread reaches over the proposed footprint
- The step down to the garden that has been ignored for so long nobody mentions it
- Conditions attached to a consent granted to a previous owner of the property
- Where scaffolding would physically stand and whose land it would stand on
What this checklist does not do
- This checklist does not state whether anything may be built at your property; only the local authority can tell you what applies where you live.
- Nothing here establishes whether an existing wall, floor or foundation can carry a change; that judgement belongs to a suitably qualified professional.
- Observations you make yourself are a starting point for a conversation, not a substitute for a measured survey or a condition report.
- Where a topic touches gas, electricity, drainage or a shared structure, stop at the question and take it to the relevant qualified professional or authority.
More preparation
Related checklists
Inspiration
Related Ideas Library pages
Design directions to explore once the preparation is done.
Go deeper
Related Build Design Hub guides
Explanatory planning guidance behind the decisions on this page.
Additions & Conversions Planning Checklists
Preparation checklists for extensions, conversions and outbuilding projects — what the new space has to do, and the questions that belong with professionals.
Browse all Additions & Conversions checklists →