Checklists · Drainage
Site Drainage Feature Inventory Record Checklist
Help an owner build a plain inventory of the drainage features on their plot, recording what each one is, where that information came from and which ones nobody can account for, so later observations are read against something rather than guessed at.
6 sections · 38 planning prompts · educational owner-side preparation
https://www.builddesignhub.com/checklists/drainage-and-site-discussion/site-drainage-feature-inventory-record · Build Design Hub — educational planning resource. Requirements vary by project and location.
Scope
What this checklist covers
The preparation ground these prompts walk through.
- Walking the plot and listing everything that might be a drainage feature
- Recording what each feature is rather than what it looks like
- Where the information about each feature actually came from
- Features that do not look like drainage at all
- The covers, hollows and pipes nobody on the property can account for
- Turning the inventory into something a drainage professional can use
Audience
Who this checklist is for
- Owners who have just taken on a plot and inherited whatever is under it
- People asked by a designer what drainage the site already has
- Owners about to report a water problem and unsure what they are looking at
- Anyone assembling background before a drainage conversation is arranged
Timing
When to use it
- Listing the drainage features visible on a domestic plot
- Separating what you know about a feature from what you assumed
- Recording which features arrived with paperwork and which did not
- Preparing a starting point for a first drainage conversation
- Noting the features that nobody on the property can explain
Limits
When it is not sufficient
This is general planning preparation. These situations need a qualified professional, and often the relevant authority.
- Deciding what any feature is, how it works or whether it is working
- Opening, lifting, entering or excavating anything to find out
- Replacing a drainage survey or the record a designer would produce
- Concluding what standing water in any feature means
The checklist
Work through the sections
Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.
1.Deciding what goes on the list at all
Most owners list the gratings and stop. The inventory is only useful if the things that do not announce themselves go on it too, so start by deciding generously what counts.
Walk the full boundary and every corner of the plot before writing anything down, including the parts nobody goes to and the strip behind any outbuilding.
Features sit where nothing else happens, which is precisely why they are forgotten by everyone who has lived with them.
Put anything on the list that might be drainage, including hollows, channels, gravel strips, pipe ends, covers and low planted areas you cannot explain.
Removing something from the list later is easy; noticing it for the first time long afterwards is not.
Give each entry a number and mark that number on a rough plan of the plot, so a description and a position never become separated from each other.
Lists without positions and plans without descriptions are each roughly half as useful as the two kept together.
Photograph each numbered feature from far enough back to show where it sits, and note what you can see from where you stood.
A close photograph of a lid tells nobody where the lid is, and locating it again is most of the work.
Photograph from ground level only. Lifting covers, entering chambers or clearing material is work for a qualified drainage professional.
Follow each downpipe to where it disappears and record what it appears to enter, without concluding anything about where the water goes afterwards.
Where rainwater enters the ground is one of the most useful entries on the list and one of the least often written down.
Record the places you could not get to, such as behind a locked gate or under dense planting, rather than leaving a silent gap in the list.
A named gap prompts a question later; an unnamed one is simply read as an absence of features.
Walk the plot again at a different time of year, since a channel hidden by long grass and a cover buried under leaves appear in different seasons.
Features reveal themselves as the garden changes around them, so a single walk produces a single season's list.
2.Recording what each one is, not what it looks like
The same hollow, the same gravel trench and the same cover appear on plots where they are doing entirely different jobs. The inventory is worth something only when the name is separated from the appearance.
Keep two columns for every feature: one for what it looks like, and one for what somebody has actually told you it is.
Merging them produces an inventory in which every guess reads exactly like a fact, which is worse than no inventory.
Write down who told you what a feature is and when, whether that was a previous owner, a neighbour, a contractor or a document.
The source is what a professional weighs, and an unattributed name on a list carries no weight at all.
Write unknown where nobody knows, and resist filling the gap with the most likely word, since a plausible name is treated as a known one.
An honest unknown gets investigated; a confident wrong name sends everybody looking in the wrong part of the plot.
Ask whoever designed or built a feature whether it has a designed outflow connection, and record the answer in their words rather than your summary.
Whether water is intended to leave a feature by pipe or into the ground changes how everything you later observe should be read.
What any feature is and how it works is established by a qualified drainage professional from the records and the site, not from what can be seen at the surface.
Ask whether any feature is lined, and note that you asked even where the answer was that nobody knows.
A record of the question having been asked is itself useful, because it stops the same gap being rediscovered by each new adviser.
Write the feature's proper name from the paperwork where one exists, rather than the household shorthand everyone has used for years.
Words like soakaway and drain are used on most plots for several different things, and a professional will not know which you mean.
3.Where the information about each feature came from
Some features arrived with drawings, some with a conversation, and some with nothing at all. Sorting them by how well they are evidenced is quick and changes what happens next.
Look through the papers that came with the property for drainage drawings, searches, guarantees or completion documents, and note which features each one mentions.
Documents that exist and were never read are the commonest source of an answer nobody thought was available.
Write down anything a previous owner, a neighbour or a long-standing contractor has said about a feature, dated and attributed to them.
Recollection is not a record, but an attributed recollection is a lead a professional can follow or set aside deliberately.
Note whether whoever installed each feature can still be contacted, since questions become far harder to answer once that person has gone.
Access to the person who dug it is a resource with an expiry date, and most owners discover this after it has passed.
Mark each feature as documented, described by somebody, or unevidenced, and keep those three categories visibly apart on the list.
The unevidenced column is the working list for everything that follows, and it disappears the moment the three are merged.
Record any landscaping, paving, extension or repair carried out since the feature was installed, and whether anybody checked how it affected the feature.
Later work routinely changes what arrives at a feature without anything that anyone would call drainage being touched.
Keep copies of any drawings alongside the inventory rather than filed separately, and note on the list which drawing covers which numbered feature.
Drawings filed apart from the list are reliably lost at the point the list finally gets used.
4.The features that do not look like drainage
Several arrangements are deliberately made to look like garden. Those are the ones most likely to be altered by ordinary good intentions, so they belong on the inventory before anything else.
List any shallow planted hollow, dished lawn area or low border that water appears to reach, and ask whether it was designed to take water.
A feature doing a drainage job while looking like a border is maintained like a border, which is how it stops working.
Record any long shallow grassed channel running across the plot, including one that reads simply as a dip in the lawn.
A route water is meant to travel along is invisible in dry weather and is routinely levelled by the next person who improves the lawn.
Note paved or gravelled areas that appear to let water through rather than shed it, and ask whether they were built that way deliberately.
A surface built to take water into itself is treated very differently from one built to throw water off.
Record any kerb, upstand or raised edge whose purpose nobody can explain, and photograph it before anybody decides it is untidy.
Edges frequently define where water is allowed to go, and they are removed during landscaping without a second thought.
Note where the lawn is a different colour, texture or firmness in a regular shape, and mark that shape on the plan.
Regular shapes in grass usually follow something buried, which is a lead worth handing over rather than digging into.
Do not open ground to find out what a pattern follows. Buried services and structures are established by qualified professionals before anything is dug.
Mark on the inventory which features you would want anyone cutting, clearing or tidying the garden to be told about.
Most damage to these features is done competently and in good faith by somebody who was never told what they were looking at.
5.The covers, pipes and hollows nobody can account for
The unaccounted entries are the most valuable part of the record, provided they are collected together rather than scattered through the list as individually reasonable mysteries.
Pull every unexplained feature onto a single short list, with its number, its position and a photograph, and keep that list at the front.
Professionals ask for this list first, and it takes one walk to produce rather than a site visit to compile.
Record any visible pipe end, outfall or opening at a ditch, bank or boundary, and note whether anything was coming out of it when you looked.
A pipe end nobody can account for connects to something, and finding out what is a question rather than an excavation.
Where a pipe discharges beyond your boundary, responsibility is a matter for the relevant authority and the parties involved rather than something to settle yourself.
Note covers that differ from each other in material, size or age, and record those differences rather than treating all covers as one category.
Differences between covers frequently mark different systems installed at different times by different people.
List anything you have been told is disused or abandoned, attribute the statement, and keep it on the inventory rather than removing it.
Features believed abandoned turn out to be live often enough that deleting them from a record is a decision, not a tidy-up.
Record any feature that has recently started behaving differently, including one that now holds water when it previously did not.
Change over time is more informative than any single observation and is the part memory loses first.
Keep the unknowns as questions for a qualified professional rather than resolving them by lifting, rodding, digging or tracing anything yourself.
Nearly every way an owner might satisfy their curiosity here carries a risk that the answer is not worth.
Lifting covers exposes open drainage and gases, and excavation risks buried services. Both are work for qualified professionals with the right equipment.
Ask whether any feature appears to serve more than one property, and note anything a neighbour has said about drainage crossing between your plots.
A shared arrangement carries duties and constraints belonging to more than one household, and neither household usually knows it does.
Whether drainage is shared, and what that means for responsibility, is confirmed with the drainage undertaker and the local authority rather than assumed from appearance.
6.Turning the inventory into something usable
The inventory is preparation, not a finding. What makes it work is that it can be read by somebody who has never been to the plot and that it keeps running after the first conversation.
Bring the plan, the numbered list and the photographs into one document rather than three, so nothing arrives at a conversation on its own.
Split records get partially forwarded, and the half that goes missing is usually the plan.
Label plainly which entries are assumption and which are evidenced, and put that note at the top rather than in the small print.
Anyone reading the list will otherwise treat the whole of it as equally reliable, which is the failure this record exists to avoid.
Ask a qualified drainage professional what is missing from the inventory before the site is discussed in any detail, and record what they say.
One early answer about what to collect saves a wet season spent recording the wrong thing.
Keep the inventory somewhere it stays with the property rather than with you, and tell whoever else lives there where it is.
The record's value is entirely in being found by the next person, and that is a filing decision rather than a drainage one.
Add to the inventory whenever anything is built, paved, planted or dug, noting what was done and who did it.
The gap between what was recorded and what exists opens one small job at a time and is never closed retrospectively.
Keep observations about how water behaves in a separate record from this inventory, and cross-reference them by feature number.
What a feature is and what it appears to be doing answer different questions, and merging them makes both harder to read.
Preparation
Documents and information to gather
Having these to hand usually makes the first conversation shorter and more useful.
- Any drainage drawings, searches or site plans that came with the property
- Guarantees, handover packs or completion documents for past outdoor work
- Invoices or quotations describing drainage work carried out on the plot
- A rough plan of the plot with boundaries, buildings and paved areas marked
- Dated photographs of each numbered feature taken from ground level
- Notes of what previous owners, neighbours or contractors have said, attributed
Records
Decisions to record before work begins
Write these down in your own words, with the date, so everyone is working from the same version.
- Which features you treat as evidenced and which as hearsay
- Which unexplained features you are asking a qualified professional about first
- Which features stay undisturbed until somebody qualified has looked at them
- Who else in the household is told where the inventory is kept
- What you will add to the record after any future outdoor work
Professional review
Questions to discuss with qualified professionals
Bring these to the relevant qualified professional, supplier or authority. Requirements vary by project and location.
- Which of the features I have listed can you identify from what I have recorded?
- What would you need to establish what the unexplained ones are?
- Which of these features has a designed outflow, and which does not?
- Which of them, if any, should be treated as drainage rather than as garden?
- What records should exist for a site like this, and who would hold them?
- What must be confirmed with the local authority or drainage undertaker before anything changes?
- Which parts of this plot should stay undisturbed until more is known?
- What else would you want added to this inventory to make it useful to you?
Blind spots
Commonly overlooked items
- A shallow planted hollow listed as a border because that is what it looks like
- The strip behind an outbuilding, never walked and never included in the list
- Where each downpipe actually disappears, assumed rather than followed
- Covers differing in age and material, recorded as though they were one system
- The name of the person who said what a feature is, lost within a fortnight
- Drawings that came with the property and were filed without ever being read
- Features described as abandoned and quietly deleted from the record
What this checklist does not do
- Nothing here identifies a drainage feature or establishes what it does; that is a determination for a qualified drainage professional working from the records and the site.
- Covers are photographed in place and never lifted, since open drainage and gases make that work for qualified professionals with the right equipment.
- No ground is opened to find out what a pattern, channel or pipe follows; buried services and structures are established by qualified professionals first.
- Drainage responsibilities, consents and what applies at a boundary are confirmed with the local authority and the drainage undertaker, since these vary by location.
More preparation
Related checklists
Inspiration
Related Ideas Library pages
Design directions to explore once the preparation is done.
Go deeper
Related Build Design Hub guides
Explanatory planning guidance behind the decisions on this page.
Drainage & Site Discussion Checklists
Observation and record-keeping checklists for water on site — what to watch, what to photograph, and the questions that belong with a drainage professional.
Browse all Drainage & Site checklists →