Surface Water Destination Enquiry Preparation Checklist

Help an owner establish the discharge point before commissioning a drainage scheme, by identifying which bodies answer for which destinations, approaching them in a sensible order and recording what each one says.

Project stage:Early planningBrief and scopeChoosing professionals

7 sections · 40 planning prompts · educational owner-side preparation

Prints in your browser only. Nothing is saved, sent or tracked.

The checklist

Work through the sections

Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.

More preparation

Related checklists

Surface Water ObservationAn observation checklist for owners recording where surface water gathers on a plot, how it travels and how long it lingers, before any drainage conversation begins.Drainage Record KeepingA planning checklist for owners setting up a drainage record that lasts, covering what to capture each time, how to file photographs and what to hand on to somebody else.Drainage Survey PreparationGetting ready for a drainage survey visit: the symptom history, the covers and outlets you can see, access arrangements, and what you should be holding afterwards.Neighbour Water ConversationA preparation checklist for owners raising water with a neighbour, covering what to observe first, how to describe it without attributing cause, and what to write down afterwards.Below-Ground Water QuestionsSeepage, ground that will not dry, cellar damp and water showing in low openings, dated by the owner without any guess at where it comes from.Downpipe Discharge QuestionsTrace where roof water is sent, record what is visible at gutters and downpipes from safe ground, and keep what you observe separate from what a professional decides.Drainage Connection QuestionsA question-building checklist for owners wondering what a proposed drainage connection would involve, keeping every answer with a professional and the responsible authority.Site Reinstatement at CompletionReinstatement is where the pre-works condition record finally earns its keep. This is about agreeing in advance what the outside looks like when everyone leaves.

Inspiration

Related Ideas Library pages

Design directions to explore once the preparation is done.

Go deeper

Related Build Design Hub guides

Explanatory planning guidance behind the decisions on this page.

Drainage & Site Discussion Checklists

Observation and record-keeping checklists for water on site — what to watch, what to photograph, and the questions that belong with a drainage professional.

Browse all Drainage & Site checklists →