Checklists · Kitchen
Kitchen Snagging Preparation Checklist
Helps an owner build a considered kitchen snagging list by naming what is easy to miss once the room fills up, and by settling in advance how items are reported, tracked and agreed as attended to.
8 sections · 44 planning prompts · educational owner-side preparation
https://www.builddesignhub.com/checklists/kitchen-planning/kitchen-snagging-preparation · Build Design Hub — educational planning resource. Requirements vary by project and location.
Scope
What this checklist covers
The preparation ground these prompts walk through.
- Setting up a snagging list while the trades are still on site
- Cabinet doors, drawers, handles and the parts that move
- Worktop joints, edges, upstands and cut outs around fittings
- The sink, the tap and the cupboard underneath them
- Appliances, sealant lines and the junctions with the existing room
- Reporting items, attaching them to somebody and tracking what remains
Audience
Who this checklist is for
- Owners about to receive a newly fitted kitchen from a supplier or installer
- Anyone who has never compiled a snagging list and is unsure what to look at
- Households moving back into a kitchen that has been refitted around them
- Owners coordinating several trades where nobody clearly owns the finishing details
Timing
When to use it
- Preparing a considered list of items to raise before a kitchen is treated as finished
- Recording what you can observe in the room rather than guessing why it happened
- Organising snagging notes so that nothing is raised twice or quietly forgotten
- Preparing questions for the supplier, the installer and each separate trade involved
- Agreeing in writing how outstanding items will be tracked and revisited
Limits
When it is not sufficient
This is general planning preparation. These situations need a qualified professional, and often the relevant authority.
- Deciding whether an item is a defect or within normal tolerance, which is for the supplier and installer to establish
- Judging whether electrical, gas, water or ventilation work has been carried out correctly, which only qualified trades can assess
- Serving as a completion record, an inspection record or a certification of any kind
- Determining what local requirements apply to the work carried out, which must be confirmed with your local authority
- Establishing your position under any contract or warranty, which is a matter for appropriately qualified advice
The checklist
Work through the sections
Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.
1.Setting up the list while people are still on site
A snagging list is far more useful when it is started before the last trade leaves. Agree how it will be handled rather than compiling it alone once everyone has gone.
Ask, before fitting starts, how snagging items are meant to be raised and who they should be sent to, and write the answer down.
A kitchen often involves a supplier, an installer and separate trades, and the route for reporting an item is rarely obvious once they have left.
Ask the supplier and the installer which of them handles which kinds of item, and record what each of them tells you.
Walk the room in daylight and then again with the lights on, since the two conditions reveal completely different things.
Raking daylight shows alignment and level, while artificial light shows surface marks and shadow gaps. Most lists are compiled in only one of them.
Clear the worktops before you look, since anything left standing on them sits over the joints and edges most likely to need attention.
A list compiled around a kettle and a fruit bowl reliably misses whatever those objects were covering.
Write items as observations rather than conclusions, describing what you can see rather than what you believe caused it.
An observation is easy to discuss, whereas a stated cause tends to stall a conversation that would otherwise be straightforward.
Whether an item is within normal tolerance is for the supplier or installer to establish rather than for you to determine.
Ask whether anything in the kitchen is deliberately unfinished, awaiting a part or already known about and being returned to.
Some items are known and in hand, and separating those from fresh observations keeps the rest of the list credible.
2.Cabinet doors, drawers and the parts that move
Moving parts are where a fitted kitchen shows its finishing, and they are also the parts most often left roughly set as the fitting draws to a close.
Open and close every door and every drawer in turn, including the ones you have no reason to use, and note any that catch, hang or drop.
The awkward drawer is very often the one nobody opened during fitting, such as the one behind a bin or in a corner.
Look along a run of fronts from one end and note where the gaps between them are visibly uneven or where one sits proud of its neighbour.
Alignment reads far more clearly along the run than face on, which is how uneven gaps survive a straight ahead look.
Note any door or drawer that does not stay where you leave it, or that shuts with a knock rather than settling quietly.
Closing mechanisms are usually adjustable, so it is worth recording which ones behave differently from the rest of the room.
Check that handles sit the same way up and in the same position on similar doors, and note any that differ from their neighbours.
Handle alignment is easy to miss while standing close to one door and obvious to everyone standing in the room afterwards.
Open a corner unit fully and note whether its door or mechanism collides with anything, including an adjacent handle or appliance.
Corners are the most common place for a clash, and the clash usually only appears when both doors are opened at the same time.
Where a clash cannot be adjusted out, ask the supplier and installer what options exist rather than forcing anything.
Look inside the cabinets as well as at their fronts, noting exposed cut edges, unfinished panels or shelves that do not sit level.
Interiors are looked at far less often at handover and become much harder to get attended to once the kitchen is loaded.
3.Worktop joints, edges, upstands and cut outs
The worktop carries the most visible joinery in the room. Its junctions are where careful work shows and where hurried work shows just as clearly.
Run a hand along every worktop joint and note anywhere you can feel a lip, a step or a change of level between the two pieces.
A joint that feels different usually looks different in raking light as well, and recording both observations together is more useful than either alone.
Look at how the worktop meets the wall along its whole length, noting any gap that opens up towards one end of the run.
Walls are rarely straight, and how the scribe follows them is one of the clearest indications of the care taken in the fit.
Note the finish of the cut outs around the sink, hob and tap, including the edges you can only see by looking from underneath.
Unseen cut edges are frequently left rough, and how much that matters depends entirely on the material involved.
Ask the supplier how cut edges should be finished in your particular worktop material and what that finishing involves.
Look along the front edge and at every external corner for chips, dulled patches or anywhere the edge profile changes.
Corners take the most handling during fitting and are usually the first place any damage appears.
Note any part of the worktop that overhangs without visible support beneath it, and ask what is carrying that overhang.
Overhangs become a source of worry later, and asking now records the answer while the person who fitted it is still available.
How much support an overhang needs is for the supplier and installer to establish for that material and that span.
Check the upstands or splashbacks for even gaps top and bottom, and note anywhere the line drifts away from the worktop below it.
The upstand line draws the eye across the whole run, so a drifting gap reads more strongly than most people expect.
4.The sink, the tap and the cupboard underneath
The cupboard under the sink is one of the least examined parts of a new kitchen and a place where problems tend to announce themselves early.
Fill the sink and let it drain fully while you watch, then look underneath with a torch for anything damp, marked or dripping.
A slow drip shows itself while you are standing there watching and might otherwise go unnoticed until it has done damage.
If you find any sign of water where it should not be, report it to the installer or a qualified plumber rather than investigating further.
Move the tap through its full range, including any spray or pull out head, and note anything it fouls such as a window, an upstand or the sink itself.
Taps set under windows or against upstands are a frequent clash, and it only appears when the handle is taken right to its limit.
Note whether the isolation valves under the sink can be reached, and ask to be shown which valve serves which fitting.
Being shown once while somebody is standing there is worth far more than working it out later with water already running.
Ask the installer or a qualified plumber to point out the isolation arrangements rather than operating anything you are unsure about.
Look at how the sink meets the worktop all the way round, including the back edge, and note any gap or unevenness in that junction.
The back edge is the hardest part to see and the most likely to have been finished quickly at the end of the fit.
Note whether the waste, the trap and any appliance hoses leave usable storage space, and whether anything is resting on a pipe or a hose.
The cupboard under the sink is storage as well as plumbing, and an arrangement that leaves no room is worth raising while it can still be altered.
5.Appliances as they were actually left
Appliance work is often split between the supplier, the fitter and a separate trade. What matters here is what you can observe and what you were shown.
Open each appliance door alongside the doors and drawers next to it, and note anything that collides or that cannot be opened at the same time.
Appliance door clashes are among the most common snagging items and are usually obvious as soon as somebody looks for them.
Note whether integrated appliance fronts line up with the cabinet doors either side of them, along the top and along the bottom.
Integrated fronts are usually adjustable and are often left wherever they happened to sit when the appliance went in.
Check that you have been shown how each appliance operates and that you hold its manual, model information and any registration details.
Appliance paperwork tends to leave with the packaging, and it is the thing owners most often wish they had held onto.
Appliance registration is typically made directly with each manufacturer, so ask the supplier whether anything has been registered on your behalf.
Ask to be shown how each built in appliance would be withdrawn if it ever needed attention, and note what you are told.
Some appliances are awkward to withdraw once a worktop, plinth or floor finish is in place, and this is the moment to find that out.
Ask the installer and the manufacturer how servicing access should be maintained rather than assuming an appliance can simply be pulled out.
Note whether the extraction over the cooking area was demonstrated to you, and write down in your own words what you were told about it.
Extraction arrangements vary a great deal, and a plain record of what you were shown is more useful later than a vague memory.
Whether extraction is arranged appropriately for your property is for a qualified professional to advise on and to confirm locally.
Look at how freestanding appliances sit against the floor and the plinth, noting anything that stands proud, sits low or rocks when pushed.
An appliance that is not sitting level affects how its door hangs and how it runs, and it is straightforward to raise at this point.
6.Sealant, plinths and where the kitchen meets the room
The junctions between new cabinetry and an older building are where the finishing either resolves neatly or is left for somebody else to notice.
Look along every sealant line and note where it changes width, breaks, or has been finished untidily at a stop or an internal corner.
Sealant is usually the last job of all, yet it sits at eye level along the entire length of the run.
Note where the plinth meets the floor and whether the gap beneath it stays consistent along the length of the kitchen.
Floors rise and fall, and how the plinth was scribed to follow them is a fair indication of the care taken elsewhere.
Check the end panels where a run stops against a wall, a doorway or open floor, and note any raw edge or visible fixing.
End panels are where fitted cabinetry meets the rest of the room, and an unfinished end is noticed by everyone who walks past it.
Look at how the new work meets existing skirting, architrave, tiling or flooring, and note anywhere the two simply do not resolve.
The join with what was already there is frequently nobody's stated responsibility, which is exactly why it belongs on the list explicitly.
Where several trades meet at one junction, ask each of them who is responsible for finishing it and record the answers you are given.
Note any filling, making good or decoration that has been left, including above the wall units and behind where appliances now stand.
Making good above and behind gets skipped because it is out of sight, and it becomes far harder once the kitchen is in daily use.
7.Lighting, sockets and switches seen with fresh eyes
You can record what you observe about the electrical items in the room. What any of it means is for a qualified electrician to establish.
Switch on each lighting circuit in turn and note anything that does not come on, flickers, or looks noticeably different in colour from its neighbours.
Mismatched lamps within a single run are common and are easiest to attend to while somebody still holds the remaining stock.
Report anything unexpected about lighting or power to a qualified electrician rather than investigating it yourself.
Note where the under cabinet lighting actually falls on the worktop, and whether anything fitted since is now casting a shadow across it.
Task lighting is often positioned before the final arrangement is known, and the shadow only becomes visible once you stand where you work.
Check that every socket in the room can still be reached and is not blocked by an appliance, a bin or something now standing in front of it.
A socket behind a fixed appliance is effectively lost, and this is the last comfortable point at which that can be discussed.
Note whether switch plates and socket plates sit flat and square against the wall or the splashback behind them.
Plates that stand off the wall or sit slightly skewed are usually straightforward to attend to and stand out permanently if left.
Avoid removing or opening any electrical accessory yourself; describe what you can see and put it to a qualified electrician.
Ask to be shown where the kitchen circuits are controlled, and what documentation you should expect for the electrical work carried out.
Knowing which control governs the kitchen matters at precisely the moment when nobody has time to work it out.
Ask a qualified electrician what documentation applies to the work done here, and confirm locally what you should expect to receive.
8.Reporting items, attaching owners and tracking what is left
A list only does its job when each item has somebody attached to it and both sides share a record of what has been attended to.
Photograph each item you raise twice, once close up and once from far enough back to show where in the room it sits.
A close photograph of a mark is useless without context, and the wider one is usually the photograph that settles the discussion.
Number the items and keep that numbering fixed, adding anything new to the end of the list rather than renumbering what is already there.
Renumbering breaks every earlier reference and is a common reason two people end up discussing different items entirely.
Send the list in writing to whoever you agreed it should go to, and keep your own copy of exactly what was sent and when.
A written record of what was raised, and to whom, is one of the more useful things to hold if the conversation carries on.
Where the supplier and the installer are separate parties, send each of them the items that belong to them rather than assuming it is passed on.
Agree how you will be told that an item has been attended to, and say plainly that you intend to look at each one yourself afterwards.
Items are sometimes recorded as done at a distance, and a shared understanding at the start avoids that becoming a dispute later.
Keep the items you are still living with separate from those already attended to, rather than deleting anything from the list.
The history of what was raised and what was done about it is worth more than a tidy list, particularly if something recurs.
Note anything you have decided to accept as it stands, and record that you accepted it, so that it is not raised again by accident.
Choosing not to pursue something is a legitimate outcome, and writing it down stops it resurfacing later as a grievance.
Preparation
Documents and information to gather
Having these to hand usually makes the first conversation shorter and more useful.
- The order confirmation or specification setting out what was to be supplied and fitted
- Any drawing or plan issued before fitting, so it can be compared with what is in the room
- Manuals, model information and registration paperwork for every appliance in the kitchen
- Care and cleaning information for the worktop, the cabinet fronts and the floor finish
- Photographs taken during fitting, including anything now concealed behind cabinetry
- Contact details for the supplier, the installer and each separate trade involved
- Any documentation you were told to expect for electrical, water, gas or ventilation work
Records
Decisions to record before work begins
Write these down in your own words, with the date, so everyone is working from the same version.
- Who each kind of snagging item should be reported to, and in what form
- Which items you consider outstanding and which you have decided to accept as they are
- How you will be told an item is done, and how you intend to look at it yourself
- Whether any part of the kitchen is deliberately unfinished and already known about
- Which junctions with existing floors, walls and joinery belong to which trade
- Where the appliance paperwork, care information and any spares are being kept
Professional review
Questions to discuss with qualified professionals
Bring these to the relevant qualified professional, supplier or authority. Requirements vary by project and location.
- Which items on this list belong to you, and which belong to somebody else on the job?
- Is anything I have noted here expected behaviour for these materials rather than something to attend to?
- How would you prefer snagging items to be raised, and who should they be sent to?
- What would you rather I avoided doing myself while these items are still outstanding?
- How is each built in appliance withdrawn if it ever needs attention behind or beneath it?
- What documentation should I expect for the electrical, water, gas or ventilation work here?
- Which parts of this kitchen tend to settle or need adjusting once it has been used properly?
- What do owners most commonly come back to you about after living with a kitchen like this?
- What should I confirm locally about the work that has been carried out in this room?
Blind spots
Commonly overlooked items
- The inside of cabinets, looked at far less than the fronts and much harder to reach later
- The back edge where the sink meets the worktop, finished last and seen least of all
- Making good above the wall units and behind where appliances now stand permanently
- Appliance and cabinet doors that cannot comfortably be opened at the same time
- Cut edges under a sink or hob cut out, visible only by looking from underneath
- Which isolation valve serves what, which nobody asks about until water is running
- Recording that an item was deliberately accepted, so it is not raised again by mistake
What this checklist does not do
- This is an owner record of what you can observe. It is not an inspection, a completion record or a certification of any kind.
- Nothing here establishes whether an item is a defect or within normal tolerance; that remains for the supplier and installer to determine.
- Electrical, gas, water and ventilation work can only be assessed by appropriately qualified trades, and nothing you notice replaces that assessment.
- What documentation and local requirements apply to the work carried out must be confirmed with your local authority and the trades involved.
More preparation
Related checklists
Inspiration
Related Ideas Library pages
Design directions to explore once the preparation is done.
Go deeper
Related Build Design Hub guides
Explanatory planning guidance behind the decisions on this page.
Kitchen Planning Checklists
Kitchen preparation checklists — layout decisions to weigh, storage and appliance questions to discuss, and the information to gather before meeting a designer or contractor.
Browse all Kitchen Planning checklists →