Checklists · Sports courts
Court Access and Entry Planning Checklist
Help an owner or club representative describe the route from arrival to the playing surface, record who turns up and what they carry, and turn opening position, entry arrangements and machinery access into questions for qualified professionals.
7 sections · 42 planning prompts · educational owner-side preparation
https://www.builddesignhub.com/checklists/sports-court-facility-planning/court-access-and-entry-planning · Build Design Hub — educational planning resource. Requirements vary by project and location.
Scope
What this checklist covers
The preparation ground these prompts walk through.
- Tracing the approach from arrival point to the playing surface
- Recording who arrives, when, and what they are carrying
- Where an opening sits in relation to live play
- Keys, entry arrangements and who is expected to hold one
- Getting maintenance machinery and deliveries onto the site
- What gets carried onto the surface on shoes and wheels
Audience
Who this checklist is for
- Owners planning a court reached through a garden or a shared drive
- Club representatives reviewing how members reach the courts
- Groups whose site is used by juniors, coaches and visiting teams
- Anyone preparing access questions before a contractor or designer is briefed
Timing
When to use it
- Describing the route people take from arrival to the playing surface
- Recording who reaches the site and what they bring with them
- Listing the openings a court would need and what each is for
- Preparing machinery and delivery access questions for contractors
- Setting out entry arrangements to discuss with a qualified professional
Limits
When it is not sufficient
This is general planning preparation. These situations need a qualified professional, and often the relevant authority.
- Deciding how wide a route or an opening should be for any user or machine
- Determining whether an approach suits people with limited mobility
- Establishing what routes must be kept available for emergency vehicles
- Specifying gates, locks, hinges or automation for any site
- Settling whether consent is needed for a new opening onto a road or footpath
The checklist
Work through the sections
Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.
1.Walking the route from arrival to the playing surface
The approach is usually described from memory and turns out to contain more obstacles than anyone expected. Walking it with a notebook is the whole exercise.
Walk the route people take from where they arrive to the edge of the playing surface, and write down every gate, step, kerb, corner and change of surface along it.
Writing the route down in order is what turns a vague sense of the approach into something a designer or contractor can respond to.
Note what the route is made of along its length, and where it becomes grass, gravel, bare soil or an uneven surface in wet weather.
The condition of the approach when it is wet decides whether people arrive with clean shoes, and it only shows itself if you look during rain.
Mark the narrowest points and the tightest corners along the route, without trying to judge whether they would be adequate.
What width a route needs for the people and machines that use it is for a qualified professional to establish, not something to settle by eye.
Walk the same route after dark and note where you cannot make out the ground, the edges, a step or the gate itself.
Most court sites are reached in the dark for part of the season, and the approach is regularly forgotten when lighting is discussed.
How an approach is lit is a question for a qualified lighting professional, and light reaching neighbours is confirmed locally with the local authority.
Record whether the route passes through a private garden, past windows or across ground that is used for something else entirely.
A route crossing private or working ground raises questions about who may use it and when, long before any gate is chosen.
Note who else uses the same route, such as household members, groundstaff, deliveries or people heading for a different part of the site.
Shared routes are where conflicts appear, and listing the users is what makes those conflicts visible while a plan can still change.
2.Who arrives, and what arrives with them
An entrance is designed around the person having the most difficulty with it. Listing everyone who turns up is how you find that person.
List everyone who would reach the court, such as household members, club members, coaches, junior players with parents, visiting teams and groundstaff.
Different arrivals want different things from an entrance, and the list is the simplest way to show a designer who it is really for.
Note what people carry, such as bags, ball baskets, nets, a wheeled hopper, a buggy or equipment brought in for a single session.
What is being carried decides whether an opening can have a step, a stiff latch or a closer on it, and it is rarely mentioned unprompted.
Write down whether anyone who uses the site has told you they find the approach difficult, and record exactly what they said rather than your interpretation.
What people have actually said is far more useful than a general assumption, and it gives a professional something specific to work with.
Whether an approach suits people with limited mobility is established by a qualified professional and by what applies locally, never by an owner assessment.
Record when people arrive, such as evenings after school, Saturday mornings or during coaching sessions, and whether they come together or in ones and twos.
Everyone arriving at once creates a queue at the opening that never appears when two people turn up, and the pattern is easy to observe.
Note where people wait when the court is still in use, and whether they end up standing on the route itself while they do it.
Waiting happens somewhere whether or not it was planned for, and on most sites it happens squarely in the doorway.
Consider how people leave, particularly when it rains or when a session ends and several groups move at once.
Leaving is quicker and less careful than arriving, and it is when gates get propped open and latches get broken.
3.Where an opening sits in relation to live play
The position of an opening is a question for a specialist and the governing body, but the consequences of getting it wrong are ones an owner can describe.
Note whether anyone entering would have to cross a playing area that is in use in order to reach another one.
Walking across or behind play is a constant interruption on shared sites, and it is decided entirely by where the openings sit.
Ask a specialist court contractor and the relevant governing body where an opening may sit in relation to the lines and the clear space around them.
An opening cannot be sited from a sketch; the relevant governing body and a specialist contractor establish what is possible for your sport and standard.
Record which way you would want an opening to swing, and note what it would swing over or into on each side of the line.
Swing direction is governed by the ground, the wind and what stands nearby, and stating a preference early avoids a gate that fouls a post or a slope.
Consider whether an opening should close behind people on its own, and note what that would mean for somebody carrying equipment in both hands.
An opening that closes itself solves one problem and creates another, and the trade is better made knowingly than by default.
Note that a latch or a closer makes a noise every time it is used, and record how close the nearest window or garden is to it.
Gate noise is among the most common complaints on a court site and has nothing at all to do with how the game is played.
Decide whether more than one opening would be wanted, and write down what each of them would be for.
A second opening is usually asked for after the fence is up, which is when adding one is at its most disruptive.
4.Keys, entry and who is expected to have one
Entry arrangements drift quietly over time. Writing down how the current one actually works is usually enough to show what needs deciding.
Write down who currently holds a key or another means of entry, and whether anybody knows how many are out there in total.
Key holding drifts on shared sites, and simply listing who has one tends to produce a surprise on its own.
Decide what happens when a key is lost or a member leaves, and record who would be responsible for sorting it out.
The arrangement for a lost key is what decides whether an entry system stays meaningful, and it is far easier to agree before anything is fitted.
Note who is expected to let visiting players, coaches or contractors in, and whether that person is reliably on site when needed.
An arrangement depending on one person being available quietly becomes a problem the first time they are away.
Ask a specialist contractor what entry options exist for a site like this, and note that anything powered is a separate question again.
Any powered gate or electrical entry arrangement belongs with suitably qualified people from the outset; confirm locally what applies before planning one.
Record whether the court is expected to be used when nobody responsible is present, and what you would want to be true at those times.
Nothing here establishes that an entry arrangement will keep people out; site security belongs with a qualified professional.
Note how people find out whether a court is free, and whether anyone regularly arrives to find it already occupied.
Access and booking are the same problem seen from two sides, and the entrance is where the disagreement actually takes place.
5.Getting machinery, materials and deliveries onto the site
A court is built, maintained and eventually resurfaced by equipment that has to reach it. That route is easiest to protect while it is still on a drawing.
List the machinery that already reaches the court, such as a mower, a brush, a blower or a trailer, and note how each of them gets there.
Maintenance kit reaches a court somehow, and the route it takes is usually through an opening nobody chose with it in mind.
Ask a specialist contractor what has to reach the surface when a court is built and again when it is resurfaced, and how it would get there.
Court construction and resurfacing bring heavier plant than day-to-day maintenance, and access for it is settled long before it is needed.
What plant a court surface needs, and what access it requires, is established by the specialist contractor and never assumed by the owner.
Note where materials could be unloaded and set down, and whether that ground is currently used for anything else.
Somewhere on the site becomes a loading area whether or not one was planned, and it is almost always a lawn.
Ask whether anything would have to cross the finished playing surface to reach the rest of the site, and what would protect the surface if it did.
How a finished court surface is protected from machinery is for the specialist contractor to determine; damage there is rarely a simple repair.
Record where a vehicle could turn or reverse near the site, and note anything it would have to avoid such as a soft verge, a bank or a manhole.
Turning space is a real constraint an owner can describe from experience, and it changes what can sensibly be brought in.
Note anything overhead along the approach, such as branches, cables or a low structure, and anything underfoot that would not take a load.
Overhead cables and buried services are traced by suitably qualified people before machinery is planned to pass beneath or over them.
6.What gets carried onto the playing surface
Everything underfoot at the threshold ends up on the court. These few paces deserve more attention than they usually get.
Look at the last few paces before the surface and note what people are standing on immediately before they step onto it.
Whatever is underfoot at the threshold travels onto the court, which makes this the single most useful observation for keeping a surface clean.
Record whether grass, clippings, gravel, soil or leaves sit next to the entrance and are carried in on shoes and wheels.
Loose material beside an opening migrates onto the surface constantly, and it affects both cleaning and how the surface plays.
Consider whether somewhere to clean or change footwear is wanted, and note where people would actually stop long enough to use it.
A cleaning point away from where people naturally pause simply gets ignored, so position matters more than the fitting itself.
Walk the approach after heavy rain and mark where water stands, where it runs across the route and where the ground turns soft.
Standing water on the approach is both a nuisance and a clue about how the site drains, and it only reveals itself in the wet.
How water on the approach is managed is a question for a qualified drainage professional, since changes there can affect neighbouring ground.
Note where bottles, wrappers and tape end up now, and where a bin would have to sit for people to actually use it.
Litter collects at the point where people stop, which is nearly always just inside or just outside the opening.
Record what is wheeled onto the surface, such as a hopper, a net trolley or a maintenance brush, and what those wheels pass over on the way.
Wheels carry grit onto a surface more efficiently than shoes do, and the route they take is worth describing to a contractor.
7.Getting help onto the site when something goes wrong
Nobody plans for the day somebody is hurt or a fault appears, but access is what decides how quickly anyone can help.
Write down how somebody would describe this site to a caller who has never been here, including which entrance they should head for.
Describing where a site actually is turns out to be surprisingly hard under pressure, and writing it down in advance takes moments.
Ask the local authority and a qualified professional what would be expected about vehicle access to a site of this kind, and record the answer you are given.
What access routes must be kept available for emergency vehicles is determined by the local authority and qualified professionals, never assumed.
Consider what happens if the site is locked and somebody outside needs to get in quickly, and record who could open it at short notice.
A locked site is exactly where an entry arrangement becomes a problem, and it is worth thinking through while it is still theoretical.
Note who is contacted when a gate, a lock or the approach becomes unusable, and whether that is written anywhere players can see it.
A fault at the entrance stops the whole facility being used, and a visible contact route is what actually gets it reported.
Record whether anyone is likely to be on site alone, and how they would summon help from the court itself if they needed to.
Sites are used alone more often than anyone expects, and thinking about it early shapes both access and where a contact notice sits.
Arrangements for anyone on site alone, and for summoning help, are settled with qualified professionals and confirmed locally rather than decided from a record like this.
Decide who is responsible for keeping the approach clear of stored equipment, bins and parked vehicles.
Approach routes silently become storage, and naming somebody responsible is the only thing that keeps them open.
Preparation
Documents and information to gather
Having these to hand usually makes the first conversation shorter and more useful.
- A sketch of the route from arrival point to the playing surface with gates marked
- Photographs of the approach taken in dry weather and again after heavy rain
- A list of everyone who currently holds a key or another means of entry
- Notes on what machinery reaches the court now and how each item gets there
- Any site plan showing overhead cables, buried services and manholes on the route
- Any agreement or right of way paper covering the route across other ground
Records
Decisions to record before work begins
Write these down in your own words, with the date, so everyone is working from the same version.
- How many openings the court would have and what each one is for
- Which way each opening swings and whether it closes behind people
- Who holds a means of entry and what happens when one is lost
- Whether the site is used when nobody responsible is present
- Who is responsible for keeping the approach clear and usable
- Where materials and equipment could be unloaded and set down
Professional review
Questions to discuss with qualified professionals
Bring these to the relevant qualified professional, supplier or authority. Requirements vary by project and location.
- Where may an opening sit in relation to the playing area for this sport and standard?
- What would this approach mean for the machinery a court surface needs?
- What has to reach the surface when the court is built and when it is resurfaced?
- How would you protect a finished surface if machinery has to cross it?
- What would you want to know about the ground along this route before planning work?
- What has to be confirmed locally before a new opening onto a road or footpath is considered?
- How is standing water on an approach like this usually dealt with?
- What entry arrangements do you see working on sites used by several groups?
Blind spots
Commonly overlooked items
- The one opening everyone uses while the second is kept permanently locked
- A route that is fine in the dry and barely usable after a wet spell
- Ball baskets and buggies that will not pass through a self-closing opening
- Loose gravel beside the entrance travelling onto the surface on every shoe
- Keys handed on quietly until nobody knows how many exist
- The approach used as storage until nothing wider can get through it
- Machinery for a future resurfacing that cannot reach the court at all
What this checklist does not do
- Nothing here decides how wide a route or an opening should be, or where an opening may sit in relation to a playing area.
- Whether an approach suits people with limited mobility is established by qualified professionals and by what applies locally, not by observation alone.
- Powered gates, entry arrangements and anything electrical on the approach belong with suitably qualified people and are confirmed locally.
- Routes needed by emergency vehicles are determined by the local authority and qualified professionals; nothing recorded here stands in for that.
More preparation
Related checklists
Inspiration
Related Ideas Library pages
Design directions to explore once the preparation is done.
Go deeper
Related Build Design Hub guides
Explanatory planning guidance behind the decisions on this page.
Sports Court & Facility Planning Checklists
Owner-side preparation checklists for court projects — site and use description, and the surface, drainage, lighting and consent questions to raise.
Browse all Sports Court Planning checklists →