Checklists · Operations

Facility Access Control Planning Checklist

Help an owner or operator record every way into the site, rebuild an honest list of who has access and on what basis, and agree how access is issued, returned and withdrawn before the facility opens.

Project stage:Design developmentBefore work beginsHandover

7 sections · 42 planning prompts · educational owner-side preparation

Prints in your browser only. Nothing is saved, sent or tracked.

The checklist

Work through the sections

Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.

7.Questions before any coded or electronic arrangement is adopted

An electronic arrangement moves the problem rather than removing it. Ask these before anything is chosen, not after it is installed.

More preparation

Related checklists

Opening Readiness PreparationPreparation for the point a finished facility starts being used by other people: walking it as a stranger, rehearsing a session, and deciding what would make you wait.Utility Account RecordA record of the services a facility runs on: whose name each account stands in, where the meters and shut-off points are, and who is contacted when a supply fails.Inspection Arrangement QuestionsQuestions to prepare before arranging checks at a facility: which may apply, who is qualified to carry them out, what they need from you beforehand and where the findings go afterwards.Supplier Contact RecordA working record of who supplied, installed and services each part of a facility, what each of them needs from you, and where the boundaries between them fall.Emergency Arrangement QuestionsWhat an operator can usefully assemble and ask about emergency arrangements at a facility, and who actually decides what those arrangements are meant to be.Facility Surface Care PlanningOwner-side groundwork for looking after the surfaces a facility depends on: what each one is made from, what its supplier allows, who goes onto it and what gets written down.Shared Facility AccessHow people, deliveries and machinery reach a shared facility, who is able to let them in, and which of those arrangements have to be confirmed with the landowner.Facility Seating PlanningWhere people already sit at a shared facility, what a donated or memorial bench commits a group to, and who keeps seating in order once the committee has changed.

Inspiration

Related Ideas Library pages

Design directions to explore once the preparation is done.

Go deeper

Related Build Design Hub guides

Explanatory planning guidance behind the decisions on this page.

Facility Operations Readiness Checklists

Preparation checklists for running a facility day to day — information to assemble, routines to agree and records to set up before opening.

Browse all Operations Readiness checklists →