Skip to main content
HELPERG Ecosystem
Build Design HubBuild Design Hub

Checklists · Structural

Movement and Settlement Observation Record Checklist

Sets out how to observe and date what a building, its plot and its surroundings are doing, in plain descriptive terms, so a qualified structural engineer inherits a usable record and no owner assumption about cause or seriousness travels ahead of them.

Project stage:Thinking about itEarly planningChoosing professionals

9 sections · 54 planning prompts · educational owner-side preparation

Prints in your browser only. Nothing is saved, sent or tracked.

The checklist

Work through the sections

Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.

More preparation

Related checklists

Crack Observation RecordA way to build a plain, dated record of the cracks in a property — where each one is, what it looks like and what else changed — for a qualified engineer to interpret.Opening Widening QuestionsQuestions and observations to prepare before asking about making an existing doorway or opening wider, so the conversation starts from recorded facts rather than assumptions.Structural Survey PreparationArrange access, uncover what is normally hidden and write down your observations before a structural visit, so the time on site goes on questions only a professional can answer.Roof Structure AlterationPrepare a roof alteration conversation by recording what is above your ceilings, where the timbers land and what you want changed, leaving every structural judgement to an engineer.Joist and Floor LoadingRecord how a floor appears to be built, what you have felt it do and what you intend to put on it, then take every question about what it can carry to a qualified engineer.Alteration History RecordBuild a dated record of what has already been done to this property, from visible joins and blocked openings to the paperwork nobody kept, before an engineer asks for it.Damp Observation RecordA way to record where marks, smells and cold surfaces appear in an existing property, so a qualified professional starts from located evidence rather than from memory.Weathering Observation RecordA record of how weather actually reaches your building: which face takes the driving rain, where water runs and stains, and what wind, frost and sun leave behind.

Inspiration

Related Ideas Library pages

Design directions to explore once the preparation is done.

Go deeper

Related Build Design Hub guides

Explanatory planning guidance behind the decisions on this page.

Structural Discussion Preparation Checklists

How to prepare a conversation with a structural engineer or surveyor — what to observe and record, and what only a qualified professional can establish.

Browse all Structural Discussion checklists →