Checklists · Structural
Opening Widening Questions Checklist
Sets out what to record about the opening as it stands today, what widening in each direction would disturb around it, and which questions belong with a qualified structural engineer rather than a builder.
7 sections · 39 planning prompts · educational owner-side preparation
https://www.builddesignhub.com/checklists/structural-discussion-preparation/opening-widening-questions · Build Design Hub — educational planning resource. Requirements vary by project and location.
Scope
What this checklist covers
The preparation ground these prompts walk through.
- Describing the existing opening, how its head is formed and whether it was added later
- Marking where the edges of a wider opening would land and what sits at each side
- Recording the finishes, services and joinery that widening would disturb
- Deciding what the finished opening should look like before anyone works it up
- Preparing questions about how far making good would spread into each room
Audience
Who this checklist is for
- Owners wanting a broader link between a kitchen and a dining area
- People replacing a single doorway with a wider opening or double doors
- Owners who have been told an existing opening can simply be made bigger
- Households whose daily route between two rooms runs through the doorway in question
Timing
When to use it
- Recording an existing opening accurately before any change is designed
- Understanding why widening is not a smaller version of forming a new opening
- Listing what has to move if the opening grows in each direction
- Preparing for a site visit so that what you have noticed is visible on the day
- Separating appearance decisions from questions that need professional input
Limits
When it is not sufficient
This is general planning preparation. These situations need a qualified professional, and often the relevant authority.
- Deciding how far an opening can be widened, which is for a qualified structural engineer
- Selecting, sizing or specifying anything that spans over an opening
- Saying which permissions or notices apply here, which is a matter for your local authority
- Any work on site, including removing plaster or architrave to see what is above
- Judging whether an existing head detail is adequate for a wider opening
The checklist
Work through the sections
Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.
1.Recording the opening exactly as it is now
Widening starts from what is already there, and what is already there is often not what people assume. Record the existing opening before discussing any change to it.
Measure the existing opening roughly at the finished edges, note where you measured from, and label it as your own rough note rather than a dimension for anyone to work to.
A rough note lets everyone talk about the same opening, while making clear that proper measurement is somebody else's responsibility.
Note how the top of the opening appears: a flat head, an arch, a visible timber, a boxed line above, or a plain plastered surface with nothing showing, and photograph it straight on.
What is visible above an opening is one of the first things an engineer looks at, and photographs taken before anything is stripped are the most reliable record.
What you can see above an opening does not tell you what is doing the work there; only a qualified structural engineer can establish that.
Look for signs the opening was added after the building was finished: different skirting, patched plaster around the reveals, a change in floor finish across the threshold, or mismatched architrave.
Openings formed later are often built differently from original ones, and the traces are usually still visible to anyone who looks for them.
Note how deep the reveals are, whether the wall seems thicker or thinner at the opening, and whether a frame or lining is built into it.
Reveal depth affects how the finished opening will look and how much making good spreads into each room.
Note whether the current door closes properly, catches on the frame, or has been eased at any edge, and write down when you first noticed it.
How a door sits in its frame is an observation an engineer may find useful, and it is much harder to describe accurately from memory later.
Photograph the opening from both rooms, including the ceiling above it and the floor across the threshold, with something ordinary in shot for scale.
Photographs that include the surroundings answer questions the close-up shots never do, particularly about levels and finishes.
2.Marking where the wider edges would land
Widening is a question about the two new edges, not the middle. Marking them physically in the room tells you more than a drawing ever does.
Mark where each new edge would sit using low-tack tape on the wall and floor, then live with the marks for a while before deciding anything.
Openings almost always look different in the room from how they look on paper, and tape is the simplest way to find that out before anyone commits.
Note what each proposed edge runs towards: a room corner, a return wall, a staircase, a window reveal, a chimney breast or the end of the wall itself.
What happens at the ends is usually the deciding factor in these conversations, and it is the part owners tend not to describe.
Photograph each proposed edge with a tape measure in shot showing how close it comes to the nearest corner, without deciding what is or is not acceptable.
A photograph with a tape in it lets an engineer see the relationship immediately and ask better questions before visiting.
Consider whether widening in one direction only would keep clear of something significant, and write that down as an option to put to the engineer.
Asymmetric widening is often overlooked because people picture the opening growing evenly from the middle.
Note what the floor does across the threshold: a level change, a threshold strip, different finishes in each room, or heating within the floor build-up.
A wider opening exposes more of the join between two floor finishes, and the join is where the result looks either resolved or unfinished.
Note whether the wall containing the opening is shared with, or built up against, a neighbouring property.
Where a wall is shared, other households and other paperwork enter the conversation before design work is worth doing.
A wall built against or shared with another dwelling brings a separate process with it; ask your local authority what that process is before designing anything.
3.What sits directly over the opening
The area above an opening decides most of what follows. Look at it from every side you can reach without disturbing anything.
Write down what is in the room directly above the opening, particularly anything fixed and heavy sitting near that line, and photograph the floor area concerned.
What sits above is part of the picture an engineer builds, and it is quicker for you to note than for them to discover on the day.
If the wall has an outside face, note whether a window, door or other opening sits above or near the line of the proposed widening on that elevation.
Openings stacked above one another change the conversation, and the outside face is the one owners rarely photograph.
Note which way the floorboards or ceiling boards run across the opening, and record the observation as something to be interpreted by someone qualified.
Direction is easy for you to observe and difficult to establish later once floors are covered or ceilings are lined.
If the opening is on the top storey, note what the roof does above it and whether the loft over that line is boarded, converted or used for storage.
Roof arrangements above an opening are frequently the reason a straightforward request becomes a more involved discussion.
Note any boxed-in downstand, bulkhead or dropped ceiling near the opening that may relate to earlier work, and photograph where it starts and stops.
Existing supports from earlier alterations often sit close to the opening being discussed, and where they end matters.
4.What widening would disturb around the opening
The work rarely stops at the edge of the opening. Recording what sits alongside it shows how far making good is likely to spread.
Note every switch, socket and outlet within reach of the proposed edges on both faces of the wall, and photograph them in relation to the tape marks.
Switches beside a doorway are almost always in the way of a wider opening, and moving them affects both decoration and daily use.
Record any radiator, pipe run or heating control near the opening on either side, and note where the pipes disappear.
A radiator that has to move takes its pipework with it, and that often involves floors in a room nobody expected to disturb.
Note whether cornice, coving, picture rail or a dado runs across the wall above or beside the opening, and photograph how each one currently terminates.
Decorative runs that stop at a wider opening look wrong unless somebody decides in advance how they should end.
Photograph the skirting and architrave profiles at the opening and note whether they appear original, since matching them again is a decision to make early.
Older profiles are frequently no longer available in the same form, and finding that out late forces a rushed compromise.
Record alarm sensors, thermostats, entry equipment and any cabling clipped near the opening, noting what each belongs to.
These items usually sit exactly where an opening wants to grow, and each one has a different person responsible for moving it.
Note the age of the property and the type of finish around the opening, and write down a question about whether anything present needs specialist handling before disturbance.
Older buildings contain materials that are perfectly stable until they are disturbed, and that question belongs at the start rather than mid-project.
If materials of uncertain type may be present, ask a suitably qualified surveyor to advise before anything is stripped, cut or removed.
5.Doors, frames and what replaces them
A wider opening is also a decision about whether a door remains at all, and that decision reaches further into daily life than the structure does.
Decide and record whether the wider opening keeps a door, and note what you rely on the current door for: heat, noise, cooking smells, pets or privacy.
The reasons a door is closed are easy to forget when picturing an open space, and every one of them returns once it is gone.
If sliding or pocket doors interest you, write down where the door would sit when open and ask what such an arrangement needs from the wall it slides into.
Where the leaf goes when open is the question that decides whether the idea is workable in a particular wall.
Note which spaces the opening connects, such as a room adjoining a stair, a garage or a kitchen, and record a question about what local requirements apply to doors between them.
Requirements differ depending on what sits either side, and the answer belongs to the local authority and qualified professionals rather than to a checklist.
Requirements for doors between certain spaces vary by location and building; confirm what applies with the relevant local authority and a qualified professional.
Note which way any retained door swings and what sits behind it when open, since a wider opening usually changes both.
A door that used to disappear against a wall can end up standing in the middle of a route once the opening moves.
Write down how the opening is used daily, such as carrying trays, moving a pushchair or a wheeled bin, and note anything at the threshold that catches.
Daily use tends to test a proposed width more honestly than a drawing does, and only the household is in a position to describe it.
6.How the finished opening should look
Appearance decisions made early leave the professionals free to work within them. Made late, they force a rethink of things that were already settled.
Decide and record whether you want to explore a flush ceiling across the opening or would accept a visible downstand, and note which matters more to you.
This single preference shapes most of what follows, and stating it early lets an engineer say quickly what each version would involve.
Note whether you want square plastered edges, returned reveals, or the opening to match the detailing of other openings in the room.
Edge detailing is what makes a new opening look either original or obviously new, and it is decided far too late in most projects.
Check whether the head heights of other doors and windows in the room line up, and note whether you want the wider opening to align with them.
Misaligned heads are the detail people cannot name but tend to notice anyway, particularly when two openings are seen together.
Note whether the room has a consistent joinery style that the finished opening should follow, and photograph the least altered surviving example of it.
A photograph of the original detail is more useful to whoever makes the replacement than any written description.
Note where light currently falls in each room and write down where lighting would be needed once the opening is wider and the rooms read as one.
Lighting layouts drawn before the opening is agreed usually end up wrong, and rewiring after decoration is the worst time to discover it.
Note what happens to the floor where the existing jambs stand, since that strip will be exposed once they are gone.
The floor under a doorway is frequently unfinished or patched, and it becomes visible the moment the opening grows.
7.Assembling the opening record before the visit
Everything above becomes useful only if it is in front of the person you are asking. Assemble it in one place before the visit.
Leave the tape marks showing the proposed edges in place for the visit rather than tidying them away beforehand.
Marks on the wall let a discussion happen in the room rather than in the abstract, and they prompt questions a drawing does not.
Put your photographs, rough notes and a simple sketch with the room names into one folder, dated, so nothing has to be described from memory.
A single organised folder is worth more than a long conversation, and it stays useful when other people join the project later.
Write down what anyone has already told you about this opening, who said it and when, and keep it separate from what you have observed yourself.
Separating hearsay from observation makes the record trustworthy and stops second-hand remarks being treated as findings.
Nothing you have been told informally about the opening is a structural assessment; treat it all as material to check with a qualified structural engineer.
Ask what may need to be opened up above the existing opening before a firm view is possible, and who would arrange and make good that work.
Investigation is frequently required at this exact spot, and knowing that in advance prevents the project stalling at the first visit.
Do not remove architrave, plaster or lining above the opening to look for yourself; that work belongs with people able to support what is above.
Ask what you will receive after the visit, in what form, and who each document is intended for, such as a builder or the local authority.
An owner who does not know what is coming cannot tell that something is missing until a builder asks for it and nobody has it.
Preparation
Documents and information to gather
Having these to hand usually makes the first conversation shorter and more useful.
- Photographs of the existing opening from both rooms, including the head, the reveals and the threshold
- Any drawings of the property that show the wall, including agent plans and earlier alteration drawings
- Paperwork from any previous work on this wall or in the rooms either side of it
- The survey report from purchase, with any comments about openings, alterations or the wall noted
- A dated sketch showing the existing opening and the proposed wider edges, marked with room names
- Photographs of the joinery, skirting and cornice profiles that any making good would need to match
Records
Decisions to record before work begins
Write these down in your own words, with the date, so everyone is working from the same version.
- Whether the opening should widen evenly or only in one direction, and what drives that preference
- Whether a flush ceiling across the opening matters more to you than avoiding investigation and disruption
- Whether the finished opening keeps a door, and what that door is expected to do
- How closely the new edges, reveals and joinery should match the existing detailing in the room
- Which making-good work you would accept spreading into the rooms either side, and which you would not
Professional review
Questions to discuss with qualified professionals
Bring these to the relevant qualified professional, supplier or authority. Requirements vary by project and location.
- What would you need to see above the existing opening before you could give a firm view?
- How does widening an existing opening differ from forming a new one in the same wall?
- Does the existing head detail change what you would need to do here, or is it irrelevant?
- Who designs and arranges the temporary support while the opening is enlarged?
- How far either side of the opening should I expect making good and redecoration to reach?
- Which authority or body should I be talking to about this, and when is the right moment?
- Does anything about how the existing door behaves change what you would want to look at?
- What information would a builder need from you, and at what point in the process?
Blind spots
Commonly overlooked items
- The light switch immediately beside the doorway that has nowhere obvious to go
- The cornice or picture rail that has to stop somewhere once the opening is wider
- The unfinished strip of floor hidden under the existing door jambs
- The head heights of nearby windows and doors that the wider opening will be compared against
- What the current door is actually relied on for, from noise to cooking smells to pets
- The outside face of the wall, which is rarely photographed and often has an opening above
- Skirting and architrave profiles that cannot be matched once the originals are broken out
What this checklist does not do
- Nothing here indicates how far any opening can be widened. That is a structural question for a qualified engineer, and the answer differs from building to building.
- An existing opening tells you nothing reliable about what a wider one would need; assumptions carried over from the current head detail are a common source of trouble.
- Do not strip architrave, plaster or linings above the opening to investigate. Exposing the head of an opening is work for people able to support what sits above it.
- Requirements for doors between particular spaces, and for notices to attached neighbours, vary by location and tenure; confirm both with the relevant local authority.
More preparation
Related checklists
Inspiration
Related Ideas Library pages
Design directions to explore once the preparation is done.
Go deeper
Related Build Design Hub guides
Explanatory planning guidance behind the decisions on this page.
Structural Discussion Preparation Checklists
How to prepare a conversation with a structural engineer or surveyor — what to observe and record, and what only a qualified professional can establish.
Browse all Structural Discussion checklists →