Who this guide is for
- Self-builders setting finished floor levels before the build-up is finalised
- Owners planning level or low thresholds at external doors
- Anyone changing a floor covering in an existing building
- Owners planning accessible circulation through a house
- Anyone reconciling a heated floor build-up with an existing doorway
Everything under the finish takes depth
The reference entries describe the layers of a floor as interdependent rather than stacked arbitrarily. Each has a position it has to occupy relative to the others, and none of them can be thinned to make the arithmetic work without changing what it does.
The clearest case is the layer above the insulation in a ground floor. Where the thermal layer sits above the slab, the layer over it stops levelling and becomes an unbonded screed carrying loading across something compressible, which means its depth is decided with the layer beneath it rather than adjusted to suit a doorway.
Depth has to be planned before levels are fixed
The practical consequence is a sequencing one. If the finished floor level is fixed first and the build-up developed afterwards, any layer that turns out to need more depth than was assumed has to take it from something else — the structure below, the head height above, or a step at a threshold.
The entries approach this from the finishes side and reach the same conclusion: the floor covering is best chosen early enough for the base beneath it to be specified around it, rather than selected once the base has already been built.
Where the step ends up
A step has to appear wherever two floors of different total depth meet, and in practice that is a small number of predictable places: the external doorway, the junction between a heated area and an unheated one, the boundary between two coverings, and the head of a stair where the top riser has to reconcile with the finished level above.
Where an existing floor is being re-covered, the same arithmetic runs in reverse. A thicker build-up than the original has to be absorbed by the doorway, by trimming a door, or by a transition that was not in the original design.
- External and internal doorways, where two build-ups meet
- Boundaries between heated and unheated areas
- Changes of covering within one level
- The head and foot of a stair, where riser heights are settled
The doorway is where isolation is most often bridged
The floating screed entry names the doorway twice: as the place the isolation is most often bridged, and as the place the covering usually changes. The joint in the screed, the threshold detail and the edge strip all meet in a narrow line that several different trades pass through.
The consequence is disproportionate. A floating screed touching the wall at a doorway, bridged by a pipe sleeve, or pinned to the base by a fixing driven through it has ceased to float at that point, and the whole layer behaves differently for the sake of one contact.
The strip has to survive the finishing trades
The perimeter isolation strip is a small component with a disproportionate consequence. It has to be continuous around the entire perimeter, including at doorways and behind fitted units, and extend to the full height of the floating layer so that contact cannot occur above it.
The entries also name the moment it is lost. It is installed early and trimmed at the end, and the trimming stage is where it is frequently cut back too far or removed. Cutting it below the top of the floating layer opens a contact path, and a skirting fixed to both wall and floor reconnects them.
The threshold pulls in two directions
The desire for a low or level threshold and the need for the barrier and the isolation to be carried through it pull in opposite directions. At a threshold the layers are compressed into the least available height, and each has to connect to something made of a different material that arrives at a different time.
That conflict is resolved at design stage rather than deferred to the person holding the sealant. Where an accessible threshold is wanted, that is a reason to settle the build-up depth earlier rather than a reason to take depth out of the build-up.
What to fix on the drawings
The information that prevents most of this is short: the intended total depth of each build-up, the finished floor level in each area, the position of any change in level, and the detail at each doorway showing how the isolation and any joint are carried through. Fixed early, those four decide the rest. Left open, they are settled by whoever arrives last.
Planning build-up depth and thresholds
- 1Establish the intended total depth of the build-up in each area before levels are fixed.
- 2Ask which layers in the stack cannot be thinned without changing what they do.
- 3Identify every place two build-ups of different depth will meet.
- 4Decide where a change in level is intended to fall, rather than discovering it.
- 5Ask how the perimeter isolation is kept unbroken at every doorway.
- 6Ask whether the strip extends the full height of the floating layer, including any screed poured against it.
- 7Ask how the strip is protected from being cut back during finishing.
- 8Establish how skirtings will be fixed so they do not bridge floor to wall.
- 9Ask how a joint in the screed at a doorway is carried through the covering.
- 10Where a low or level threshold is wanted, settle the build-up depth before the threshold detail.
- 11Check head height beneath any ceiling or beam the build-up depth will affect.
- 12In an existing building, measure what the current build-up is before choosing a thicker covering.
Common mistakes to avoid
- Fixing finished floor levels before the build-up depth is known.
- Thinning a layer to make the arithmetic work, when its depth was decided with the layer beneath it.
- Choosing a covering after the base is built, when the base is normally specified around the covering.
- Leaving the position of a change in level to be discovered at the doorway.
- Trimming the perimeter strip below the top of the floating layer, which opens a contact path.
- Fixing a skirting to both wall and floor where the floor is isolated.
- Deferring the threshold conflict to the person holding the sealant rather than resolving it in design.
When to involve a professional
- Build-up depth is a design output for a particular floor, and nothing here states a depth, a step height or a threshold dimension.
- Screed make-up and depth over a compressible layer depend on the layer beneath and the loading above, and are design matters.
- Whether a threshold arrangement is appropriate for a particular building, including for accessible use, is a determination for qualified professionals and local requirements.
- Acoustic behaviour is a property of a complete tested construction with its flanking junctions, and none is stated here.
Frequently asked questions
Questions readers ask about this topic
Why can a screed not just be made thinner at a doorway?
Where a screed floats over a compressible layer it is spanning rather than levelling, so its make-up is decided with the layer beneath it. Reducing it locally changes what it is doing at that point, which is a design matter rather than a site adjustment.
Where does the step go if the build-up is deeper than expected?
Somewhere it was not drawn. In practice it appears at a doorway, at a boundary between coverings, at the junction of a heated and unheated area, or at the head of a stair. Deciding where in advance is what separates a detail from a surprise.
How is the perimeter strip lost at a doorway?
The entries describe several routes: it is trimmed back too far during finishing, a skirting is fixed to both wall and floor, a pipe crosses the line, or the covering bridges the gap. Any one hard contact reconnects the floating layer to the structure.
Can I have a level threshold with a floating floor?
The entries describe the conflict rather than resolving it: the desire for a low threshold and the need to carry the barrier and the isolation through it pull in opposite directions, and that is settled at design stage for the specific building by qualified professionals.
What should I measure before changing a floor covering?
What the existing build-up is and what depth the new covering will add, together with the clearances at every doorway the new floor reaches. A covering chosen without that arithmetic commonly has to be absorbed by trimming doors or by an unplanned transition.