Ideas Library · Landscape Transitions
A Forecourt That Belongs to Neither Side
The strip between a public-facing frontage and the public pavement treated as a threshold zone rather than an enclosed plot, so the building reads as open while the line between private and public ground stays clear.
Where this idea works
Where this idea works
Contexts this direction tends to suit — and, honestly, where it may not.
- Public-facing frontages where an enclosed forecourt would read as closed
- Buildings whose entrance is set only a short distance back from the pavement
- Frontages wanting to give something to the street without giving up the line
- Schemes where planting and surface can carry a boundary's work
Where it may not fit
Where it may not fit
- Frontages where security, containment or a licence requires a physical boundary
- Entrances opening directly onto a busy trafficked edge
- Forecourts that also take parking or servicing, which need defined edges
Planning
Planning considerations
- The line between private land and the public highway exists in law even where nothing is built on it, so confirm where it runs
- Anything sitting on or overhanging the public edge is a matter for the highway authority rather than the design
- Decide what the forecourt is for — waiting, arriving, sitting, displaying — because an empty band invites uses nobody chose
- Consider drainage across the line, since water must not be sent onto the public surface
Layout
Layout considerations
- Hold one level across the band and let surface do the dividing, because a step reintroduces the boundary
- Set planting as a rhythm rather than a continuous run, so the band reads as open with incidents in it
- Keep the approach to the entrance clear and obvious; the forecourt should not make people hunt for the door
- Let the building's own line, rather than the plot's, set out the paving
Materials & finishes
Materials and finishes to discuss
Named generically as starting points to discuss with professionals — not specifications, and not priced.
- A publicly accessible surface takes wear a private frontage never sees
- Planting at a public edge meets trampling, litter and material spread on the pavement in winter
- The junction with the public surface moves independently of the forecourt
Maintenance & durability
Maintenance and durability questions
- An open band collects litter blown in from the street and needs a regular sweeping regime
- Damage on a publicly used surface needs attention promptly because it is publicly used
Professional review
What to ask a qualified professional
Bring these questions to a designer, contractor or the relevant qualified professional or authority.
- Where exactly does our boundary with the public highway run, and who confirms it?
- What does the highway authority require at the junction between our surface and the pavement?
- How is surface water managed so it does not discharge onto the public surface?
- Does having no boundary raise issues a qualified professional should assess for this use?
- What level relationship is appropriate between our threshold and the pavement?
More ideas
Related ideas
Related guides
Related Build Design Hub guides
- /architecture/zoning-rooms-by-public-and-private-areas →
- /construction/alterations-that-create-a-drainage-requirement →
- /construction/building-close-to-a-boundary-or-neighbouring-structure →
- /construction/building-on-made-ground-planning →
- /construction/choosing-a-below-ground-water-resistance-approach →
Landscape Transition Ideas
Educational inspiration for the edges in a landscape — where one ground treatment meets another, where a level changes, and where made ground meets planted ground.
Browse all Landscape Transitions ideas →