External Repair Priority Record Checklist

Helps an owner build a plain, located record of external repairs, note which items depend on others and which share the same access, and hand the whole thing to a qualified professional without attempting to diagnose or order the work themselves.

Project stage:Thinking about itEarly planningBrief and scope

8 sections · 42 planning prompts · educational owner-side preparation

Prints in your browser only. Nothing is saved, sent or tracked.

The checklist

Work through the sections

Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.

More preparation

Related checklists

External Wall Insulation →Preparation for wrapping the outside of a house: what the elevations carry today, where the building line would change, and which detailing questions to put to a professional.Brick and Stone Repair →Describe what the walls are built of, record cracking and decay exactly as observed, and note what generations of earlier repair have left behind on the masonry.External Door Specification →Work out what your entrance door has to do before choosing one: how the opening is used, what weather it takes, and which security and finish points to raise.Bifold and Sliding Doors →Before a wide glazed opening is ordered: how it will really be used, where the panels go when open, what the threshold has to do, and which points belong with professionals.Cavity and Solid Wall →How to gather evidence about what your outside walls are, from bond patterns and reveals to damp marks, and hand it over instead of guessing at the answer.Glazing Performance Questions →What to ask about the glass itself: the problem you want solved room by room, warmth, daylight, glare, noise and privacy, and what a sealed unit asks of you afterwards.External Works Planning →Getting the drive, paths, levels, boundaries and planting into a construction brief early, instead of leaving everything outside the walls until the end of the job.External Wall Discussion →The outside of a property carries fixings, ground conditions and boundary questions, and this checklist gathers those elevation observations before a first external conversation.

Inspiration

Related Ideas Library pages

Design directions to explore once the preparation is done.

Go deeper

Related Build Design Hub guides

Explanatory planning guidance behind the decisions on this page.

Building Envelope & Openings Checklists

Preparation checklists for walls, roofs, insulation, windows and doors — describing the building you have and the questions to raise about performance.

Browse all Envelope & Openings checklists →