Construction Water and Drainage Questions Checklist

Help an owner map the incoming supply, foul and surface drainage, chambers and problem areas on their own property, and turn that into questions for qualified professionals rather than into conclusions about capacity or responsibility.

Project stage:Early planningDesign developmentBefore work begins

8 sections · 42 planning prompts · educational owner-side preparation

Prints in your browser only. Nothing is saved, sent or tracked.

The checklist

Work through the sections

Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.

More preparation

Related checklists

Drawing Review PreparationOwners and designers read drawings differently. This checklist helps you prepare to review an issued set, test whether your brief survived it, and ask sharper questions.Progress Review PreparationPreparation for a site walkaround: what to bring, what to look at before it disappears behind a finished surface, and how to record what was said afterwards.Construction Security DiscussionPreparing to talk about security on a construction project: the plot while work is under way, the approach a stranger makes to the door, and provision agreed before walls close.Future Adaptability QuestionsFor owners of a new build or major construction project: how to name the changes a building may have to absorb later, and which adaptability questions belong with professionals.Door Schedule PreparationDoors are usually drawn as a swing and never described in words; this helps an owner set down handing, thresholds, linings and locking door by door.Daylight and OrientationWorking out which way a new building should face, which rooms want which part of the day, and what an owner can usefully observe on the plot before any drawings begin.Ceiling Height QuestionsTurns a vague worry about low ceilings into recorded observations and questions, covering the ceiling zone, bulkheads and the heights that get fixed early.Fixings and ServicesWhat an owner should mark, ask about and photograph before walls and ceilings are closed, so fixings, outlets and service routes are not discovered too late.Groundworks ConversationRecord what you can already see about your ground, access, levels and buried services so the first groundworks conversation starts from observation rather than guesswork.

Inspiration

Related Ideas Library pages

Design directions to explore once the preparation is done.

Go deeper

Related Build Design Hub guides

Explanatory planning guidance behind the decisions on this page.

Construction Project Planning Checklists

Owner-side preparation checklists for new-build and major construction projects — scope, information to gather and the questions to bring to qualified professionals.

Browse all Construction Planning checklists →