Skip to main content
HELPERG Ecosystem
Build Design HubBuild Design Hub

Checklists · Site logistics

Site Water and Power Questions Checklist

Help an owner locate the existing supplies, understand what a working team will need from them, and prepare the questions about temporary arrangements, interruptions and meter records that are far easier to settle before work begins.

Project stage:Early planningBefore work beginsDuring the project

7 sections · 42 planning prompts · educational owner-side preparation

Prints in your browser only. Nothing is saved, sent or tracked.

The checklist

Work through the sections

Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.

More preparation

Related checklists

Site Welfare QuestionsWhat a working team needs by way of a toilet, washing and somewhere to take a break, what your household is willing to share, and who arranges the rest.Site Key and Access HandoverHanding over access to a property for building work: which entry points are involved, who holds keys and codes, how it is recorded, and how the arrangement ends.Material Storage On SiteWhere materials land, where they live and what each place gives up in return, with the storage questions worth settling before the first delivery arrives.Site Access Route RecordA way to record the route from the public road to where work will happen, including the pinch points, surfaces and shared stretches others need to know about.Site Photography RecordPlanning a photographic record of a property around building work: what to capture, when it has to happen, how images stay usable, and where the record is kept.Site Parking QuestionsHow your street actually works, how many vehicles the work brings to it, and which of the parking questions can only ever be answered by the local authority.Site Security ConversationPreparing to discuss how a property is kept secure while work happens: what is on site, how an open building is closed up, who holds access and what neighbours are told.Condition Record Before WorksWhat to write down about a property before anyone starts: existing damage, meter readings, shared structures, planting, and how the record is issued and acknowledged.

Inspiration

Related Ideas Library pages

Design directions to explore once the preparation is done.

Go deeper

Related Build Design Hub guides

Explanatory planning guidance behind the decisions on this page.

Site Access & Logistics Checklists

Planning the practical side of having work happen at a property — access, deliveries, waste, neighbours, protection and the record made before work starts.

Browse all Access & Logistics checklists →