Site Water and Power Questions Checklist
Help an owner locate the existing supplies, understand what a working team will need from them, and prepare the questions about temporary arrangements, interruptions and meter records that are far easier to settle before work begins.
7 sections · 42 planning prompts · educational owner-side preparation
https://www.builddesignhub.com/checklists/site-access-and-logistics/site-water-and-power-questions · Build Design Hub — educational planning resource. Requirements vary by project and location.
Scope
What this checklist covers
The preparation ground these prompts walk through.
- Finding and recording where water and electricity enter the property and how each is isolated
- What a working team typically needs to draw from the existing supplies during the work
- Interruptions to water and power in the parts of the property still being lived in
- Meter readings, usage records and who is responsible for consumption during the work
- Shared stopcocks, communal intake cupboards and neighbouring arrangements to raise early
- Gas, flues, detectors and the supplies that need their own conversation entirely
Audience
Who this checklist is for
- Owners preparing for work in a property that will stay occupied while it is carried out
- Owners who have never located their own stopcock, meter or main isolation point
- Owners of older properties where the supply arrangements are unclear or undocumented
- Owners in flats or shared buildings where supplies run through communal spaces
Timing
When to use it
- Building a written record of where each supply is and how it can be isolated
- Preparing questions about temporary power and water arrangements for the work
- Planning around periods when water or electricity may be unavailable in the house
- Agreeing in advance how usage during the work is recorded and by whom
- Raising shared and communal supply arrangements with a managing party before work is arranged
Limits
When it is not sufficient
This is general planning preparation. These situations need a qualified professional, and often the relevant authority.
- Deciding whether an existing supply is adequate for the work being planned
- Making any judgement about the condition or capacity of wiring, pipework or a meter
- Establishing what may lawfully be connected, isolated or altered at your property
- Carrying out any isolation, connection or alteration yourself rather than asking someone qualified
The checklist
Work through the sections
Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.
1.Finding the supplies before anyone else has to
These are asked for on the first morning, usually while someone stands waiting. Locating them yourself in advance takes far less time than searching under pressure.
Find the main stopcock, note the room and what it sits behind, and check by hand whether it actually turns before anyone needs it in a hurry.
Stopcocks that have not moved in a long time frequently seize, and discovering that during an escape of water is the worst possible moment.
If the stopcock does not move easily, stop and ask a qualified professional rather than forcing it.
Note where the consumer unit and main switch sit, whether they can be reached without a ladder, and whether anything is stacked in front of them.
Access to the main switch matters most at the moment it is needed, and in many houses it is behind coats, boxes or a fitted cupboard.
Record where the water meter, electricity meter and any external isolation point are, including whether a key, code or tool is needed to reach them.
External points are often in a footway box or a locked cupboard, and the absence of a key stops the work rather than delaying it.
Walk the outside and note every tap, socket and light fed from the house, including anything in a shed, garage, greenhouse or garden wall.
Garden and outbuilding supplies are regularly forgotten until something stops working, and they are often the ones a working team would use.
If the property has a well, borehole, storage tank, pump or a private drainage arrangement, write down what you know about it and what you do not.
Private arrangements change what isolation means entirely, and a qualified professional will want to know they exist before anything is planned.
A private supply or private drainage arrangement should be discussed with a qualified professional before any work affects it.
Photograph each supply point in position and mark them on a simple plan that can be handed to whoever works on the property.
A marked plan turns a series of first-morning questions into one sheet of paper, and it stays useful long after the work finishes.
2.What the work will actually draw from your supplies
Owners often assume an outside socket and a garden tap will cover it. The demands of the work are worth establishing in specific terms instead.
Ask whoever will carry out the work what they expect to draw water and electricity from, and record the answer rather than assuming an outdoor socket will do.
Working arrangements vary widely, and the answer determines whether anything temporary needs arranging before the first working period.
Ask whether any equipment runs continuously, such as drying, dehumidifying or extraction plant, and where each item would be plugged in.
Continuously running equipment behaves differently from occasional tool use, and it usually needs a position agreed rather than chosen at the last moment.
Note which sockets and lights serve the area being worked on, and ask what happens to them once work starts in that part of the property.
Rooms adjoining the work often lose power without anyone expecting it, because a circuit rarely stops where a room does.
Ask whether a temporary supply arrangement is proposed rather than using the existing installation, and who is responsible for arranging it.
A temporary arrangement usually involves other parties and lead-in work, so it is one of the earliest things to establish.
Any temporary supply arrangement belongs with a suitably qualified professional and, where relevant, the supply provider. Nothing here suggests one is or is not needed.
Walk the route a cable or hose would follow from the supply point to the work area, and note every door, threshold and stair it would cross.
Cables and hoses across a threshold are a daily nuisance and a common cause of doors being left open, so the route is worth agreeing early.
Ask whether anything will be left running when nobody is present, and agree how you will be told before that happens rather than after.
Equipment running in an empty property worries neighbours, affects usage records and is a frequent source of avoidable friction.
3.Where water is drawn from and where dirty water goes
The second half of this question is the one that gets skipped. Water used on site has to end up somewhere, and that somewhere is usually your drainage.
Identify the nearest tap the work could realistically use, and check whether it works and whether reaching it means passing through the house.
An unusable or awkwardly placed tap pushes water collection indoors, which changes the protection arrangements for the rest of the property.
Ask where water used for washing tools, cutting or mixing is intended to go, and record what you are told rather than assuming it is obvious.
Wash-out water carries fine solids, and where it is put has consequences for drainage that appear long after the work has finished.
What may be discharged to a drain, a gully or the ground is governed locally. Confirm the position with the relevant authority or a qualified professional.
Note where gullies, drainage covers and downpipes sit along the working route, and mark them so nothing is stacked or parked on top of them.
Covers and gullies are broken by wheels and stacked material more often than by anything else on a domestic project.
Ask whether water will be needed inside the property, and if so at which sink or basin, so the arrangement is agreed rather than assumed on the day.
A household sink used for mixing and washing out is one of the most common sources of avoidable damage and irritation.
Ask what happens to an outside tap and any exposed pipework during colder conditions while the property is open to the weather.
Exposed pipework in an open building behaves differently from pipework in a heated house, and the consequences are not always visible immediately.
Protecting pipework in an open or unheated property is a matter for a qualified professional rather than something to judge yourself.
Ask who turns the water back on after any isolation, and how you would know it had been done before the household relies on it.
Supplies restored without anyone saying so, and supplies left off once everyone has gone, both cause problems that one agreed arrangement prevents.
4.Living in the property while supplies are interrupted
Interruptions are normal. What causes difficulty is being told about them at the moment they happen rather than beforehand.
Write down everything in the household that stops working when the water is off, including heating, hot water, a toilet and a washing machine.
Seeing the list makes clear whether an interruption is an inconvenience or a reason to be elsewhere, and that changes what you agree to.
Write down what stops when the electricity is off, including a boiler, a fridge freezer, a door entry system, an alarm and any care equipment.
Owners usually think of lights and forget the systems that quietly depend on power until the moment they fail.
Agree how much notice you receive before a planned isolation, and by what route that notice reaches you if you are not at the property.
Notice is what turns an interruption into an arrangement, and agreeing the route matters as much as agreeing the notice.
Note anyone in the household who depends on continuous power or water for health reasons, and raise it before any isolation is planned.
This changes the whole arrangement and needs to be known by everyone involved rather than mentioned on the morning it matters.
Where someone depends on a supply for medical reasons, raise it with the supply provider and a qualified professional well before work is arranged.
Decide in advance what the household does during an interruption, including where you would wash and what you would do about food and heating.
Deciding this calmly beforehand is far easier than improvising it at the point when the supply has already gone off.
Ask what happens if an isolation cannot be reversed at the end of the working period, and who is responsible for telling you and for putting it right.
Most difficult interruptions are the ones that were meant to be brief, and the arrangement for that case is rarely agreed in advance.
5.Meter readings and responsibility for what is used
This is an unglamorous record that repays the few minutes it takes. It is also almost impossible to reconstruct once work has started.
Take a dated photograph of every meter reading before work begins, and again when it finishes, so both parties can refer to the same record.
A dated image settles a question that is otherwise argued from memory, and it takes almost no effort at the right moment.
Agree in writing whose responsibility the water and electricity used by the work is, and record that agreement before anyone starts drawing on it.
This is settled easily in advance and awkwardly afterwards, particularly where equipment has been running continuously.
Note whether any meter needs a physical key, card or code to operate, and who would deal with it if the supply cut out during a working period.
A supply that stops mid-morning with nobody at home to restore it wastes a working period and is entirely preventable.
Ask whether any part of the work would draw from a neighbouring or communal supply, and treat that as something to agree before work begins.
Drawing from a communal or neighbouring supply without agreement is one of the quickest ways to lose goodwill in a shared building.
Using a communal or neighbouring supply is a matter for the managing party or the other owner. Ask them directly rather than assuming it is acceptable.
Write down the account references for each supply and where the paperwork is kept, so a query can be raised without hunting through a drawer.
Every conversation with a supply provider begins with these, and having them to hand shortens what is otherwise a long phone call.
Keep the meter photographs and the usage agreement with the rest of the project papers rather than loose on a phone.
Records that live in one place are the ones that are still findable when a question comes up after the work has ended.
7.Gas, flues and detection that need their own conversation
These belong entirely with qualified people. The owner-side task is to know what exists, know who services it, and ask before anything is disturbed.
Note where the gas meter and its isolation control are, whether anything blocks reaching them, and who at the property knows where they sit.
Knowing the position is owner-side knowledge worth having, entirely separately from anything being done to the supply.
Never carry out or arrange any work on a gas supply yourself. Anything involving gas belongs with a suitably qualified and registered professional.
List which appliances are fed by which supply, including anything in a garage or outbuilding, so nothing is overlooked when isolation is discussed.
Appliances outside the main house are routinely forgotten, and an isolation that seemed complete turns out not to have been.
Ask what is intended for any existing flue, vent or air brick in the work area, and record it as a question for a qualified professional.
Flues and ventilation openings serve appliances and rooms in ways that are not obvious from looking at them.
Anything affecting a flue, a vent or the air supply to a fuel-burning appliance must be established by a suitably qualified professional first.
Note any oil tank, solid fuel store, heat pump or other arrangement at the property, and write down who currently looks after each.
These are frequently omitted from a conversation that focuses on water and electricity, and each has its own handling questions.
Ask what happens to smoke and other detectors while dust is being created, and who is responsible for restoring them afterwards.
Detectors taken down for dust and never replaced is a well-known pattern on domestic projects, and nobody notices until far later.
Detection arrangements belong with a qualified professional. Do not decide yourself what may be removed or left disabled, or for how much of the work.
Write down who currently services each system at the property and how to reach them, so they can be contacted before anything is disturbed.
The person who last serviced a system usually knows things about it that are not written down anywhere else.
Preparation
Documents and information to gather
Having these to hand usually makes the first conversation shorter and more useful.
- A simple plan marking the stopcock, meters, consumer unit and every external isolation point
- Dated photographs of each meter reading taken before work begins
- Account references for each supply and the contact details that go with them
- Any paperwork you hold for a private supply, storage tank, pump or private drainage arrangement
- Notes of what a managing party or supply provider told you about shared and communal supplies
- Written confirmation of who is responsible for usage during the work
- Contact details for whoever currently services each system at the property
Records
Decisions to record before work begins
Write these down in your own words, with the date, so everyone is working from the same version.
- Which existing supply points the work is expected to draw from
- Whose responsibility water and electricity used during the work will be
- How much notice you receive before any planned isolation, and by what route
- What the household does during periods without water or electricity
- Whether anything may be left running when nobody is present at the property
- Who tells affected neighbours before any shared supply is isolated
Professional review
Questions to discuss with qualified professionals
Bring these to the relevant qualified professional, supplier or authority. Requirements vary by project and location.
- What do you expect to draw water and electricity from while you are working here
- Is a temporary supply arrangement proposed, and who would be responsible for arranging it
- Which sockets and lights in and around the work area stop being usable once you start
- Where is water used for washing out and mixing intended to go
- How much notice will I get before the water or the electricity is isolated
- What happens to the smoke and other detectors while dust is being created
- Does anything at this property share a supply with a neighbouring one
- Who restores each supply at the end of the working period, and how would I know
Blind spots
Commonly overlooked items
- A stopcock that has not been turned for a long time and no longer moves when it is needed
- Outside taps and garden sockets fed from the house without anyone having realised
- Meter readings never recorded before work started, leaving no reference afterwards
- A meter needing a key or code running out while nobody is at the property
- Detectors taken down because of dust and never put back afterwards
- A neighbour left without water because a shared stopcock was turned off unannounced
- Equipment left running in an empty property with nobody there to notice
What this checklist does not do
- Everything here is about locating, recording and asking. Nothing in it comments on the condition, capacity or adequacy of any supply at your property.
- Nothing here should be read as permission to isolate, connect or alter a supply. That work belongs with suitably qualified people only.
- Anything involving gas, or a flue serving a fuel-burning appliance, goes to a suitably qualified and registered professional before it is disturbed.
- What may be discharged to a drain, and what applies to shared or communal supplies, is confirmed with the relevant authority and the managing party.
More preparation
Related checklists
Inspiration
Related Ideas Library pages
Design directions to explore once the preparation is done.
Go deeper
Related Build Design Hub guides
Explanatory planning guidance behind the decisions on this page.
Site Access & Logistics Checklists
Planning the practical side of having work happen at a property — access, deliveries, waste, neighbours, protection and the record made before work starts.
Browse all Access & Logistics checklists →