Checklists · Construction planning

Construction Window Schedule Preparation Checklist

Helps an owner walk the drawings opening by opening and write down how each window should sit, open and be finished, so the schedule that others work from is not built on assumptions.

Project stage:Brief and scopeDesign developmentBefore work begins

7 sections · 42 planning prompts · educational owner-side preparation

Prints in your browser only. Nothing is saved, sent or tracked.

The checklist

Work through the sections

Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.

More preparation

Related checklists

Door Schedule PreparationDoors are usually drawn as a swing and never described in words; this helps an owner set down handing, thresholds, linings and locking door by door.External Works PlanningGetting the drive, paths, levels, boundaries and planting into a construction brief early, instead of leaving everything outside the walls until the end of the job.Future Adaptability QuestionsFor owners of a new build or major construction project: how to name the changes a building may have to absorb later, and which adaptability questions belong with professionals.Neighbour and Context QuestionsIdentify who around your site a construction project touches, what condition record to make before anything starts, and which boundary questions belong with an adviser.Drawing Review PreparationOwners and designers read drawings differently. This checklist helps you prepare to review an issued set, test whether your brief survived it, and ask sharper questions.Utilities and Services QuestionsWater, drainage, power, fuel and telecoms all raise questions before a construction project is designed, and this records what you can see plus who asks the rest.Window Replacement QuestionsWhat to record about each existing window opening, how it is used and what surrounds it, before any conversation about replacement or refurbishment gets under way.Finish Schedule PreparationFinish schedules fail at the edges, so this checklist names the surfaces people forget, the matching to retained work and the sample handling that settles a decision.

Inspiration

Related Ideas Library pages

Design directions to explore once the preparation is done.

Go deeper

Related Build Design Hub guides

Explanatory planning guidance behind the decisions on this page.

Construction Project Planning Checklists

Owner-side preparation checklists for new-build and major construction projects — scope, information to gather and the questions to bring to qualified professionals.

Browse all Construction Planning checklists →