Commissioning Information Request Checklist
Helps an owner work out which parts of a project involved a setting up step, what information to request about how each system was left, and who to contact when it has to be revisited.
7 sections · 42 planning prompts · educational owner-side preparation
https://www.builddesignhub.com/checklists/handover-and-maintenance/commissioning-information-request · Build Design Hub — educational planning resource. Requirements vary by project and location.
Scope
What this checklist covers
The preparation ground these prompts walk through.
- Which parts of a project usually involve a setting up step
- Written evidence of how each system was left and who chose it
- Controls you will actually use and the ones you should leave alone
- Paperwork that comes out of a setting up visit and who issues it
- What a setting up visit assumes and what it does not include
- Revisiting the arrangement after later alterations
Audience
Who this checklist is for
- Owners taking over a property with newly installed systems
- Owners who will operate heating, hot water and ventilation themselves
- Owners handed a control panel and no explanation of what it does
- Owners preparing questions for the trades who set up their systems
Timing
When to use it
- Spotting the systems nobody has handed you any information about
- Requesting a record of how each system was set up and left
- Preparing questions for the people who set up heating and ventilation
- Keeping setting up information with the rest of the project record
- Knowing what to ask for again after a later alteration
Limits
When it is not sufficient
This is general planning preparation. These situations need a qualified professional, and often the relevant authority.
- Judging whether a system has been correctly or adequately set up
- Setting, adjusting or interpreting any value on an installed system
- Deciding what testing or paperwork an installation requires
- Diagnosing why a system is not performing as you expected
The checklist
Work through the sections
Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.
1.Working out what in this project was commissioned
Owners are frequently handed information about one system and nothing at all about three others. Listing what should have involved a setting up step is the way to see the gaps.
List every system installed or altered during the project and ask, for each one, whether it involved a setting up step once it was in place.
The list makes silence visible, which is often the only way to notice a system nobody has told you anything about.
Establish whether any system was set up in stages, since the person who attended first may hold information the last attendance never captured.
Staged work leaves information split between people who never spoke to each other about it.
Note where one system was set up on the assumption that another behaves in a particular way, such as controls shared between heating and hot water.
Interdependent settings are where later adjustments do the most damage, because changing one quietly undoes another.
Ask which items were set up by the manufacturer or their agent rather than by the installing trade, and record which applies to each item.
Who attended decides who you contact later, and it is rarely the person you have been speaking to throughout the project.
Write down anything left at a default state that is expected to be adjusted once you have lived with the property for a while.
Ask a qualified professional to make any adjustment described as expected rather than experimenting with the setting yourself.
Ask whether anything could not be set up fully at the time and what the reason was, recording both the item and the reason.
An item that could not be fully set up should be followed up with a qualified professional rather than left as it is.
2.The settings each system was left on
A system that drifts, or that somebody adjusts without saying, is impossible to restore if nobody wrote down where it started. That written starting point is the most useful thing to ask for.
Request a written record of the values each system was left set to, in a form you can compare against what the controls show later.
Without a starting record there is no way to tell whether a system has changed or whether your memory of it has.
Photograph every control panel and display as it was left, close enough to read and wide enough to show which unit it belongs to.
Photographs capture settings nobody thought to write down, including ones on equipment you did not know had settings.
Ask which settings you are able to change yourself and which should only be altered by a qualified professional, and write the two lists separately.
Where there is any doubt about whether a setting is yours to change, treat it as one for a qualified professional.
Note where a value on one item was chosen to suit another item, since altering one in isolation frequently undoes both at once.
Settings chosen as a pair look independent on the control panel and are not, which is how well meaning adjustments cause faults.
Ask what each recorded value is actually doing in plain terms, and write the explanation in your own words beside the value.
A number with no explanation beside it is no more useful than no record at all when somebody asks about it later.
Record who set each value, so that a later question can go to the person who made the choice rather than into a general enquiry.
General enquiries about a setting made a long time ago tend to be answered with a shrug or a fresh visit.
3.Understanding the controls you will actually use
Most installations leave the owner with more controls than they need and no indication of which one matters. Sorting that out at handover prevents a great deal of frustration.
Establish which control is the one you will use day to day, since installations often leave several that appear to do much the same thing.
Owners routinely adjust the wrong control for a long time, then conclude the system does not work.
Find out what happens to the settings if power is lost, and whether anything has to be entered again afterwards and by whom.
If settings have to be re-entered after a power loss, ask a qualified professional to do it rather than working from memory.
Note any control that is deliberately locked or restricted, and ask who holds the means to change it and how they are reached.
A locked control with nobody named against it becomes an obstacle the first time a genuine adjustment is needed.
Ask how to tell whether a system is running or waiting, since many controls look identical in both states and owners assume the worst.
A great many reported faults turn out to be equipment behaving exactly as intended in a state nobody explained.
Write down what the indicator lights and symbols on your equipment mean, since printed material often covers a whole family of models.
Generic literature describes indicators your unit does not have and omits the ones it does, which is why a written note from the installer matters.
Ask what the sensible response is to each fault indication, and whether any of them means stopping use of the system altogether.
A fault indication on heating, gas, electrical or ventilation equipment is a reason to contact a qualified professional, not to clear it repeatedly.
4.Paperwork that comes out of a commissioning visit
Different trades issue different documents, some to you and some to somebody else entirely. Knowing which is which decides whether you can answer a question about it later.
Ask what documents each trade issues after setting up a system, and record what you have been given against what you were told to expect.
Whether an installation of this kind produces any document at all is a question for the trade that carried it out and for the relevant local authority.
Check who holds the original of each document and whether you should receive a copy or the original itself, and note which you actually have.
Some documents are of little use as a copy, and discovering that when they are needed leaves no time to obtain the original.
Note which documents refer to a specific item by its serial marking, and check that the marking matches the item actually installed here.
Paperwork prepared in advance sometimes describes the item originally intended rather than the one that arrived on the day.
Ask which paperwork a future buyer, insurer or lender may ask about, and then confirm that directly with the organisation concerned.
Only the insurer, lender or their adviser can say what they require; treat any answer given on site as a prompt to ask them.
Where a document is described as following on, ask who is sending it and how it will arrive, rather than accepting a general assurance that it is in hand.
Documents without a named sender and a route are the ones that are still outstanding long after the project has closed.
Ask whether any document has to be sent to a third party by the installing trade rather than by you, and note who is doing it.
A document that sits between two parties who have each finished their part is a document that goes nowhere at all.
5.What a commissioning visit does not cover
Setting up work rests on assumptions about how a property will be used and what condition the rest of the installation is in. Those assumptions are worth hearing out loud.
Find out what the setting up work assumed about how the property will be used, since an assumption that no longer holds changes everything downstream of it.
Assumptions about occupancy and use are made silently and rarely revisited, even when the household changes completely.
Note anything that was set up in mild conditions and may behave differently once the weather turns, and ask what to look out for.
A system that appears settled in easy conditions is not the same as one that has been through a demanding spell.
Ask which parts of a system were left untouched because they were existing, since old and new sections often meet without either party owning the junction.
Where new work meets an existing installation, ask a qualified professional who is responsible for the junction rather than assuming.
Establish whether adjustment across the property was carried out as a whole or item by item, and record which of the two was done.
Item by item adjustment can leave a property that works room by room and not as a single installation.
Record what you were told about noise from the installation, since equipment that sounds different from what it replaced is a common surprise.
Noise complaints after handover are far easier to discuss when what was expected was written down beforehand.
Ask what would undo the setting up work, such as altering a control, changing a fitting or closing something off elsewhere in the property.
Before altering anything that might affect a system that has been set up, ask the qualified professional who set it up.
6.Coming back to this after later alterations
The information gathered now is mostly for a moment that has not happened yet, when something in the property changes and a system has to be revisited.
Write down which alterations would mean asking for a system to be set up again, and keep that note at the front of the record.
The trigger list is the part a future owner or trade will read first, and it is almost never written down.
Ask whether adding, removing or moving a single item elsewhere in the property affects how the system as a whole was balanced.
Ask a qualified professional before altering anything connected to a system that has been balanced across the property.
Note who to contact for a repeat visit and whether that is the installing trade, the manufacturer agent or somebody else entirely.
The right contact for a repeat visit is often different from the contact for the original work, and nobody volunteers this.
Ask what information a different trade would need in order to work on this system in future without starting from nothing.
A system nobody can pick up cheaply becomes a system nobody wants to touch, which limits your options later.
Record where the earlier settings are stored so that a later attendance can see what has changed rather than guessing at it.
History is what turns a service visit into a short conversation instead of a long investigation.
Ask whether anything is expected to drift in normal use and should simply be looked at again once you have lived with the property.
Anything described as expected to drift should be revisited by a qualified professional rather than corrected by the owner.
7.Making the commissioning record usable later
Information that cannot be found, opened or understood is the same as information that was never issued. A small amount of organisation now protects all of it.
Keep the setting up information with the manuals for the same items, since the two are much less useful apart and are usually filed separately.
Manuals describe what a device can do and the setting record describes what yours was told to do; neither answers a question alone.
Write a plain summary in your own words at the front of each system record, so that somebody unfamiliar can find their way into it.
Technical records are unreadable to the person most likely to need them, which is usually the next owner of the property.
Note where each item the record refers to physically sits, since a record naming equipment without saying where it is wastes the next visit.
A surprising amount of a service visit is spent finding the equipment rather than working on it.
Check that you can actually open every file you have been sent, and ask for a plain readable version of anything that needs a particular program to view.
Files that need particular software become unreadable long before the equipment they describe stops working.
Record which parts of what you were told were given verbally and never confirmed in writing, and keep that list with the record.
Marking the verbal material as verbal stops it being treated later as though it came from a document.
Keep a note of the questions you asked and the answers you were given, since the answers age considerably better than your memory of them.
Your own question log is often the only place a particular explanation exists anywhere in the project record.
Preparation
Documents and information to gather
Having these to hand usually makes the first conversation shorter and more useful.
- The list of systems installed or altered during the project
- Manuals and product information issued for each installed item
- Any written record of settings supplied by the trades involved
- Photographs you took of control panels and displays at handover
- The name of whoever attended for each system and how they are reached
- Your own notes of what you were told verbally during the works
Records
Decisions to record before work begins
Write these down in your own words, with the date, so everyone is working from the same version.
- Which controls you will use day to day and which you will leave alone
- Who you contact for each system when something needs revisiting
- What you will do before altering anything connected to a balanced system
- Where the setting up record is stored and who else can find it
- What you will do about any system nobody has given you information for
Professional review
Questions to discuss with qualified professionals
Bring these to the relevant qualified professional, supplier or authority. Requirements vary by project and location.
- Which systems here involved a setting up step, and who carried out each one?
- What was this system left set to, and what is each of those settings doing?
- Which of these settings can I change myself and which should I not touch?
- What documents come out of this visit and who issues each of them?
- What did the setting up work assume about how this property is used?
- What should I do if this fault indication appears on the control?
- Which later alterations would mean asking for this to be set up again?
- What would a different trade need in order to work on this system later?
Blind spots
Commonly overlooked items
- The junction where a new system meets an existing one that nobody adjusted
- Settings recorded nowhere, leaving no way to see what has since changed
- Serial markings on paperwork that do not match the item actually installed
- Information given verbally on site and never confirmed in writing
- Controls left locked with nobody named as holding the means to unlock them
- Whole property balancing undone by a single later change made elsewhere
What this checklist does not do
- Nothing here establishes whether a system was correctly or adequately set up, which is a matter for qualified professionals.
- Do not adjust settings on heating, hot water, ventilation or electrical equipment you have not been shown how to operate.
- A record of how a system was left is not a statement that the setting was right; only the qualified professional who set it can speak to that.
- A fault indication is a reason to contact a qualified professional rather than something to clear repeatedly and keep using.
More preparation
Related checklists
Inspiration
Related Ideas Library pages
Design directions to explore once the preparation is done.
Go deeper
Related Build Design Hub guides
Explanatory planning guidance behind the decisions on this page.
Handover & Maintenance Checklists
Handover preparation checklists — documents to request, information to record, and maintenance questions to ask before a project is considered finished.
Browse all Handover & Maintenance checklists →