Commissioning Information Request Checklist

Helps an owner work out which parts of a project involved a setting up step, what information to request about how each system was left, and who to contact when it has to be revisited.

Project stage:During the projectHandoverAfter completion

7 sections · 42 planning prompts · educational owner-side preparation

Prints in your browser only. Nothing is saved, sent or tracked.

The checklist

Work through the sections

Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.

More preparation

Related checklists

Appliance Information CaptureWhat to record about installed appliances and systems while covers are off and installers are present, from identification details to isolation points.Contact Information RecordCapturing who actually did what on your property, how each of them is reached, and which routes exist independently of the contractor, while everybody is still around.O and M Manual RequestHow to ask for an operating and maintenance file that is actually usable: what belongs in it, how each installed item is identified, and how missing material gets chased.Handover Document RequestA preparation checklist for owners assembling the list of drawings, records and contact details worth requesting before a project team disperses.As-Built Drawing RequestWhat to ask for when the drawings no longer describe the building: the changes made on site, the routes now concealed, and how a record set is checked and stored.Spare Materials RecordWorking out which leftover material is worth keeping, labelling it so it stays identifiable, storing it without ruining it, and recording what obtaining more would involve.As-Built Information RequestPrepare a clear request for information about what was actually built, asked while the people who know are still involved and framed so the answers stay usable afterwards.Information Between TradesOwner-side prompts for the joins between trades, where drawings, concealed services, setting-out marks and leftover materials most often stop being passed on.

Inspiration

Related Ideas Library pages

Design directions to explore once the preparation is done.

Go deeper

Related Build Design Hub guides

Explanatory planning guidance behind the decisions on this page.

Handover & Maintenance Checklists

Handover preparation checklists — documents to request, information to record, and maintenance questions to ask before a project is considered finished.

Browse all Handover & Maintenance checklists →