Checklists · Handover

Handover & Maintenance Checklists

Handover is the last chance to ask easy questions cheaply. These checklists cover the documents worth requesting, the details worth writing down while people are still on site, and the upkeep questions that decide how the work ages.

Nothing here is an inspection, a sign-off, or a judgement that work is complete, safe or compliant. Those determinations belong to qualified professionals and, where applicable, the relevant authority.

20 checklists in this category

What this area covers

Planning topics in this category

Each checklist prepares one specific conversation or decision point. None of them determines compliance, suitability or cost.

  • Documents and information to request
  • Details to record while access is easy
  • Maintenance questions to ask
  • Follow-up items to schedule yourself

Checklists in this category

Browse the checklists

Every checklist is educational owner-side preparation: decisions to weigh, documents to gather and questions to bring to qualified professionals.

Handover Document RequestA preparation checklist for owners assembling the list of drawings, records and contact details worth requesting before a project team disperses.Handover Walkthrough QuestionsPreparation for the final walk around a finished project: who to invite, what conditions to ask for, what to look at and how to record what you notice.Maintenance Before HandoverUpkeep questions worth asking while the people who did the work are still available, covering finishes, moving parts, access, spares and who to contact.Warranty and AftercareQuestions to prepare about who holds which cover, what registration falls to you, how a problem is reported and what happens if a party stops trading.First-Year MaintenanceHow to plan care through the early life of finished work: expected movement, the first cold spell, drying out, outdoor surfaces and what is worth watching.Appliance Information CaptureWhat to record about installed appliances and systems while covers are off and installers are present, from identification details to isolation points.Handover Defect ConversationPreparing to raise unfinished or unsatisfactory items at handover: describing what is visible, separating the categories and agreeing how each item is handled.Maintenance Record SetupSetting up a property record that outlives the project: what to keep, how to name and store it, how to keep it current and how to pass it on.Construction Handover QuestionsOwner-side preparation for the end of construction work, setting out what to be shown, what to ask and what to write down while the people who built it are still on site.Commissioning InformationQuestions to put to the trades who set up heating, hot water and ventilation, covering what was commissioned, which settings were recorded and who revisits them later.O and M Manual RequestHow to ask for an operating and maintenance file that is actually usable: what belongs in it, how each installed item is identified, and how missing material gets chased.As-Built Drawing RequestWhat to ask for when the drawings no longer describe the building: the changes made on site, the routes now concealed, and how a record set is checked and stored.Meter and Service RecordWhat to record about meters, supplies and drainage at handover: readings, references, what each connection now serves and what changed while the work was going on.Key and Access RecordKeys, codes and devices at the end of a project: counting what you have been given, working out who else can still get in, and deciding what to do about it.Finish and Touch-Up RecordA record of what every surface was actually finished in, where touch-ups were made, and what matching any of it would involve once the decorators have left.Post-Completion ObservationA way of noticing and recording how finished work behaves once the property is back in use, so that what you saw, where, and under what conditions does not get lost.Seasonal Check PlanningWhich parts of this particular property are worth looking at as the weather turns, who carries out each look, and what should not be attempted from a household ladder.External Maintenance PlanningHow the outside of the building will be looked after over its life: what each material asks for, how it can actually be reached, and which parts are not entirely yours.Spare Materials RecordWorking out which leftover material is worth keeping, labelling it so it stays identifiable, storing it without ruining it, and recording what obtaining more would involve.Contact Information RecordCapturing who actually did what on your property, how each of them is reached, and which routes exist independently of the contractor, while everybody is still around.