Skip to main content
HELPERG Ecosystem
Build Design HubBuild Design Hub

Checklists · Handover

External Maintenance Planning Checklist

Helps an owner set out what the outside of a building will need over its life, work out whether each part can be reached at all, and prepare the questions about coatings, rainwater, boundaries and shared elements that belong with a qualified professional.

Project stage:HandoverAfter completion

7 sections · 42 planning prompts · educational owner-side preparation

Prints in your browser only. Nothing is saved, sent or tracked.

The checklist

Work through the sections

Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.

More preparation

Related checklists

O and M Manual RequestHow to ask for an operating and maintenance file that is actually usable: what belongs in it, how each installed item is identified, and how missing material gets chased.Maintenance Before HandoverUpkeep questions worth asking while the people who did the work are still available, covering finishes, moving parts, access, spares and who to contact.First-Year MaintenanceHow to plan care through the early life of finished work: expected movement, the first cold spell, drying out, outdoor surfaces and what is worth watching.Maintenance Record SetupSetting up a property record that outlives the project: what to keep, how to name and store it, how to keep it current and how to pass it on.Meter and Service RecordWhat to record about meters, supplies and drainage at handover: readings, references, what each connection now serves and what changed while the work was going on.Key and Access RecordKeys, codes and devices at the end of a project: counting what you have been given, working out who else can still get in, and deciding what to do about it.Construction Handover QuestionsOwner-side preparation for the end of construction work, setting out what to be shown, what to ask and what to write down while the people who built it are still on site.Spare Materials RecordWorking out which leftover material is worth keeping, labelling it so it stays identifiable, storing it without ruining it, and recording what obtaining more would involve.

Inspiration

Related Ideas Library pages

Design directions to explore once the preparation is done.

Go deeper

Related Build Design Hub guides

Explanatory planning guidance behind the decisions on this page.

Handover & Maintenance Checklists

Handover preparation checklists — documents to request, information to record, and maintenance questions to ask before a project is considered finished.

Browse all Handover & Maintenance checklists →