Checklists · Handover

Handover Key and Access Record Checklist

Helps an owner record every key, code and access arrangement at the end of a project, work out who could still enter the property, and decide what to do where access cannot be accounted for.

Project stage:During the projectHandoverAfter completion

7 sections · 42 planning prompts · educational owner-side preparation

Prints in your browser only. Nothing is saved, sent or tracked.

The checklist

Work through the sections

Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.

More preparation

Related checklists

Handover Walkthrough QuestionsPreparation for the final walk around a finished project: who to invite, what conditions to ask for, what to look at and how to record what you notice.Finish and Touch-Up RecordA record of what every surface was actually finished in, where touch-ups were made, and what matching any of it would involve once the decorators have left.Handover Document RequestA preparation checklist for owners assembling the list of drawings, records and contact details worth requesting before a project team disperses.Contact Information RecordCapturing who actually did what on your property, how each of them is reached, and which routes exist independently of the contractor, while everybody is still around.Handover Defect ConversationPreparing to raise unfinished or unsatisfactory items at handover: describing what is visible, separating the categories and agreeing how each item is handled.Spare Materials RecordWorking out which leftover material is worth keeping, labelling it so it stays identifiable, storing it without ruining it, and recording what obtaining more would involve.Construction Handover QuestionsOwner-side preparation for the end of construction work, setting out what to be shown, what to ask and what to write down while the people who built it are still on site.Meter and Service RecordWhat to record about meters, supplies and drainage at handover: readings, references, what each connection now serves and what changed while the work was going on.

Inspiration

Related Ideas Library pages

Design directions to explore once the preparation is done.

Go deeper

Related Build Design Hub guides

Explanatory planning guidance behind the decisions on this page.

Handover & Maintenance Checklists

Handover preparation checklists — documents to request, information to record, and maintenance questions to ask before a project is considered finished.

Browse all Handover & Maintenance checklists →