Checklists · Documentation
Document Handover Index Preparation Checklist
Helps an owner build an index of the documents, records and practical knowledge expected at the end of a project, chase them while the parties are still available, and store the set so it survives.
8 sections · 43 planning prompts · educational owner-side preparation
https://www.builddesignhub.com/checklists/project-documentation-and-changes/document-handover-index-preparation · Build Design Hub — educational planning resource. Requirements vary by project and location.
Scope
What this checklist covers
The preparation ground these prompts walk through.
- Deciding who the handover set is for and what it has to answer quickly
- Listing what each party who worked on the property should be able to hand over
- Chasing manufacturer paperwork and identification details for installed items
- Capturing photographs and records that only exist while the work is open
- Writing down the practical knowledge that lives only in somebody's memory
- Storing the set so it can still be found and read long after everybody has left
Audience
Who this checklist is for
- Owners approaching the end of a project with no idea what paperwork to expect
- People who have moved into finished work and cannot find out who fitted what
- Owners who will let, sell or extend the property later and want a usable record
- Anyone who has had to guess which valve or switch controls what
Timing
When to use it
- Building a list of expected documents before the work is anywhere near finished
- Chasing paperwork from trades while they are still coming to the property
- Recording where things are, how they are isolated and who fitted them
- Checking that the documents you receive are legible, addressed and complete
- Organising the finished set so somebody else could use it without you
Limits
When it is not sufficient
This is general planning preparation. These situations need a qualified professional, and often the relevant authority.
- Deciding whether the documents you hold satisfy any local requirement, which must be confirmed with the relevant authority
- Judging whether a document issued by a qualified party is correct or adequate
- Deciding whether missing paperwork affects the completion position, which is for your own legal adviser
- Replacing records that the appointed professionals are already assembling on your behalf
The checklist
Work through the sections
Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.
1.Deciding what the handover set has to serve
A set assembled for your own use looks quite different from one prepared for whoever holds the property next. Choose before you start listing.
Decide who the set is for, since paperwork gathered for your own convenience is organised differently from a set intended to be handed on with the property.
A set for yourself can rely on what you remember; a set for somebody else has to work without you standing beside it.
Write down what you would want to find in a hurry, such as where a stopcock is or who fitted a particular item, and build the index around those questions first.
Handover sets are used at the worst moments, and an index organised by urgency is worth more than one organised by document type.
Ask each appointed party what they normally hand over at the end of work of this kind, and write it down rather than assuming anything is standard.
What is customary varies considerably between trades and practices, and asking early is easy while asking late may be too late.
Decide whether the index lists documents only, or also records where a physical thing lives, such as a key, a remote control or a box of spare tiles.
The physical leftovers are exactly what gets lost first, and a line in the index is usually enough to keep them findable.
Start the index while most of its entries are still empty, since a list of what should exist is useful precisely because it shows what does not yet.
An index begun at the end is written from what arrived, which quietly makes it impossible to notice what never did.
2.What each party who worked here should provide
Paperwork follows the people who did the work. List the people first, and the documents become much easier to name.
List every party who has worked on the property and write beside each one what they should be able to hand over at the end.
Working from a list of people rather than a list of documents catches the trades whose paperwork nobody thinks to expect.
Ask whether one party is collecting the paperwork from the trades, or whether each of them is expected to send theirs to you separately.
Both arrangements work, but neither happens by itself, and the assumption that somebody is collecting is where most sets fall apart.
Note where a trade worked through somebody else rather than directly for you, since their paperwork usually reaches you through that party if at all.
Documents from a subcontracted trade are the ones most often missing, because there are two chances for the chain to break.
Ask what happens to the paperwork of a party who finishes or leaves the project before the end of the work.
Where a party has left, ask the appointed professionals how their records are obtained; do not attempt to reconstruct documents yourself.
Write down the trading name and contact route for each party exactly as it appears on their own paperwork, not as you have saved it in your phone.
The name on an invoice, the name on a van and the name you know somebody by are frequently three different things.
Ask which documents are issued once and cannot readily be produced again later, and chase those while the work is still live.
Some records exist only at the moment they are made, and asking for them afterwards produces sympathy rather than paperwork.
3.Paperwork that arrives with the things installed
The most useful documents in a handover set often arrive in a cardboard box and leave in a skip before anybody has looked at them.
List the items installed that came with instructions, and ask who has the paper copies that arrived in the packaging with them.
Instruction booklets are thrown out with the packaging by whoever unpacks the item, and they are the hardest thing to recover afterwards.
Photograph the identification details printed on each installed item while they are still reachable, and note which room each photograph belongs to.
The plate on the back of an appliance becomes unreachable the moment it is pushed into place, and it is the first thing anybody servicing it asks for.
Ask which installed items are expected to be registered with their manufacturer, who is doing it and what information they need from you.
Registration requirements come from the manufacturer; ask them or the qualified installer rather than assuming what applies.
Ask for the care and cleaning information for each finish, since using an unsuitable product on a new surface is one of the earliest avoidable problems.
Cleaning and care requirements come from the manufacturer of the finish; ask for their written instructions rather than relying on general advice.
Note which items have parts that are meant to be replaced from time to time, such as filters or seals, and ask where the information about them is written down.
Consumable parts are described in the booklet nobody kept, and an item quietly performing badly is the usual first sign.
Ask whether spare materials are being left, what they are and where they are stored, and record all three in the index.
Spare tiles and offcuts are left in a loft or under a stair and forgotten, which is a shame when a repair is needed later.
4.Records that only exist while the work is open
Once a surface closes, some information becomes unavailable at any effort. This is the part of the index that cannot wait until the end.
Ask for photographs of services and structure taken before they were covered, and record which room and which surface each set of images shows.
A photograph of an open floor or wall is worth more than any drawing to anybody who later has to work near a hidden run.
Note whether anybody is recording the positions of pipes and cables as the work proceeds, and ask how that record is expected to reach you.
Ask the qualified installers how the positions of concealed pipes and cables are being recorded, and what limits they would put on that record.
Ask what record is being kept of anything found and dealt with during the work, since those discoveries rarely appear in any final document.
The most interesting facts about an older property are learned during the work and forgotten soon afterwards unless somebody wrote them down.
Take your own photographs of each area before it is closed up, and note the date and the room with each set as you go.
Owner photographs are unglamorous and frequently the only surviving record, because they are the only ones taken without being asked.
Ask for the records of any tests or commissioning carried out, and find out who holds the originals of each.
Test and commissioning records are issued by the qualified people who carried them out; ask them for the documents rather than describing results yourself.
Note which settings or readings were entered into equipment during commissioning, and ask where those are written down for future reference.
Settings live in the equipment until somebody resets it, at which point nobody can remember what it was set to and why.
5.Checking that a document will still be usable
A document that cannot be read, or that names no property and no issuer, occupies space in the set without doing any work.
Check that each document states which property and which part of the work it relates to, since a document without an address is very hard to use later.
Documents get separated from their context, and the ones that carry no address are the first to become unusable.
Note where documents have arrived as photographs of paper, and ask for a legible copy wherever the exact wording matters.
A photograph taken at an angle in poor light is readable at the time and unreadable when it matters, which is usually much later on.
Check that each document names the party who issued it and gives a route by which they could be reached again.
The value of most handover documents is that they lead back to a person, and a document without a name leads nowhere.
Ask what a document actually covers where its title appears broader than the work that was carried out.
What a document covers is a matter for the qualified party who issued it; ask them rather than reading a scope into the title.
Note where a document refers to a drawing, schedule or record, and check that the referenced item is actually in your set.
Referenced attachments are the most commonly missing part of a handover set, because they were separate files from the start.
6.Knowledge that lives only in somebody's memory
The most practically useful things about finished work are usually said aloud once, at the very end, to whoever happens to be standing there.
Walk the property with whoever carried out the work and write down everything they tell you that appears in no document.
This conversation happens on almost every project and is almost never recorded, which is why the same questions get asked again long afterwards.
Ask where the isolation points are for water, electricity and any other supply, and record exactly how each one is reached and what it serves.
Ask the qualified installers to show you isolation points and explain their use; do not work them out from the appearance of the pipework.
Note which switches, controls and valves do what, since unlabelled controls become guesswork surprisingly quickly once the people who fitted them have gone.
A control nobody can identify is eventually left alone entirely, which is how systems end up running in a way nobody intended.
Ask what was done differently from the drawings and why, and record the answer while the people who know are still coming to the property.
Differences from the drawings are usually sensible and always forgotten, and they are what confuses the next person to work here.
Write down anything you were told to keep an eye on, along with who told you and what they said to look for.
Advice of this kind is given casually and remembered vaguely, and the vague version is not enough to act on later.
7.Storing the set so it survives
A handover set is only useful if somebody can find it long afterwards, possibly somebody who is not you.
Decide where the set lives and keep a copy somewhere that does not depend on a single device, account or subscription remaining active.
Handover sets are consulted rarely and at long intervals, which is exactly the pattern that outlives most storage arrangements.
Name files so that the property, the party and the subject can be understood without opening anything.
A folder of files named by scanner default is functionally the same as a folder of unlabelled paper.
Keep the paper originals of anything that exists only on paper, and note in the index where those originals are being kept.
Scanning is not the same as keeping, and the original is occasionally the thing somebody later needs to see.
Note which documents somebody else holds the only copy of, and ask what would happen to that copy if they were no longer trading.
Where a record is held only by a third party, ask them directly how a copy can be obtained rather than assuming it will remain available.
Decide who else in the household knows where the set is kept and how to reach it, and make sure that is more than one person.
A set only one person can find is unavailable in exactly the circumstances where it is most needed.
8.Chasing the set before everybody leaves
Every document is easier to obtain while people are still coming to the property. After that, it becomes a favour.
Send your index to each party while the work is still going on, so the list of what you expect is not a surprise at the very end.
Nobody minds producing paperwork they knew was expected, and most of the difficulty comes from asking for it without notice.
Ask which documents cannot be issued until something else has happened, and find out what that something is and who does it.
Where a document depends on a check by a qualified party or an authority, ask them what has to happen and confirm the position locally.
Note which items are still outstanding at the point the work is treated as finished, and record that list in writing rather than leaving it as a conversation.
Whether outstanding documents affect the completion position is a matter for your own legal adviser and the terms of your agreement.
Ask who to contact about a missing document once everybody has left the property, and record that route while somebody is still there to give it.
Contact routes decay quickly, and the one you were given at the end is usually the last one that worked.
Review the index once more after the last trade has gone, since gaps are much easier to fill while the work is still fresh in everybody's memory.
The gap you notice soon after completion can usually still be filled; the one you notice much later usually cannot.
Preparation
Documents and information to gather
Having these to hand usually makes the first conversation shorter and more useful.
- Your own list of every party who has worked on the property, with their trading names
- Instruction booklets and paperwork that arrived in the packaging with installed items
- Photographs of services and structure taken before surfaces were closed up
- Records issued by qualified parties for any tests or commissioning carried out
- Notes of the walk round in which somebody explained how things work and where they isolate
- Any drawing set the appointed professionals intend to represent the finished work
- Details of where spare materials, keys, remote controls and manuals have been left
Records
Decisions to record before work begins
Write these down in your own words, with the date, so everyone is working from the same version.
- Whether the set is being assembled for your own use or to be handed on with the property
- Whether one party is collecting trade paperwork or each party sends theirs to you
- Where the set is kept, in what form, and who else in the household can find it
- Which items you photographed yourself and where those photographs are stored
- Which documents were still outstanding at the point the work was treated as finished
Professional review
Questions to discuss with qualified professionals
Bring these to the relevant qualified professional, supplier or authority. Requirements vary by project and location.
- What do you normally hand over at the end of work of this kind?
- Is anybody collecting paperwork from the trades, or does each of them send theirs to me?
- Which records can only be produced while the work is open, and when do you need to make them?
- Where are the isolation points, and could you show me each of them before you finish?
- Which installed items need registering, and what information do you need from me?
- Which documents cannot be issued until something else has happened, and what is that?
- What was done differently from the drawings, and where is that recorded?
- Who should I contact about a missing document once the work has finished?
Blind spots
Commonly overlooked items
- Instruction booklets thrown out with the packaging at the moment an item was unpacked
- Identification plates that become unreachable once an item is pushed into position
- Photographs of open walls and floors, which nobody takes unless somebody asks
- Paperwork from a trade that worked through somebody else rather than directly for you
- Settings entered into equipment during commissioning and written down nowhere
- The only copy of a record being held by a party you may not be able to reach later
What this checklist does not do
- An index records what you expect and what you have received; it says nothing about whether any document is correct, adequate or sufficient for any purpose.
- Whether the documents you hold satisfy a local requirement must be confirmed with the relevant authority and your appointed professionals, never inferred from a complete-looking set.
- Records of concealed services are indicative only, and anybody working on the property later must still establish positions safely before disturbing anything.
- Missing paperwork at the end of a project may or may not matter under the terms you agreed, and only your own legal adviser can tell you which.
More preparation
Related checklists
Inspiration
Related Ideas Library pages
Design directions to explore once the preparation is done.
Go deeper
Related Build Design Hub guides
Explanatory planning guidance behind the decisions on this page.
Project Documentation & Changes Checklists
Owner-side checklists for drawings, specifications, instructions, variations and records — keeping a project legible when something changes.
Browse all Documentation & Changes checklists →