Checklists · Documentation

Project Documentation & Changes Checklists

Projects go wrong quietly when nobody can say which drawing was current, who approved a change, or what was agreed verbally on site. These checklists cover the registers, records and written habits that keep an owner informed.

This is owner-side record-keeping, not contract administration. Nothing here interprets a contract, determines responsibility, or values work. Contract questions belong with your own suitably qualified adviser.

22 checklists in this category

What this area covers

Planning topics in this category

Each checklist prepares one specific conversation or decision point. None of them determines compliance, suitability or cost.

  • Drawing registers and version clarity
  • Written instructions, approvals and variations
  • Photographic and site records to keep
  • Questions to ask when scope changes

Checklists in this category

Browse the checklists

Every checklist is educational owner-side preparation: decisions to weigh, documents to gather and questions to bring to qualified professionals.

Drawing Register PreparationPrepare an owner-side register of every drawing on your project, so you can tell which sheet, which issue and whose copy any conversation refers to.Specification ReviewWork through the written specification for your project as a non-technical reader, so you can tell what each clause asks of whom and what it quietly leaves open.Scope of Works ReviewRead a scope of works document as the owner it affects, working out what is included, what stops at the edge of it and what nobody has written down at all.Variation Record PreparationSet up a way of recording every change to the agreed work, so each one has an origin, a plain description and a written trail rather than living in somebody's memory.Instruction and Approval RecordWork out who may instruct what on your project, how anything said on site becomes a written record, and what you are actually being asked to accept when approval is sought.Meeting Minutes PreparationPrepare for project meetings and record them properly, so that what was decided, what was only discussed and who owes what are all legible afterwards.Payment Stage ConversationPrepare the questions to ask about how payment stages are defined and evidenced on your project, and about who checks what before you are asked to respond.Document Version ControlPlan how project documents, messages and photographs are named, stored and superseded, so the record survives a busy project and can be read by somebody else later.Photographic RecordPlan an owner photographic record that stays usable: what to capture before anything is disturbed, what to catch before it is covered up, and how to keep each image identifiable.Sample and Approval RecordKeep a clear owner record of every sample seen and every choice settled, so that what you accepted, in which light and for which location, is never in doubt later.Defect Record PreparationBuild a record of things you have noticed that actually works: one observation per entry, pinned to one place, dated, and followed through to an answer somebody has written down.Correspondence RecordDecide how project messages are sent, captured and found again, so decisions do not end up buried in a chat thread nobody can produce when they are questioned.Delivery and Material RecordLog what arrived at the property, what markings it carried and where it went, so questions about supply can later be answered from paperwork rather than from memory.Subcontractor InformationRecord how the work is divided between trades and who answers for each part, so an owner knows where a question goes without ever assessing anybody credentials.Site Diary PreparationSet up an owner diary you will actually keep: short dated entries recording what was happening, what stopped, what you were told and what you could not see for yourself.As-Built Information RequestPrepare a clear request for information about what was actually built, asked while the people who know are still involved and framed so the answers stay usable afterwards.Scope Gap Question LogKeep an owner-side log of work that no document has clearly given to anybody, so each gap becomes a written question instead of an argument once the work is under way.Assumption and Exclusion ReviewWork through the assumptions and exclusions buried in the notes of a scope document, so you know what each one leaves sitting with you before anybody starts work.Provisional Item ConversationGet ready for the conversation about the parts of your project that are still undecided, so each provisional item is settled deliberately rather than by whoever is waiting on it.Change Impact QuestionsQuestions to ask before agreeing to swap one specified item for another, so the knock-on effects surface while the change can still be reconsidered.Document Handover IndexDraw up the list of paperwork you expect to be holding when the work finishes, while everybody is still on site and the documents can still be produced.Decision Audit RecordKeep a running owner-side record of what was decided, by whom and on what basis, so a question raised long afterwards can be answered from a note rather than from memory.

Go deeper

Related Build Design Hub guides

Explanatory guidance behind the decisions these checklists prepare you for.