Skip to main content
HELPERG Ecosystem
Build Design HubBuild Design Hub

Checklists · Renovation planning

Unoccupied Property During Works Planning Checklist

To cover the owner's own obligations when a property is left unoccupied during works, which sit with the household's insurer, lender and utility accounts rather than with whoever is carrying out the work.

Project stage:Before work beginsDuring the project

7 sections · 42 planning prompts · educational owner-side preparation

Prints in your browser only. Nothing is saved, sent or tracked.

The checklist

Work through the sections

Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.

5.Post, appearance and how it looks from the street

An empty property announces itself, and a few arrangements make it look attended rather than abandoned.

More preparation

Related checklists

Existing Conditions Record →How to build an owner-made record of a property before renovation, covering photographs, rough sketches, services, boundaries and the way the building behaves over time.Period Property Questions →What to ask before renovating an older property, covering unknown fabric, earlier alterations, features worth retaining, services added over time and matching materials.Damp Observation Record →A way to record where marks, smells and cold surfaces appear in an existing property, so a qualified professional starts from located evidence rather than from memory.Heating Upgrade Questions →How an existing heating and hot water arrangement actually performs, where its equipment and services sit, and what to write down before any upgrade conversation begins.Older Property Materials →Older buildings rarely match their outward appearance, so this checklist helps an owner record the existing fabric and prepare material questions before replacements are chosen.What-to-Keep Decisions →Decide deliberately what stays, what is taken out to return later and what leaves, using condition you can observe and questions for qualified professionals.Apartment Building Questions →Flat and apartment owners face a second set of questions: who has to be asked, which services are shared, how the common parts are used and what is visible outside.Off-Mains Services Questions →Preparing a project where water, power, drainage, fuel or telecoms do not arrive from a public network: what each arrangement needs in land and plant, and what the owner is left running.

Inspiration

Related Ideas Library pages

Design directions to explore once the preparation is done.

Go deeper

Related Build Design Hub guides

Explanatory planning guidance behind the decisions on this page.

Renovation Project Planning Checklists

Preparation checklists for renovation projects — scope, sequencing conversations, existing conditions to document and decisions to agree before work starts.

Browse all Renovation Planning checklists →