Extension Connection to Existing House Questions Checklist
Helps you describe the wall, floor and roof that an extension would join onto, record what forming that connection would disturb inside an occupied house, and turn level, movement and weather questions at the seam into things to ask a qualified professional.
7 sections · 42 planning prompts · educational owner-side preparation
https://www.builddesignhub.com/checklists/additions-and-conversions-planning/extension-connection-to-existing-house-questions · Build Design Hub — educational planning resource. Requirements vary by project and location.
Scope
What this checklist covers
The preparation ground these prompts walk through.
- Choosing which part of the existing wall the new space opens into
- Floor levels, thresholds and steps on either side of the join
- Weathering, gutters and fittings where new work meets the old wall
- The old outside wall once it has become an internal one
- Movement, cracking and weather along the seam between old and new
- Staying in the house while the opening is actually formed
Audience
Who this checklist is for
- Owners planning an extension onto a house they live in
- People unsure how much of the existing wall would come out
- Households who have to stay put while the connection is formed
- Owners whose extension plan stops at the edge of the new room
Timing
When to use it
- Owners deciding how open the link between old and new should be
- Households recording what is fixed to the wall that would be opened
- Owners weighing a step at the join against altering floor levels
- Anyone gathering junction questions before a designer visits
- People who want the disruption of the break-through described early
Limits
When it is not sufficient
This is general planning preparation. These situations need a qualified professional, and often the relevant authority.
- Establishing whether any part of the existing wall can be opened at all
- Deciding what support an opening between old and new would need
- Settling how a new roof should be weathered against an existing wall
- Replacing site-specific advice on movement, settlement or damp
The checklist
Work through the sections
Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.
1.Choosing where the new space breaks into the old
The size and position of the opening between old and new shapes both halves of the plan more than the footprint does. These prompts get that choice described before anyone draws it.
Mark on a rough plan which part of the existing wall you imagine opening, and note what currently stands against that wall inside the room.
Owners usually describe the new room and leave the opening vague, yet the opening is what decides how the existing room ends up feeling.
Write down whether you picture one wide opening, two separate ones or an ordinary doorway, and what each of those would do to the room you already have.
These are genuinely different projects for the existing house, and stating a preference early saves a design conversation running in circles.
Note what the existing room would lose if that wall came out, including the wall a sofa backs onto, a radiator hangs from or a television sits against.
A room can gain light and lose every usable wall at the same time, and that trade is easier to weigh before it is drawn.
Consider whether you want the old room to keep its own identity or read as part of one continuous space, and record which of those you are asking for.
Almost every later decision about the join follows from this one, including finishes, ceiling lines and where any structure shows.
Ask what would be needed above an opening of the sort you are describing, and treat the answer as belonging entirely to a qualified professional.
Owners often assume an opening can simply be made wider, when the answer changes both the design and the way the work is sequenced.
Whether an existing wall can be opened, and what would carry the load above it, must be established by a suitably qualified structural professional.
Photograph the wall from inside the room and again from outside, so the same piece of building is recorded from both faces before anything is proposed.
The inside and outside of that wall are rarely looked at together, and a professional will want to read both at once.
2.Floor levels either side of the connection
New and existing floors are rarely built the same way, and where they meet is one of the most common sources of surprise. These prompts record what you can already observe.
Note whether the existing floor appears solid or suspended, and how you can tell, whether from air bricks outside, a hatch, or the way it sounds underfoot.
The existing floor construction affects how the two floors can meet, and owners can usually gather useful evidence without any opening up.
Note roughly how far the inside floor sits above the ground outside at the point where the extension would join, and photograph that difference.
This single observation drives thresholds, steps and drainage at the junction, and it is easy to record before anyone visits.
Decide whether a step between old and new would be acceptable, and write down who in the household would find a change of level difficult.
A step is sometimes the calmer answer and sometimes unacceptable, and it is far better decided by the household than assumed by a drawing.
Write down what floor finish runs through the existing room, and whether you expect it to continue into the new space or deliberately stop at the join.
Continuing a finish through an opening is a specific instruction, and matching an existing floor is not always possible.
Ask how the two floor constructions would meet at the junction, since a new floor and an existing one are usually built up in different ways.
This is where an unexpected step appears, and asking about it early gives the design room to deal with it.
How two floor constructions meet, and what that means for damp and insulation, is for a qualified professional to establish on site.
Note anything you already know about pipes or cables running under or through the floor near the join, including anything a previous job revealed.
Owners often hold the only record of what was found last time a floor was lifted, and nobody thinks to ask them for it.
3.Where the new roof arrives at the existing wall
A new roof has to stop somewhere against the house, and what is already on that wall decides how awkward the meeting is. These prompts get it looked at from outside.
Stand outside and note everything on the wall at roughly the height a new roof would arrive, including windows, vents, pipes, the gutter and any cabling.
The list you produce here turns a vague junction into a set of specific questions a designer can actually answer.
Write down whether an upstairs window sits directly above the proposed junction, and roughly how close it would sit to the new roof surface.
A window immediately above a new roof often decides the roof shape, and it is the constraint owners notice last.
Ask how rainwater would be kept out where a new roof meets the old wall, and who is responsible for that detail once work begins.
This junction is the part of an extension most likely to be blamed later, so it is worth naming an owner for it at the outset.
How a new roof is weathered against an existing wall is a technical detail for a qualified professional; nothing here indicates what would work.
Note whether the existing gutter or downpipe would be interrupted by the new roof, and ask where the water they currently carry would go instead.
Rainwater that used to leave the building at one point has to leave somewhere else, and that is often overlooked until it rains.
Consider whether the junction would be visible from anywhere you actually spend time, including from an upstairs window looking down onto it.
A messy meeting of roof and wall matters far more when it sits in the view from a bedroom than when nobody ever sees it.
Ask what would happen to the existing wall face above the new roof, since a wall usually needs attention once something is built against it.
Owners assume the wall simply carries on, and then find the finish above the new roof looks wrong or needs work while access exists.
What an existing wall needs above a new roof is for a qualified professional to assess; treat this only as a question to raise.
4.The outside wall that ends up indoors
Once an extension is built, part of the old external wall becomes an internal surface. It is one of the most consistently forgotten parts of the connection.
Note what the existing external wall is finished with, since that face would end up inside the new space unless something is deliberately done to it.
Render, painted brick and weathered pointing all look very different indoors, and the decision is rarely made consciously.
Write down which parts of that wall you would want to see afterwards and which you would rather have covered over.
Owners sometimes want the old outside wall left visible as a record of the original house, and sometimes want no trace of it.
Ask what happens to the damp-proof arrangements in a wall that stops being an external wall, and write down the answer in the words you are given.
This is a genuine technical question at every extension junction, and it is one an owner should raise rather than try to resolve.
Damp-proof arrangements at a junction between old and new must be assessed on site by a suitably qualified professional.
List the external fittings on that wall that would end up indoors, including outside lights, a tap, an alarm box, a meter box or an aerial fixing.
Each of these belongs to a different trade or provider, and each is only a problem on the morning it is in the way.
Consider whether an existing window in that wall would be kept as an internal opening, blocked up, or reused as a serving or borrowed-light opening.
Reusing an existing opening usually means less disturbance than forming a new one, and it needs deciding rather than defaulting.
Note any air brick or low-level vent on that wall and raise it as a question, rather than assuming it can simply be built over or covered.
Those vents usually serve something in the existing house, and enclosing them raises questions an owner is not in a position to answer.
What must happen to an air brick or under-floor vent on a wall being built against is for a qualified professional to establish.
5.How the seam behaves once both halves exist
New work and old work are not the same age and do not behave identically. These prompts build the record a professional will want and set expectations honestly.
Photograph any existing cracking near the proposed junction and note where each crack runs, so the record clearly predates any work.
A dated record of what was already there is one of the most valuable things an owner can produce if anything is queried later.
Write down whether the house has ever moved, been repaired, been strengthened or been underpinned, and where any paperwork about it might be.
This history changes how a professional approaches the junction, and owners often half remember it without ever mentioning it.
Ask how new construction and existing construction are expected to behave where they meet, and what is normally allowed for at that seam.
Hearing this before work starts turns a later hairline crack from an argument into something that was already discussed.
How structures behave where they join is a matter for a qualified structural professional; nothing here indicates what is normal at your property.
Note any tree or large shrub standing near the proposed junction, including one on a neighbouring plot, and record roughly how close it stands.
Ground behaviour close to a building is commonly asked about, and the presence of a tree is something an owner can report accurately.
Consider how you would want any fine cracking at the join treated once the work is finished, and agree in writing who would come back to look at it.
Settling this while everyone is still talking is far easier than raising it for the first time after completion.
Record which internal finishes run right up to the proposed join, since continuous plaster and rigid tiling tend to show any movement sooner than more forgiving finishes.
Knowing which surfaces are likely to show a change first lets you ask what could be done differently at that particular line.
6.Heating, power and drainage carried across
The wall being opened is usually the wall everything is attached to. These prompts capture what has to be rerouted before it becomes an on-site improvisation.
Note where the heating pipework appears to enter the existing room, and ask whether an enlarged space can be served from the same arrangement.
A room that doubles in size is a different demand, and the answer affects both the design and what else has to be disturbed.
Write down where the consumer unit sits and how far it is from the proposed new space, in terms of which rooms a cable would have to cross.
How far away something sits matters far less than what a cable would have to pass through, and only you can describe the rooms in between.
List the sockets, switches and radiators sitting on the wall that would be opened, and write down where you would want each of them instead.
These get relocated in a hurry on site unless the owner has already said what they want, and the results are hard to undo.
Consider how lighting would be controlled once two spaces read as one, and note the doorways you would actually want to switch from.
Switching that made sense for two separate rooms usually makes no sense at all across a combined space.
Ask what would have to happen to any waste or soil pipe passing through the area of the junction, and whether its route can be kept.
Drainage rarely moves as easily as owners expect, and it sometimes decides where the opening can be at all.
Alterations to drainage and soil pipework are for a suitably qualified professional and may need confirmation with the relevant local body.
Note where the broadband, telephone or aerial cable enters the house, because it is very often fixed to exactly the wall being opened.
Each of these belongs to an outside provider with its own process, which takes its own course alongside the building work.
7.Staying in the house while the opening is made
Forming the connection is usually the most disruptive stage of an extension. These prompts get that period described honestly before it arrives.
Write down which rooms would be unusable while the wall is open, and where the household would cook, wash and sleep during that stage.
Households discover this late and then make hurried decisions under pressure; settling it early is far calmer.
Ask at which stage of the work the existing wall would actually be opened, and how the house would be closed up again at the end of each working day.
The answer tells you how exposed the house really is, and it is a reasonable thing to agree before work starts.
Consider whether the new structure could be built and made weathertight before the connection is formed, and ask whether that is possible here.
Sometimes it is and sometimes it is not, and the difference matters enormously to anyone staying in the house.
Note the route dust would travel through the house once the opening is made, and which internal doorways would need to be sealed off.
Dust follows air movement rather than sight lines, and it reaches rooms nobody expected unless the route is thought about.
Record which possessions, fittings and floor coverings would have to come out of the existing room, and where you would put them.
Storage for the contents of a room is a real constraint that owners routinely forget to arrange.
Agree in writing who is responsible for protecting floors, stairs and the route through the house while the connection is being formed.
Damage on the route in and out is a common source of dispute, and naming who protects it removes most of the argument.
Preparation
Documents and information to gather
Having these to hand usually makes the first conversation shorter and more useful.
- Photographs of the wall to be opened, taken from both inside and outside
- Any paperwork about previous movement, repairs or strengthening work
- Drawings or notes from earlier alterations that touched the same wall
- Dated photographs of existing cracking and finishes near the junction
- Details of the heating arrangement and where its pipework enters the room
- A list of what is fixed to the outside face and which provider owns it
Records
Decisions to record before work begins
Write these down in your own words, with the date, so everyone is working from the same version.
- How open the link between the old room and the new space should be
- Whether a step at the join would be acceptable to everyone in the household
- Whether the existing floor finish continues into the new space or stops
- Whether the old outside wall face is left visible or covered once indoors
- Where the household would live while the opening is being formed
- Which fittings from the opened wall you want back and where they should go
Professional review
Questions to discuss with qualified professionals
Bring these to the relevant qualified professional, supplier or authority. Requirements vary by project and location.
- What would be needed above an opening of the sort we are describing here?
- How would the new roof be weathered where it meets the existing wall?
- What happens to the damp-proof arrangements once that wall becomes internal?
- How would the two floor constructions meet, and would that leave a step?
- How do you expect new and existing construction to behave where they join?
- Can the new structure be made weathertight before the wall is opened here?
- What would have to be moved or rerouted before the connection can be formed?
- Which parts of this junction would you want opened up and looked at first?
Blind spots
Commonly overlooked items
- The radiator, sockets and switches on the wall that is being removed
- An air brick or under-floor vent on the wall that becomes internal
- The upstairs window sitting just above where the new roof would land
- Where existing gutter water goes once the roof line is interrupted
- That the old external wall face becomes an internal surface to finish
- The stage at which the house is genuinely open to the weather
- Dust reaching the whole house through one newly formed opening
What this checklist does not do
- Nothing here indicates whether any part of an existing wall can be opened; only a suitably qualified professional can establish that on site.
- How a new roof is weathered against an existing wall is a detail for a qualified professional, never something to settle from a checklist.
- Damp-proof arrangements where old and new meet must be assessed at the property; treat every prompt here as a question to put to somebody qualified.
- Recording existing cracking is useful; interpreting it is not, and it belongs with a suitably qualified structural professional.
More preparation
Related checklists
Inspiration
Related Ideas Library pages
Design directions to explore once the preparation is done.
Go deeper
Related Build Design Hub guides
Explanatory planning guidance behind the decisions on this page.
Additions & Conversions Planning Checklists
Preparation checklists for extensions, conversions and outbuilding projects — what the new space has to do, and the questions that belong with professionals.
Browse all Additions & Conversions checklists →