Checklists · Construction planning

Before the Concrete Goes In Decision Checklist

To give an owner a confirmation walk through the decisions that belong to them rather than to the design team, and that become a repair rather than a revision once a pour has happened.

Project stage:Design developmentBefore work beginsDuring the project

8 sections · 48 planning prompts · educational owner-side preparation

Prints in your browser only. Nothing is saved, sent or tracked.

The checklist

Work through the sections

Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.

More preparation

Related checklists

Utilities and Services QuestionsWater, drainage, power, fuel and telecoms all raise questions before a construction project is designed, and this records what you can see plus who asks the rest.Water and Drainage QuestionsTrace how water reaches your property and how it leaves it, then prepare the ownership, capacity and access questions that belong with a drainage authority or designer.Construction Acoustic PlanningHow to think about the way a finished building will sound, from the noise around the plot and room adjacencies through to equipment, doors, gaps and hard interior surfaces.Ceiling Height QuestionsTurns a vague worry about low ceilings into recorded observations and questions, covering the ceiling zone, bulkheads and the heights that get fixed early.Daylight and OrientationWorking out which way a new building should face, which rooms want which part of the day, and what an owner can usefully observe on the plot before any drawings begin.Construction Decision SequencingWork out which construction decisions have to come first, which can honestly wait, and who owns each one, before the order of the choices starts driving the project for you.External Works PlanningGetting the drive, paths, levels, boundaries and planting into a construction brief early, instead of leaving everything outside the walls until the end of the job.Home Exercise SpaceAn owner's record before any exercise space is designed: what exercise genuinely happens, what the floor would have to accept, what is underneath, and how equipment gets in and out.

Inspiration

Related Ideas Library pages

Design directions to explore once the preparation is done.

Go deeper

Related Build Design Hub guides

Explanatory planning guidance behind the decisions on this page.

Construction Project Planning Checklists

Owner-side preparation checklists for new-build and major construction projects — scope, information to gather and the questions to bring to qualified professionals.

Browse all Construction Planning checklists →