Ground Gas and Radon Conversation Preparation Checklist

To help an owner assemble a plot's history and its surroundings before a gas assessment is commissioned, and to record which buried layer and which external openings the finished building will depend on long after handover.

Project stage:Early planningChoosing professionalsDesign development

7 sections · 42 planning prompts · educational owner-side preparation

Prints in your browser only. Nothing is saved, sent or tracked.

The checklist

Work through the sections

Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.

More preparation

Related checklists

Pre-Construction ConversationA first conversation about a building project goes further when the owner has rehearsed the answers, brought the right material and knows which questions are not theirs.Building Plot InformationWhat an owner can responsibly find out about a plot before professionals are appointed: documents to obtain, features to record, and enquiries worth starting early.Construction Decision SequencingWork out which construction decisions have to come first, which can honestly wait, and who owns each one, before the order of the choices starts driving the project for you.Door Schedule PreparationDoors are usually drawn as a swing and never described in words; this helps an owner set down handing, thresholds, linings and locking door by door.Drawing Review PreparationOwners and designers read drawings differently. This checklist helps you prepare to review an issued set, test whether your brief survived it, and ask sharper questions.External Works PlanningGetting the drive, paths, levels, boundaries and planting into a construction brief early, instead of leaving everything outside the walls until the end of the job.Future Adaptability QuestionsFor owners of a new build or major construction project: how to name the changes a building may have to absorb later, and which adaptability questions belong with professionals.Plant and Ground ProtectionBuried things under a working route get crushed silently and found months later. This covers what lies beneath the route and what protection is agreed before anything heavy arrives.

Inspiration

Related Ideas Library pages

Design directions to explore once the preparation is done.

Go deeper

Related Build Design Hub guides

Explanatory planning guidance behind the decisions on this page.

Construction Project Planning Checklists

Owner-side preparation checklists for new-build and major construction projects — scope, information to gather and the questions to bring to qualified professionals.

Browse all Construction Planning checklists →