Skip to main content
HELPERG Ecosystem
Build Design HubBuild Design Hub

Checklists · Drainage

Ground Infiltration Test Arrangement Questions Checklist

Help an owner prepare for an infiltration test as an event with its own arrangements, so the right questions are asked beforehand and the record afterwards is usable by whoever designs the scheme.

Project stage:Early planningChoosing professionalsBefore work begins

7 sections · 41 planning prompts · educational owner-side preparation

Prints in your browser only. Nothing is saved, sent or tracked.

The checklist

Work through the sections

Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.

More preparation

Related checklists

Below-Ground Water QuestionsSeepage, ground that will not dry, cellar damp and water showing in low openings, dated by the owner without any guess at where it comes from.Ground Level and DampAn observation checklist for owners recording where outside ground meets the building, what the walls and vents show, and where damp signs appear indoors.Surface Water ObservationAn observation checklist for owners recording where surface water gathers on a plot, how it travels and how long it lingers, before any drainage conversation begins.Downpipe Discharge QuestionsTrace where roof water is sent, record what is visible at gutters and downpipes from safe ground, and keep what you observe separate from what a professional decides.Drainage Connection QuestionsA question-building checklist for owners wondering what a proposed drainage connection would involve, keeping every answer with a professional and the responsible authority.Drainage Maintenance QuestionsWhat upkeep genuinely happens here, who does it, what has blocked before, what can be reached at all, and which questions belong with somebody qualified.Drainage Record KeepingA planning checklist for owners setting up a drainage record that lasts, covering what to capture each time, how to file photographs and what to hand on to somebody else.Surface Water HandoverA handover checklist for owners taking on a designed surface water scheme, covering what has to be known, reachable and recorded before the people who built it leave.

Inspiration

Related Ideas Library pages

Design directions to explore once the preparation is done.

Go deeper

Related Build Design Hub guides

Explanatory planning guidance behind the decisions on this page.

Drainage & Site Discussion Checklists

Observation and record-keeping checklists for water on site — what to watch, what to photograph, and the questions that belong with a drainage professional.

Browse all Drainage & Site checklists →