Skip to main content
HELPERG Ecosystem
Build Design HubBuild Design Hub

Checklists · Landscape

Added Load Above a Retaining Structure Decision Checklist

Help an owner recognise that placing something heavy on, above or beside retained ground is a change to what the structure was asked to carry, and record enough to have that conversation properly.

Project stage:Thinking about itEarly planningAfter completion

7 sections · 39 planning prompts · educational owner-side preparation

Prints in your browser only. Nothing is saved, sent or tracked.

The checklist

Work through the sections

Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.

More preparation

Related checklists

Landscape Material DecisionsSettle an outdoor material palette before anyone is briefed: what the plot already contributes, which material should dominate, and what to ask a supplier.Site Survey InformationA gathering checklist for owners collecting the plans, photographs, rough measurements and site observations a garden professional will ask for before any design work starts.Landscape Contractor TalkPrompts for owners preparing to talk to a landscaping contractor about how the site will be run, who comes and goes, and how changes and ground surprises get raised.Existing Feature RecordAn inventory checklist for owners recording every structure, surface and fitting already standing outdoors, its visible condition, and whether it is quietly doing a job.Level Change DecisionsDecision prompts for owners settling which garden levels stay, which change, and what a level terrace would take from the rest of the plot before anyone commits it to paper.Retaining DiscussionPreparation for a conversation about holding ground back in a garden: what your layout would ask the slope to do, what stands above and below it, and which questions belong to an engineer.Landscape Scope ConversationPrompts for owners drawing the edge of an outdoor project: where the work stops, what is excluded, who supplies what, and which responsibilities belong elsewhere.Before the Pour DecisionsThe owner-side decisions that stop being changeable once concrete is placed: levels, thresholds, where services enter, heating zones and the record kept of what went in.

Inspiration

Related Ideas Library pages

Design directions to explore once the preparation is done.

Go deeper

Related Build Design Hub guides

Explanatory planning guidance behind the decisions on this page.

Landscape Project Planning Checklists

Landscape project preparation checklists — site information to gather, use and access decisions to record, and questions for landscape professionals.

Browse all Landscape Planning checklists →