Checklists · Renovation planning
Renovation Electrical Upgrade Questions Checklist
Sets out how an owner can gather observable evidence about an existing installation and about how the household actually uses power, so a qualified electrical professional starts from facts rather than assumptions.
7 sections · 42 planning prompts · educational owner-side preparation
https://www.builddesignhub.com/checklists/renovation-project-planning/renovation-electrical-upgrade-questions · Build Design Hub — educational planning resource. Requirements vary by project and location.
Scope
What this checklist covers
The preparation ground these prompts walk through.
- Recording what the existing installation looks like without opening anything
- Mapping where power is really used, including every extension lead in service
- Noting lighting positions, switching arrangements and ceiling voids
- Listing outdoor, garage and outbuilding supplies that are easy to forget
- Preparing questions about chasing, making good and the order of trades
Audience
Who this checklist is for
- Owners of an older property planning renovation who suspect the wiring is dated
- People refitting kitchens, bathrooms or lofts where power positions will change
- Owners who want to prepare properly before a qualified electrical professional attends
- Households living with extension leads because the sockets are in the wrong places
Timing
When to use it
- Recording visible evidence about an installation without touching any of it
- Mapping how the household really uses power, room by room and socket by socket
- Listing outdoor and outbuilding supplies before anyone is asked to look at the work
- Preparing questions about chasing, making good and the order of trades
- Deciding what has to be settled before cabling positions become fixed
Limits
When it is not sufficient
This is general planning preparation. These situations need a qualified professional, and often the relevant authority.
- Any judgement about the condition or adequacy of an existing installation
- Deciding what can be reused, extended or left in place as it is
- Working out what local requirements, notifications or records apply to the work
- Any testing, opening of covers or contact with cabling of any kind
The checklist
Work through the sections
Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.
1.Visible clues about the existing installation
There is a great deal to record from outside the covers. Everything behind a cover belongs to somebody qualified.
Photograph the front of the consumer unit, including whatever labelling is visible, without opening it or removing anything at all.
Never open a consumer unit, socket, switch or junction box; everything inside belongs to a qualified electrical professional.
Note the style and material of the sockets and switches around the property, and flag any that look noticeably older than the rest.
Accessories are the most visible clue to how an installation has grown over time, and the mixture usually tells its own story.
Look into the roof space from the hatch with a torch and photograph any cabling lying on the surface, without touching or moving any of it.
Cable visible in a roof space often carries the clearest evidence of when parts of an installation were last worked on.
Record any socket, switch or fitting that is discoloured, cracked, warm to the touch or loose in the wall, and note exactly where it is.
Stop using anything discoloured, warm or loose and raise it with a qualified electrical professional promptly rather than waiting for the project.
Note how cables enter each room, whether clipped to the surface, run in trunking or disappearing into the plaster, and photograph the pattern.
Surface routing and buried routing suggest different histories, and the mixture across a property is worth capturing before decoration hides it.
Gather whatever paperwork you hold from previous electrical work, and state plainly where you hold none rather than leaving a silence.
An honest gap in the paperwork is far more useful to a professional than a vague reassurance that work was done properly.
2.Where power is actually used today
The clearest evidence of what an installation lacks is the way the household has quietly worked around it.
Photograph every extension lead, adaptor and trailing socket exactly where it sits, before anybody tidies the property for a visit.
Extension leads are an honest map of the sockets that are missing, and they always vanish before a professional visit unless you record them.
Note which sockets are permanently occupied by something that never gets unplugged, and what each of those things is.
Permanently used outlets show where the household has settled, which is often different from where the original layout assumed.
Record which sockets sit behind furniture, inside a cupboard or under a fitted unit and cannot realistically be reached or used.
An unreachable socket counts for nothing in practice, and listing them corrects the impression that a room is already well served.
Walk each room and note where you would genuinely want power if the room worked properly, including at worktop, desk and bedside positions.
This is the part only you can supply, and it is far easier to think about calmly now than under pressure once cables are being run.
Note where the household charges devices, and whether that habit has drifted to a place with no socket anywhere near it.
Charging habits move over time and rarely match the original layout, which is a small thing that improves a room noticeably.
Record any appliance position likely to change during the renovation, because the power has to follow the appliance rather than stay put.
Appliance moves are agreed in a layout conversation and forgotten in the electrical one, leaving the supply in the old position.
3.Lighting, switching and ceiling voids
Lighting gets decided late and regretted early. Record how each room is lit and switched before any ceiling is closed up.
Record how each room is lit now and where the light actually falls, compared with where you need it for reading, cooking or working.
A single central fitting lights the middle of a room and nothing else, which is usually the real complaint behind a request for more lighting.
Note which switches are in awkward positions, including any room you enter in the dark before reaching one.
Switch position is decided in seconds on site and then lived with for as long as you stay in the property, so it deserves a moment of thought beforehand.
Record where switching from more than one position already exists, and where you wish it did, particularly on stairs and long landings.
Adding switching later means running new cable through finished surfaces, which is exactly the disruption a renovation can avoid.
Note whether any ceiling appears lowered or overboarded, judging from cornices, door heights and hatches that no longer line up.
What lies inside a ceiling void, including cabling and insulation, must be established by a qualified professional before anything is fitted into it.
Write down which rooms need their lighting positions settled before plastering, and which can reasonably be left until later.
Some decisions are genuinely reversible and some are not, and knowing which is which stops you agonising over the wrong ones.
Record any existing recessed fitting and note what sits directly above it, whether that is a room, a roof space or an unknown void.
Recessed fittings raise questions about insulation, ventilation and separation between floors that only a qualified professional can answer.
4.Data, aerial and doorbell cabling runs
The cabling that is not power is the part most often forgotten until the walls have already been closed.
Note where the incoming telephone or broadband service enters the property, and where the equipment for it currently sits.
The entry point is fixed and the equipment position usually is not, which is a useful distinction to have clear early on.
Record where an aerial or dish cable enters the building and how it is routed to each room that currently uses it.
These runs are typically informal, added over the years, and lost entirely once decoration covers the surface clips.
List the rooms where you would want a wired connection rather than relying on a wireless signal, and note why for each one.
Wired runs are trivial while floors are open and awkward afterwards, so the list is worth making before the work starts.
Note where a doorbell, entry system or camera is fitted, and where its supply and cabling appear to come from.
Entry equipment is usually connected in a way nobody remembers, and it is easily lost when a hallway is refinished.
Record where alarm sensors, sounders and any control panel are fitted, and whether the system is still in use or long abandoned.
Do not disturb, disconnect or reposition alarm equipment; raise it with whoever maintains the system or a qualified professional first.
Write down which of these runs would be simplest to install while floors and walls are already open for other reasons.
The open fabric stage is brief, and the runs that were not asked for during it are the ones nobody adds afterwards.
5.Outdoor, garage and outbuilding supplies
Supplies that leave the house are consistently left out of the conversation and then added as an afterthought.
Note every outdoor socket, light and supply already present, including any that no longer work or have been disconnected.
Dead outdoor points still have cable somewhere, and knowing they exist is more useful than assuming there is nothing out there.
Trace as far as you can by eye where a supply to a garage, shed or outbuilding leaves the house, and photograph both ends.
Do not excavate, uncover or handle any buried or external cable; its route and condition are for a qualified professional to establish.
Record what the outbuilding supply is used for now, and what you would want it to serve once the renovation is complete.
An outbuilding that becomes a workshop or a home working space has quite different needs from one storing a lawnmower.
Note where outdoor lighting would genuinely be useful, such as at steps, gates, a bin store or a parking area.
Outdoor lighting is easiest to arrange while other external work is happening and awkward to add once surfaces are finished.
Record whether any outdoor supply is shared with a neighbouring property or appears to cross land you do not own.
Rights over land and shared connections are a legal subject in their own right; put a supply of this kind to a suitably qualified adviser before it is altered.
Note whether any paving, planting or landscaping is planned that would sit over the route an existing supply appears to take.
Burying an existing route under new hard surfacing is easy to avoid now and thoroughly awkward to undo afterwards.
6.Chasing, making good and decoration
Electrical work leaves marks in every room it passes through. Agree what happens to those marks before the work begins.
Ask what would need to be cut into walls and ceilings in each room, and write the answer down room by room rather than in general terms.
A general reassurance about minimal disruption means nothing; a room by room answer is something you can hold people to.
Agree in writing who fills, plasters and redecorates after cables have been run, and to what standard of finish in each room.
A chase filled flush is not the same as a wall ready to decorate, and the distance between those two states is where the argument usually happens.
Note which rooms have finishes that could not realistically be replicated, such as an old cornice, a tiled surround or a papered wall, and flag them early.
Where a finish may contain older materials, ask a qualified professional what is involved before anything is cut, drilled or removed.
Record whether floors would need to come up for cable runs, and whether the existing covering could be relaid afterwards.
Boards lifted for cabling are rarely put back invisibly, and it is worth knowing which rooms will show that before the covering goes down again.
Ask whether surface routing is a reasonable option in any room where cutting into the fabric would be particularly destructive.
In some rooms a visible run is the lesser evil, and it is worth asking rather than assuming everything must be buried.
Note where furniture and belongings would have to be moved, and agree who is actually doing the moving and where things go.
Clearing rooms is a real task that nobody prices into their own head, and it delays work when it has not been arranged.
7.Order of work and records to keep
Electrical work has a natural place in the sequence, and it produces paperwork that will outlive the project.
Ask what must be decided before cabling is installed, since a long list of positions becomes effectively fixed at that point.
First fix quietly freezes decisions that owners assume are still open, which is why so many are made in a rush.
Record the decisions you are not yet ready to make, and ask what the latest sensible moment is for settling each of them.
Knowing which choices can wait removes pressure from the ones that genuinely cannot.
Ask which other trades need to be finished ahead of the electrical work in each room, and which of them follow on immediately once it is done.
Order disputes between trades are usually about who makes good, and settling the order settles most of the argument.
Establish before the work starts which documents are expected to exist at the end of it, and who will be holding the original of each one.
Notification and record requirements for electrical work are set locally; ask a qualified electrical professional and the relevant authority what applies here.
Ask for a marked up plan showing where cables have been run, and keep it permanently with the property paperwork.
A record of cable routes proves its worth the first time somebody puts a drill into a wall long after everyone involved has forgotten what is behind it.
Record which parts of the installation have deliberately been left untouched, and note the reason given for leaving each one.
Untouched areas become invisible once the project ends, and the next owner or adviser has no way of knowing they were excluded.
Preparation
Documents and information to gather
Having these to hand usually makes the first conversation shorter and more useful.
- Photographs of the consumer unit front, accessories and any cabling visible from the loft hatch
- Any paperwork you hold from previous electrical work carried out at the property
- Photographs of every extension lead and adaptor in use, taken before tidying anything away
- Room by room notes of where you want power, lighting and switching to be
- A sketch showing outdoor, garage and outbuilding supplies as far as you can trace them
- Notes of which appliance positions are changing as part of the renovation
Records
Decisions to record before work begins
Write these down in your own words, with the date, so everyone is working from the same version.
- Which rooms have power and lighting positions changed, and which are left exactly as they are
- Where you want sockets, switches and lighting once each room works the way you intend
- Who is responsible for filling, plastering and redecorating after cables have been run
- Which wired connections are installed while floors and walls are already open
- Which decisions you are deferring and the point at which each one must be settled
- Which parts of the installation are deliberately being left untouched
Professional review
Questions to discuss with qualified professionals
Bring these to the relevant qualified professional, supplier or authority. Requirements vary by project and location.
- What does what you can see suggest about when this installation was last worked on?
- What would you need to establish before advising on any of it, and how would you establish it?
- What would have to be cut into in each room, and what could be surface routed instead?
- Which decisions become fixed once cabling is installed, and which stay open after that?
- What notifications and records apply to this work where the property is, and who arranges them?
- What should I be told about anything you find that we have not planned for?
- How should cable routes be recorded so that later work does not damage them?
- What order do you need relative to the plastering, flooring and joinery work?
Blind spots
Commonly overlooked items
- Extension leads tidied away before a visit, removing the clearest evidence of what is missing
- Sockets that end up behind a fitted unit or wardrobe once the room is finally finished
- Broadband, aerial and doorbell cabling left out until the walls have already been closed
- Outbuilding and garden supplies not mentioned until new paving has been laid over them
- The gap between a chase filled flush and a wall genuinely ready to be decorated
- No record at all of where cables run, discovered later by somebody holding a drill
- Alarm and entry equipment disturbed during the work without telling whoever maintains it
What this checklist does not do
- Nothing here assesses an electrical installation; only a qualified electrical professional can say anything about its condition.
- Everything recorded here is gathered from outside the covers: no accessory is removed, no cabling touched and no test of any kind carried out.
- Any accessory that is warm, discoloured, cracked or loose should be reported to a qualified professional without waiting.
- Notification and record requirements for electrical work vary locally and must be confirmed with the relevant authority.
More preparation
Related checklists
Inspiration
Related Ideas Library pages
Design directions to explore once the preparation is done.
Go deeper
Related Build Design Hub guides
Explanatory planning guidance behind the decisions on this page.
Renovation Project Planning Checklists
Preparation checklists for renovation projects — scope, sequencing conversations, existing conditions to document and decisions to agree before work starts.
Browse all Renovation Planning checklists →