Skip to main content
HELPERG Ecosystem
Build Design HubBuild Design Hub

Checklists · Site logistics

Utility Isolation Questions Checklist

Help an owner prepare for conversations about services being interrupted during work, by recording where each supply enters the property and by turning every isolation, capping and reconnection matter into a question for qualified people.

Project stage:Before work beginsDuring the projectHandover

7 sections · 42 planning prompts · educational owner-side preparation

Prints in your browser only. Nothing is saved, sent or tracked.

The checklist

Work through the sections

Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.

More preparation

Related checklists

Condition Record Before WorksWhat to write down about a property before anyone starts: existing damage, meter readings, shared structures, planting, and how the record is issued and acknowledged.Site Parking QuestionsHow your street actually works, how many vehicles the work brings to it, and which of the parking questions can only ever be answered by the local authority.Neighbour NotificationWho hears about work at your property, what a first note should say and avoid saying, who they contact once it starts, and how all of it is recorded.Weather Exposure PlanningPlanning for the period a property stands open to the weather: temporary covering, where water would go, ground conditions, wind, and how the household copes.Site Key and Access HandoverHanding over access to a property for building work: which entry points are involved, who holds keys and codes, how it is recorded, and how the arrangement ends.Delivery and UnloadingMaterials arrive long before anyone is ready for them. This covers where a vehicle can stand, who takes the load off, what is checked and where it waits.Storage and Utility PlanningWhere laundry, plant equipment, bins and everyday clutter would sit in a construction project, so storage is placed deliberately instead of ending up as whatever space is left over.Airtightness ConversationGet ready to talk about draughts and sealing: where air moves now, the openings already in the fabric, who owns the sealing line, and what testing would actually tell you.

Inspiration

Related Ideas Library pages

Design directions to explore once the preparation is done.

Go deeper

Related Build Design Hub guides

Explanatory planning guidance behind the decisions on this page.

Site Access & Logistics Checklists

Planning the practical side of having work happen at a property — access, deliveries, waste, neighbours, protection and the record made before work starts.

Browse all Access & Logistics checklists →