Checklists · Handover
Post-Completion Observation Record Checklist
Helps an owner set up an ordinary habit of observation after completion, describe what appears in a form a qualified professional can actually work with, and separate what belongs raised at once from what belongs watched.
7 sections · 42 planning prompts · educational owner-side preparation
https://www.builddesignhub.com/checklists/handover-and-maintenance/post-completion-observation-record · Build Design Hub — educational planning resource. Requirements vary by project and location.
Scope
What this checklist covers
The preparation ground these prompts walk through.
- Establishing what the finished work looked and felt like on the day you took it back
- Noticing movement, drying out and the small changes that follow new work
- Watching what heavy rain and the first cold weather reveal about the building
- Describing sounds, smells and draughts in terms somebody else can act on
- Recording an observation so its position, date and conditions are all preserved
- Working out what to raise promptly and who it should now be raised with
Audience
Who this checklist is for
- Owners who have just moved back into a space and want a baseline before it stops feeling new
- People noticing small changes and unsure whether they are normal settling or something more
- Owners with a defects arrangement in place who want their observations written properly
- Anyone looking after a property on behalf of somebody who is not there to see it
Timing
When to use it
- Setting a baseline record of the space on the day it comes back into use
- Keeping a simple, repeatable observation habit rather than an unsustainable inspection routine
- Describing cracks, damp marks, sounds and smells factually rather than diagnostically
- Building a dated sequence that shows whether something is changing or has settled
- Preparing observations in a form worth sending to the contractor or a professional
Limits
When it is not sufficient
This is general planning preparation. These situations need a qualified professional, and often the relevant authority.
- Working out what any crack, damp patch or sound actually means, which needs a qualified professional
- Reaching any conclusion that the work is finished or acceptable, which is for the appointed professionals to address
- Replacing the reporting arrangements in whatever agreement exists with your contractor
- Situations that call for immediate action rather than observation, where the relevant supplier or emergency service should be reached first
- Judging whether an observation has been dealt with properly once somebody has attended
The checklist
Work through the sections
Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.
1.Setting a baseline while the work still looks new to you
The state of the space on the day you take it back is the only comparison you will ever get, and it disappears quickly as your eye adjusts.
Walk the finished space slowly on the day it comes back into use and record what it looks and feels like then, because within a short while it will simply look normal.
Owners lose the baseline faster than they expect, and afterwards cannot say whether something was always like that.
Pick a small number of things you will look at each time you pass, rather than setting yourself a full walk-round that you will quietly stop doing.
A short habit that survives is worth far more than a thorough routine abandoned after the novelty of the new space wears off.
Note the places you would never naturally look — behind doors, above head height, inside cupboards, under the lowest shelf — and go to them deliberately.
Marks in the places nobody looks are usually well advanced by the time somebody happens to notice them.
Photograph the same views from the same standing positions each time, rather than photographing whatever has caught your attention on that particular day.
Repeat photographs from a fixed position can be compared; photographs of interesting things cannot be compared with anything.
Write down how the property is actually being used, including whether it is heated, fully occupied, empty, or being lived in around areas that are still unfinished.
How a building behaves depends heavily on whether anybody is in it, and an observation without that context is hard to interpret.
Record the weather at the time of each observation, since the same wall reads differently after a long dry spell and after rain driven against that face.
Weather is the single most useful piece of context and the one most often left out of an owner note.
2.Movement, shrinkage and the effects of drying out
New work carries a great deal of water and a great deal of newly cut timber. Both change, and the changes show up in predictable places.
Note where hairline cracking appears and whether it follows a junction between new and existing work or crosses an area that was never touched.
Where a crack runs is the part a professional wants to know, and it is easily lost once somebody has filled it.
Do not judge what any crack means; describe where it runs and take anything crossing structure to a qualified professional.
Mark the ends of any crack you are watching with a light pencil tick and the date, so that you can tell afterwards whether it has extended or stayed put.
Memory is unreliable about length, and a pencil mark answers the only question anybody will ask about it.
Note doors and windows that begin to catch, and record which corner or edge they catch on, since that is far more informative than the fact that they stick.
Where a door binds points at what has moved, whereas a note saying the door sticks tells the next person nothing.
Watch for gaps opening where skirtings, architraves and trims meet plaster, and record which side of the joint appears to have moved away from the other.
Shrinkage gaps at trims are common as timber dries, but the direction of the movement is the useful detail.
Note where fixings begin to show through a boarded finish, and whether they appear singly or in a run along the same line.
A single spot and a whole line of them are different observations, and describing which you have saves a wasted visit.
Record any floor that develops a creak or a change in feel underfoot, including exactly where you have to stand for it to happen.
A change in how a floor feels should be described to a qualified professional rather than worked out by lifting boards yourself.
3.What heavy rain shows that a dry day never will
Water finds the route it wants rather than the route anybody drew. The only way to learn that route is to be outside while it is raining.
Go outside during heavy rain rather than after it, and note where water actually runs off the building rather than where you had assumed it would go.
Almost everything useful about rainwater is visible only while it is falling, and invisible again within the hour.
Note any gutter or downpipe that overflows and whereabouts along its length it spills, since the place it spills says more than the fact that it did.
Overflow at one end suggests something different from overflow at the middle, and the distinction is lost once the rain stops.
Look at the ground beside the building while it is raining and note where splashing reaches the wall or where water runs towards it rather than away.
Ground behaviour beside a wall is easy to see in the rain and almost impossible to reconstruct afterwards.
Note where water stands on any flat surface once the rain has stopped, and whether it has cleared on its own by the time you next look.
Standing water is a straightforward thing for an owner to observe and a useful thing for somebody else to be told about.
Record internal damp marks with their shape and their position relative to something fixed, since the outline of a mark is the detail people forget to capture.
The cause of internal damp is a matter for a qualified professional; record what you can see rather than concluding where it came from.
Note whether the direction of the wind seems to matter, because a wall that only marks after rain from one side is a different observation from one that always marks.
A pattern tied to wind direction narrows things down considerably for whoever eventually looks at it.
4.How the space behaves once cold weather arrives
Work finished in mild weather is not tested until the first properly cold spell, and that is when the useful observations appear.
Note which rooms feel noticeably cooler than the rest of the property once the heating has been running, and whether it is the whole room or only one part of it.
A cold corner and a cold room point in different directions, and owners tend to report only the general feeling.
Record where condensation forms on cold mornings, on which surfaces, and whether it clears once the room is in normal use.
Condensation that clears and condensation that persists are different observations, and both are worth writing down.
Note any surface that stays cold to the touch while the rooms around it are warm, and describe exactly where it is rather than which room it is in.
Cold surfaces and condensation patterns can arise for several reasons; describe them to a qualified professional rather than deciding what lies behind them.
Write down how the heating behaves in the new area compared with the rest of the property, including anything that comes on or stays off when you did not expect it.
Adjusting or rebalancing a heating system is work for the installer or a qualified professional, not something to alter while you are still recording how it behaves.
Note any smell that appears only when the heating is running, and which room it is strongest in, since new systems and new materials both give off smells at first.
Distinguishing a settling-in smell from something else starts with knowing precisely when and where it occurs.
Record whether ventilation openings and extract points are being used as intended, and note anywhere somebody in the household has already closed one because it felt draughty.
Closed-off ventilation is one of the most common causes of later complaints and one of the easiest things to spot early.
5.Sounds, smells and draughts that only appear once the site is quiet
A building full of trades hides everything. Once it is quiet and occupied, an entirely different set of things becomes noticeable.
Note new sounds and describe them in ordinary language such as ticking, knocking, rushing or humming, together with what was happening in the property at the time.
Plain description travels better than technical guesswork, and the accompanying activity is often the clue.
Record where a draught can be felt, and whether it is still there with external doors shut and the property otherwise still.
Draughts felt with a door open are a different matter entirely from draughts felt in a closed and settled house.
Note any smell that arrives with a change in weather rather than with something being used, since that pattern is worth describing carefully.
A smell tied to wind or rain suggests a different line of enquiry from one tied to running a tap.
Write down which sounds travel between rooms more than you expected, and through which wall, floor or opening they seem to arrive.
Owners often report a room as noisy when the useful information is which surface the sound comes through.
Note whether a sound changes when a particular tap, appliance or switch is used, because that link is easily lost between one observation and the next.
A repeatable trigger turns a vague complaint into something somebody can stand and listen to.
Record anything that only happens at one point in the day, since intermittent observations are the ones most likely to be dismissed when nobody can reproduce them.
Take any smell you associate with fuel, burning or drains straight to the relevant supplier or a qualified professional rather than continuing to observe it.
6.Writing an observation somebody who was not there can use
Most owner reports fail not because the observation was wrong but because nobody else can find, date or picture what was described.
Write each entry as what you saw, where you saw it and under what conditions, and keep any idea you have about the cause on a separate line of its own.
An observation mixed with a theory tends to be argued with, while a plain description is simply checked.
Locate each observation against something permanent such as a window reveal, a corner or a doorway, rather than against furniture that will have moved by the next visit.
Positions given by furniture become meaningless within a season, and the entry can no longer be found.
Include something familiar in the photograph for a sense of scale, such as a door edge or a light switch, rather than relying on describing how big something is.
Close-up photographs of marks are almost impossible to interpret without something recognisable in the frame.
Note the date of every observation and keep the entries in order, because a sequence is the only way to show whether something is changing or has settled.
A single photograph proves nothing about movement; two taken from the same place at known dates prove a great deal.
Record the observations that came to nothing as well as the ones that persisted, since knowing what settled down is as useful as knowing what did not.
A record containing only complaints reads as a list of grievances rather than as an account of how the building behaved.
Say plainly when you are not sure whether something is new, and note what makes you unsure, rather than writing it up as though it were certain.
Honest uncertainty keeps the rest of your record credible when it matters most.
7.Deciding what to raise, when, and with whom
Not every observation belongs in a message the same day, and a few belong in one immediately. The difference is worth settling in advance.
Ask at handover which kinds of observation the contractor would want to hear about promptly and which they would expect to settle down on their own.
What should be reported and how quickly depends on the arrangement you have; confirm it with the contractor and any professional administering the work.
Raise anything involving running water, a smell of fuel or burning, or a change in how something structural feels, without waiting to see whether it develops further.
These belong with the relevant supplier, emergency service or qualified professional immediately, and not in an observation record at all.
Send an observation as a short written note with its photograph rather than describing it in a call you will have no record of afterwards.
A written entry can be forwarded to whoever needs it, while a phone description has to be recounted each time.
Ask who observations should be sent to now that the trades have left, and whether that changes once any defects arrangement comes to an end.
Routes for reporting after completion are set by your contract and by the appointed professionals; confirm them rather than assuming the site contact continues.
Keep your own copy of everything you send and every reply you receive, in date order, rather than relying on being able to find it in a message thread later.
Threads get archived, accounts change and phones are replaced, usually just before the point at which the record matters.
Note when an observation was looked at, by whom, and what you were told, even in the cases where nothing was done about it.
A record of what you were told at the time is the part owners most often wish they had, and the easiest to write on the day.
Preparation
Documents and information to gather
Having these to hand usually makes the first conversation shorter and more useful.
- Your baseline photographs taken from fixed standing positions on the day of taking over
- Any defects or reporting arrangement described to you at handover, in writing
- Contact routes for the contractor, the appointed professionals and the relevant suppliers
- A simple dated log you can add to without needing to be at a desk
- Notes of what you were told about how new surfaces and new systems would behave at first
- Copies of observations already sent and any replies received
Records
Decisions to record before work begins
Write these down in your own words, with the date, so everyone is working from the same version.
- Which fixed positions you will photograph from each time, so views stay comparable
- Which observations you will raise at once rather than watch, and on what basis
- Who each type of observation goes to now the site is closed
- How and where you will keep the record so that it survives a change of phone or address
- What you agreed with the contractor about how observations would be dealt with
Professional review
Questions to discuss with qualified professionals
Bring these to the relevant qualified professional, supplier or authority. Requirements vary by project and location.
- Which of these changes would you expect as the work dries out, and which would you not?
- What do you want to be told about promptly, and in what form?
- How should I describe a crack to you so that you can tell whether it needs a visit?
- Who should I contact once the defects arrangement comes to an end?
- What should I never attempt to open up, lift or investigate myself?
- Which observations would you rather see in the rain, and can somebody attend then?
- Is there anything about how this building is meant to be used that I should know?
- What records would you want from me if something needs to be looked at properly?
Blind spots
Commonly overlooked items
- No baseline photographs, so nobody can say whether a mark was there from the start
- Observations located against furniture that has since been moved
- Weather and occupancy left out, making a damp or condensation entry hard to interpret
- Ventilation openings closed off by somebody in the household and never mentioned
- Intermittent sounds dismissed because nobody could reproduce them during a visit
- Verbal reports made on site visits with no written trace of what was said
- Nothing written down about observations that settled down on their own
What this checklist does not do
- This is a record of what you noticed, not a diagnosis; the meaning of any crack, damp mark, sound or smell is for a qualified professional to establish.
- Nothing here amounts to an inspection or a judgement that work is complete, sound or acceptable, and it creates no entitlement to have anything put right.
- Anything suggesting fuel, burning, escaping water or a change in structure should go to the relevant supplier, emergency service or qualified professional immediately rather than into a log.
- Do not open up, lift or strip anything to investigate an observation; opening up finished work is for the people responsible for it.
More preparation
Related checklists
Inspiration
Related Ideas Library pages
Design directions to explore once the preparation is done.
Go deeper
Related Build Design Hub guides
Explanatory planning guidance behind the decisions on this page.
Handover & Maintenance Checklists
Handover preparation checklists — documents to request, information to record, and maintenance questions to ask before a project is considered finished.
Browse all Handover & Maintenance checklists →