Narrow Access Project Questions Checklist

Help an owner establish the real dimensions and obstacles on the route into a working area, decide what must be moved by hand, and prepare the access questions a professional needs answered before anything is agreed.

Project stage:Early planningChoosing professionalsBefore work begins

7 sections · 42 planning prompts · educational owner-side preparation

Prints in your browser only. Nothing is saved, sent or tracked.

The checklist

Work through the sections

Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.

More preparation

Related checklists

Upper Floor Access QuestionsFor work above ground level: what the stair, lift and landing route allows, what a building manager expects, and how shared parts are protected and put back.Site Access Route RecordA way to record the route from the public road to where work will happen, including the pinch points, surfaces and shared stretches others need to know about.Site Key and Access HandoverHanding over access to a property for building work: which entry points are involved, who holds keys and codes, how it is recorded, and how the arrangement ends.Shared Access QuestionsWhere the way in and out is not wholly yours: the documents to gather, the physical limits to record, and the agreements to reach before anything is arranged.Site Water and PowerWhat the work will draw water and electricity from, where the supplies and isolation points actually are, and which arrangements to settle before anyone starts.Condition Record Before WorksWhat to write down about a property before anyone starts: existing damage, meter readings, shared structures, planting, and how the record is issued and acknowledged.Site Photography RecordPlanning a photographic record of a property around building work: what to capture, when it has to happen, how images stay usable, and where the record is kept.Dust and Noise ControlHow dust and noise actually travel through an occupied property, what to ask about controlling them at source, and where the questions belong with a qualified professional.

Inspiration

Related Ideas Library pages

Design directions to explore once the preparation is done.

Go deeper

Related Build Design Hub guides

Explanatory planning guidance behind the decisions on this page.

Site Access & Logistics Checklists

Planning the practical side of having work happen at a property — access, deliveries, waste, neighbours, protection and the record made before work starts.