Skip to main content
HELPERG Ecosystem
Build Design HubBuild Design Hub

Checklists · Structural

Temporary Support Questions Checklist

Helps an owner assemble observations and questions about temporary support before any propping is planned, so that every judgement about what needs holding up stays with a qualified structural engineer.

Project stage:Early planningBrief and scopeBefore work begins

7 sections · 41 planning prompts · educational owner-side preparation

Prints in your browser only. Nothing is saved, sent or tracked.

The checklist

Work through the sections

Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.

More preparation

Related checklists

Beam and Support DiscussionHow to prepare for a conversation about a beam or support over a new opening, including what to decide about its appearance and how it would even reach the room.Crack Observation RecordA way to build a plain, dated record of the cracks in a property — where each one is, what it looks like and what else changed — for a qualified engineer to interpret.Structural Survey PreparationArrange access, uncover what is normally hidden and write down your observations before a structural visit, so the time on site goes on questions only a professional can answer.Structural Drawing ReviewPrepare to sit down with the structural drawings and notes you have been sent, so you can ask the right questions about them before anything is ordered or built.Structural Risk Question LogKeep one written log of every structural question still open on a project, who owns it, what would answer it and what it is currently holding up.Wall Removal DiscussionA preparation checklist for owners thinking about taking out an internal wall, covering what to observe, what to gather and what only a structural engineer can establish.Balcony and Terrace DiscussionSet out what a balcony or roof terrace sits over, what would stand on it and where water leaves it, then take structure, edge protection and waterproofing to professionals.Chimney Breast RemovalPreparing to ask about taking out a chimney breast: tracing the stack through every storey, recording what would remain and who else relies on it before anything is decided.

Inspiration

Related Ideas Library pages

Design directions to explore once the preparation is done.

Go deeper

Related Build Design Hub guides

Explanatory planning guidance behind the decisions on this page.

Structural Discussion Preparation Checklists

How to prepare a conversation with a structural engineer or surveyor — what to observe and record, and what only a qualified professional can establish.

Browse all Structural Discussion checklists →