Checklists · Structural
Below-Ground Waterproofing Ownership Questions Checklist
Helps you establish that waterproofing a below-ground space is a distinct design role, understand which approach is proposed and why, and find out in advance what you will be left running, reaching and maintaining after handover.
7 sections · 38 planning prompts · educational owner-side preparation
https://www.builddesignhub.com/checklists/structural-discussion-preparation/below-ground-waterproofing-ownership-questions · Build Design Hub — educational planning resource. Requirements vary by project and location.
Scope
What this checklist covers
The preparation ground these prompts walk through.
- Establishing who is responsible for the waterproofing design as a role of its own
- Which approach is proposed, and whether that was a decision or a default
- What an arrangement that manages water rather than excluding it leaves you operating
- Access to the parts that have to stay reachable once finishes are in place
- The record you need at handover, and what a future occupier would need
- How the intended use of the space relates to the conditions it will actually have
Audience
Who this checklist is for
- Owners planning a basement, a lower ground floor or a partly buried room
- Households converting an existing cellar into occupied accommodation
- Owners taking on a property with an existing below-ground waterproofing arrangement
- Owners approaching handover of a project that includes below-ground space
Timing
When to use it
- Establishing early who holds the waterproofing design role on your project
- Preparing questions about an approach that has already been proposed to you
- Working out what you would be maintaining after the project finishes
- Assembling the handover information a below-ground space needs
- Understanding what an existing arrangement in a property you have bought involves
Limits
When it is not sufficient
This is general planning preparation. These situations need a qualified professional, and often the relevant authority.
- Choosing a waterproofing approach, which is a design determination for qualified professionals
- Judging whether an existing or proposed arrangement is adequate for a particular space
- Specifying equipment, discharge arrangements, alarms or any part of a drained route
- Standing in for waterproofing design, structural design or drainage design
The checklist
Work through the sections
Tick the boxes on paper or on screen — nothing is stored, so print the page if you want to keep your marks.
1.Who is designing this, as a role of its own
Waterproofing below ground is a specialist design responsibility rather than a product choice. Establishing who holds it is the first useful thing an owner can do.
Ask who is responsible for the waterproofing design on this project, and write down the name of the person or organisation rather than a job title.
This role is frequently assumed to sit with the structural designer, the contractor or a supplier, and it is worth finding out which it actually is.
Ask at what point that person became involved, and whether they were involved before the structure and the excavation approach were settled.
Waterproofing brought in after the structural decisions are made is working within constraints it had no part in setting.
Ask what their scope includes and what it excludes, particularly whether it covers the design, the specification, site attendance and any review.
Design, supply and installation are frequently separate scopes, and the gaps between them are where below-ground arrangements come apart.
Ask whether anybody independent of the design team reviews the waterproofing proposals, and record the answer alongside the names of everyone involved.
An owner cannot review this work, but it is entirely reasonable to know whether anybody else does and who that is.
Keep a written note of who said what about the waterproofing and when, in the same file as the drawings and the correspondence.
Below-ground problems tend to surface long after handover, when who was responsible for what has become genuinely difficult to reconstruct.
2.Which approach is proposed and why
There is more than one way of dealing with water below ground, and they leave the owner in very different positions afterwards. Knowing which is proposed is not a technical question.
Ask whether the proposal excludes water from the space or manages water that reaches it, and write the answer down in those terms.
This single distinction determines almost everything about what an owner is left with, and it is rarely put to owners plainly.
Ask whether the approach was chosen deliberately for this site and this use, or followed from what was already being done, and record the answer.
Approaches that arrive by default rather than by decision are the ones least likely to have been matched to how the space will be used.
Ask whether more than one approach is being used together, and if so which parts of the space each one applies to.
Combinations are common, and knowing which arrangement applies where matters when something later needs attention in one part of the space.
Write down what the space will actually be used for and what will be kept in it, and check that whoever is designing the waterproofing has been told.
The intended use is what the design is matched to, and a room described as storage that becomes a bedroom is a different question entirely.
Whether a below-ground space suits a particular use is a professional determination, and what applies to occupied rooms below ground varies by location; confirm it with the relevant local authority.
Ask what has been assumed about water in the ground here, and whether that came from investigation or from general knowledge of the area.
The basis of the assumption is worth knowing, and it connects this conversation to whatever ground investigation has been carried out.
Ask what would happen if conditions on site turned out to differ from what was assumed, and who would make the decision at that point.
Ground reveals itself during excavation, and knowing in advance who decides what happens next is worth more than the reassurance itself.
3.If water is being managed rather than excluded
An arrangement that collects and removes water hands the owner something that has to keep working. These questions are about what that means in practice.
Ask where water collected by the arrangement goes, and whether it leaves by gravity or has to be lifted to reach its discharge point.
Whether anything has to keep operating is the difference between an arrangement you maintain and one you operate, and it follows from this answer.
Ask what the discharge goes into, and what happens to it when that receiving system is already full during the same weather.
This is a question the owner will care about most on the worst night of the year, and it is much better asked at design stage.
Ask what happens to the space if power is lost, and write down that answer in full rather than as a summary.
A space below the water level outside behaves very differently when equipment stops, and the honest answer shapes whether the use is appropriate.
Ask whether there is any alarm or monitoring, where it would sound, who would hear it, and what somebody hearing it should do.
An alarm nobody can hear and nobody has been told about is not doing anything, and that is an owner-side arrangement to settle.
Ask where the route can be reached for cleaning, and whether those points will still be reachable once the floor finish and linings are complete.
A route that stops being reachable has not stopped needing maintenance; it has only stopped being able to receive it.
Ask who is expected to maintain the arrangement once the building is occupied, and how often, and record the answer as an owner obligation.
The answer is usually the occupier, and it is better to know that while you can still ask questions about it.
4.Everything that interrupts it, and everything done to it later
Below-ground arrangements are interrupted at predictable places, and they are most often damaged by ordinary later work carried out in good faith.
Ask which services pass through the below-ground construction, where each one enters, and who is responsible for the arrangement at each crossing.
Every service entry is a point where the arrangement is interrupted and re-formed, and those points are frequently in nobody's scope.
Ask how the arrangement is continued at the base of stairs, at thresholds and at internal and external corners, and note the answers.
These are the places where a route is interrupted and has to be re-formed, and they are worth being aware of as an owner.
Ask what the rule is for fixing anything to the walls of the finished space, and write it down somewhere the household will actually find it.
A shelf fixed through a lining is an ordinary domestic act and is one of the most common ways a below-ground arrangement is defeated.
Do not fix anything into the walls or floor of a below-ground space until you have asked whoever designed the waterproofing what is permissible.
Ask how linings, heavy fixed items and any floor build-up are supported, and whether anything is fixed back through the arrangement behind them.
How the finishes are held is what decides whether a later occupier can hang anything anywhere, and it is settled long before they move in.
Ask who should be contacted before any future alteration to the space, and keep that name with the property papers rather than only in email.
Below-ground alterations happen years later, when the project team has dispersed, and a name recorded now is the only thread back.
5.The record you need at handover
An occupier who does not know a route exists behind the walls cannot maintain it or explain it to anybody else. The handover record is what prevents that.
Ask for a drawing or written description showing where any channel, access port, sump or equipment sits, and keep it with the property papers.
This is the document a future occupier or a future contractor needs, and it can only be produced by people who were there.
Ask for the documentation covering any equipment installed in the space, including what servicing it expects, who supplied it and who installed it.
Equipment documents disappear quickly after handover, and they are what make later servicing straightforward rather than exploratory.
Ask for the discharge route to be described in writing, including where it goes and where any non-return provision sits if there is one.
The discharge is the part of the arrangement furthest from the room and the part an occupier is least likely to know exists.
Ask for a note of who to contact for each part of the arrangement, and keep it somewhere the household can find without searching.
Contact information stored in a project folder is effectively lost, and the moment it is needed is not a good time to look for it.
Ask what guarantee or warranty terms apply, what they expect of you in maintenance, and keep those documents with the rest.
Terms attached to these arrangements frequently place obligations on the occupier, and reading them at handover is better than reading them later.
What any guarantee or warranty covers, and what it requires of you, is a question for the party who issued it rather than something to infer.
Make sure everyone in the household knows what is behind the walls, and keep the record with the documents that would pass on at a sale.
The most common failure of a below-ground record is that only one person ever knew it existed.
6.Living with the space afterwards
The intended use and the actual use of a below-ground room frequently diverge. Thinking about that now is part of deciding whether the proposal suits you.
Write down what you would put in the space, particularly anything you would not want to be damp, and check that against how the space is described.
Rooms described as storage end up holding things people care about, and the divergence between description and use is where disappointment starts.
Ask how the space is ventilated, what it is expected to feel like in use, and whether that changes between seasons.
Conditions below ground are not like conditions elsewhere in a house, and owners rarely ask what to expect until they are living with it.
Ask whether anything should be kept clear of the walls or the floor, and write down whatever you are told before furniture arrives.
Instructions given verbally at handover about keeping things off a wall do not survive the first rearrangement of the room.
Ask what you should watch for in normal use and what would be worth reporting, and note who it should be reported to.
Owners are the only people who see the space regularly, and knowing what is worth mentioning makes that observation useful.
Write down what you would do if the arrangement stopped working, including who you would call and what you would move first.
A written plan made calmly is worth a great deal more than a decision made at the time, and it takes very little effort now.
7.If the arrangement is already there
Owners frequently inherit a below-ground space rather than commissioning one. The questions are similar but the answers have to be found rather than asked for.
Search the property papers for anything describing the below-ground arrangement, and write down explicitly what you found and what you did not.
A stated absence tells a professional where to start, and it is the most common finding when a space was created by a previous owner.
Note what is visible in the space now — an access cover, a chamber, a control, an alarm panel, a pipe leaving a wall — and photograph each.
The visible parts are the thread back to what is behind the linings, and they are frequently the only evidence an arrangement exists at all.
Ask whoever you bought from what they know about the space, who installed it and whether anything was ever serviced, and record their answers.
The previous occupier is often the only source, and the opportunity to ask usually lasts a short time after the purchase.
Record what you can see and leave it at that, rather than opening covers, running equipment or investigating what is behind a lining.
Investigating an arrangement you do not understand is how it gets damaged, and there is nothing an owner learns that way.
Do not open access covers, operate equipment or disturb linings in a below-ground space; take what you have found to a qualified professional.
Decide and record that you will have the space looked at by a qualified professional before altering, decorating or fitting out any part of it.
Fitting out is exactly when these arrangements are defeated, and the decision is much easier to hold to once it is written down.
Preparation
Documents and information to gather
Having these to hand usually makes the first conversation shorter and more useful.
- A written note of who holds the waterproofing design role, what their scope covers and when they were appointed
- Whatever is known about water in the ground here, including any ground investigation report
- Drawings or descriptions showing where any channel, access port, sump, equipment or discharge route sits
- Documentation for any installed equipment, including what servicing it expects and who supplied it
- Guarantee or warranty documents for the arrangement, with any maintenance obligation marked up
- For an existing space, whatever the purchase file and the previous owner can say about what is there
- Dated photographs of everything visible in the space, including covers, controls and pipes leaving walls
Records
Decisions to record before work begins
Write these down in your own words, with the date, so everyone is working from the same version.
- What the space will actually be used for and what will be kept in it, stated plainly
- Whether you accept an arrangement that has to keep operating, if that is what is proposed
- Who in the household knows what is behind the walls and where the record is kept
- The rule about fixing anything to the walls or floor, written somewhere the household will find it
- Who you would contact for each part of the arrangement, and for what
- That you will have an existing space looked at professionally before altering or fitting out any part of it
Professional review
Questions to discuss with qualified professionals
Bring these to the relevant qualified professional, supplier or authority. Requirements vary by project and location.
- Who holds the waterproofing design role here, and what does their scope include and exclude?
- Is water being excluded from this space or managed once it reaches it?
- Was that approach chosen for this site and this use, or did it follow from decisions already made?
- Where does collected water go, and what happens when the receiving system is already full?
- What happens to the space if power is lost, and is that consequence acceptable for what I intend to use it for?
- Where can the route be reached for cleaning, and will those points still be reachable after the floor is finished?
- Who is expected to maintain this once the building is occupied, and how often?
- What may and may not be fixed to the walls and floor of the finished space?
- What written record of the arrangement will I be given at handover?
Blind spots
Commonly overlooked items
- The waterproofing design role being assumed to sit with somebody who does not hold it
- Access ports that stop being reachable once the floor finish and linings are complete
- An alarm that nobody has been told about and that sounds where nobody is listening
- The discharge route and any non-return provision, which nobody thinks about until the worst weather
- A shelf or a radiator fixed through a lining by somebody who did not know what was behind it
- A room described as storage during design that becomes occupied accommodation afterwards
- Only one person in the household ever knowing that any of this exists
What this checklist does not do
- Waterproofing a below-ground space is a specialist design determination. Nothing here chooses an approach, assesses one, or establishes whether any arrangement suits a particular space.
- Do not open access covers, operate equipment or disturb linings to find out what is behind them; take what you can see to a qualified professional instead.
- Do not fix anything into the walls or floor of a below-ground space until you have asked whoever designed the waterproofing what is permissible.
- What any guarantee or warranty covers, and what it requires of you, is a matter for the party who issued it, and not something to settle by reading the document alone.
More preparation
Related checklists
Inspiration
Related Ideas Library pages
Design directions to explore once the preparation is done.
Go deeper
Related Build Design Hub guides
Explanatory planning guidance behind the decisions on this page.
Structural Discussion Preparation Checklists
How to prepare a conversation with a structural engineer or surveyor — what to observe and record, and what only a qualified professional can establish.
Browse all Structural Discussion checklists →